ballast water treatment manufacturer profile
ERMA FIRST ESK Engineering SA
ERMA FIRST ESK Engineering SA is a ballast water treatment manufacturer based in Greece. [S1]
- Country
- Greece [S1]
- Website
- ermafirst.com
Evidence scope
The retained official product route documents: ERMA FIRST, part of the ERMA TECH GROUP of Companies This dossier uses that cited route as the editorial scope. [S7]
ballast water treatment
ERMA FIRST, part of the ERMA TECH GROUP of Companies [S7]
Product range and documented series
ERMA FIRST, part of the ERMA TECH GROUP of Companies [S7]
- Service temperature: 3°C [S3]Evidence scope: Service temperatureSource note: Suitable for fresh waters (0.9 PSU salinity) & low temperature waters (3°C)
- Capacity range: 50 – 3740 m 3 /hr [S4]Evidence scope: Capacity rangeSource note: Covering an extensive capacity range of 50 – 3740 m 3 /hr and certified for operation in the most challenging conditions, ERMA FIRST FIT BWTS is the ideal solution for all types and sizes of ships.
- D2 Ballast Water Performance Standard deadline: September 2024 [S5]Evidence scope: D2 Ballast Water Performance Standard deadlineSource note: ERMA FIRST has been supporting shipowners in Asia for many years and this Type Approval opens up a whole new market for the ERMA FIRST FIT BWTS ahead of the D2 Ballast Water Performance Standard deadline, in September 2024.
- Servicing network: 46 countries [S6]Evidence scope: Servicing networkSource note: ERMA FIRST provides sales, maintenance and training to clients via a network of offices in 46 countries.
Documented specifications
Procurement fit
ERMA FIRST ESK Engineering SA is documented to fit ballast water treatment procurement for ships operating in fresh waters at 0.9 PSU salinity and low-temperature waters at 3°C. Its documented capacity range is 50 – 3740 m 3 /hr, covering all types and sizes of ships, with Type Approval supporting market access ahead of the September 2024 D2 Ballast Water Performance Standard deadline. After-sales support includes sales, maintenance and training delivered through offices in 46 countries.
Technical capabilities
ERMA FIRST ESK Engineering SA’s documented ERMA FIRST FIT ballast water treatment system covers a capacity range of 50 – 3740 m 3 /hr and is suitable for fresh waters (0.9 PSU salinity) and low temperature waters (3°C). Its Type Approval supports market access ahead of the D2 Ballast Water Performance Standard deadline in September 2024. The company provides sales, maintenance and training through a network of offices in 46 countries.
Markets and applications
ERMA FIRST ESK Engineering SA’s documented facts point to ballast water treatment markets serving ships across Asia and other regions, with applications for fresh waters at 0.9 PSU salinity and low temperature waters at 3°C. Its ERMA FIRST FIT BWTS covers capacities from 50 – 3740 m 3 /hr and has Type Approval supporting market access ahead of the D2 Ballast Water Performance Standard deadline of September 2024. Sales, maintenance and training are provided through offices in 46 countries, indicating broad commercial and servicing coverage.
Evidence limitations
The documented facts do not establish the BWTS’s installation footprint, ownership structure, financial condition, customer retention, measured performance outcomes, or comparative advantages. They also do not confirm service in fresh waters beyond the stated 0.9 PSU salinity, operation below 3°C, coverage of the full 50 – 3740 m 3 /hr range under every condition, compliance with the September 2024 D2 Ballast Water Performance Standard deadline, or the extent of the servicing network beyond its presence in 46 countries.
Editorial summary
ERMA FIRST ESK Engineering SA offers the ERMA FIRST FIT ballast water treatment system, suitable for fresh waters with 0.9 PSU salinity and low temperature waters at 3°C. The system covers a capacity range of 50 – 3740 m 3 /hr for different types and sizes of ships, and its Type Approval supports market access ahead of the September 2024 deadline for the D2 Ballast Water Performance Standard. ERMA FIRST has supported shipowners in Asia for many years and provides sales, maintenance and training through a network of offices in 46 countries.
Compiled prose, not a quotation. It restates facts drawn from the cited rows above and adds none of its own. It is not itself a sourced record, so read the cited sections for the authoritative wording.
Frequently asked questions
What ballast water treatment product is documented for ERMA FIRST ESK Engineering SA?
The retained product material names Service temperature: 3°C. The dossier keeps this as a product-level statement rather than using it as a claim about the company's entire catalogue. [S3]
Research notes
The retained first-party packet supports a richer product-level reading surface, but it does not yet contain 600 words of distinct cited content. This noindex dossier remains in reviewing status until additional source-backed facts are retained.
- [S1] GreeceMade in Greece 2013
- [S2] ermafirst.comermafirst.com
- [S3] Service temperature: 3°CSuitable for fresh waters (0.9 PSU salinity) & low temperature waters (3°C)
- [S4] Capacity range: 50 – 3740 m 3 /hrCovering an extensive capacity range of 50 – 3740 m 3 /hr and certified for operation in the most challenging conditions, ERMA FIRST FIT BWTS is the ideal solution for all types and sizes of ships.
- [S5] D2 Ballast Water Performance Standard deadline: September 2024ERMA FIRST has been supporting shipowners in Asia for many years and this Type Approval opens up a whole new market for the ERMA FIRST FIT BWTS ahead of the D2 Ballast Water Performance Standard deadline, in September 2024.
- [S6] Servicing network: 46 countriesERMA FIRST provides sales, maintenance and training to clients via a network of offices in 46 countries.
- [S7] ERMA FIRST, part of the ERMA TECH GROUP of CompaniesERMA FIRST, part of the ERMA TECH GROUP of Companies