For steel inspection, select kV to achieve adequate penetration first, then use mA and exposure time to reach the detector signal required for defect contrast and acceptable noise.
The Idaho National Laboratory steel-equivalency workbook provides a physics-based starting point for exposure selection, while a working setup must also account for steel grade, geometry, filtration, detector, source-to-object distance, and allowable dose [S1].
How kV, mA, and thickness interact
Tube voltage sets the maximum photon energy: operation at 100 kV corresponds to a maximum possible photon energy of about 100 keV [S5]. The INL model identifies the X-ray generator kV setting as the maximum energy, Emax, used with material thickness when calculating transmission [S1].
Increasing kV raises beam energy and penetration, but it also reduces radiographic contrast, so the practical setting must be high enough to expose the steel without unnecessarily sacrificing defect discrimination [S2][S4]. Increasing mA at a fixed kV and exposure time raises photon output and detector signal without changing the individual photon-energy spectrum [S4][S5].
For example, 100 kV and 2 mA represent approximately 200 W of electrical input under a simplified DC relationship of P ≈ kV × mA. That is not 200 W of X-ray power, because most energy deposited at the anode becomes heat; allowable power instead depends on focal spot, anode construction, cooling, and duty cycle [S5].
Set penetration before detector exposure
The INL workbook was built to determine whether an object can be imaged and to establish starting exposure settings before field imaging.
Use the calculated transmission to judge whether the proposed kV can pass the steel section. If the material is too thick or geometrically complex, raise kV or change the source configuration rather than trying to recover penetration with mA alone. mA cannot replace photon energy when the beam lacks the energy required to traverse the section [S1][S5].
For very heavy sections, source choice becomes part of the thickness calculation. The practical threshold depends on geometry and equipment capability, not steel thickness alone.
Compare the main setting methods

A calculation model supports equipment selection and exposure planning, but a manufacturer chart reflects a validated tube, target, filtration, and detector combination. Both are valid starting points, while a controlled test image is the final arbiter for a production part. [S5]
The selection is clear: use the workbook or an equivalent calculation to reject obviously unsuitable operating points, use a validated chart to narrow the range, and use test images to establish the final mA and time. Selecting only by thickness ignores composition, section shape, source-to-object distance, filtration, and detector response.
Choose mA and exposure time within thermal limits
Milliampere-seconds quantify total tube-current exposure through mAs = mA × time. A 4 mA exposure for 10 seconds and a 10 mA exposure for 4 seconds both produce 40 mAs, but their heat loading, motion tolerance, and generator behavior can differ [S4][S5].
Use higher mA when the tube permits it and a short exposure is needed to suppress blur. Reduce mA and extend time when motion is controlled and the tube has adequate heat capacity.
Do not calculate power without checking the tube rating. Electrical load can be expressed approximately as kV × mA, but permitted operating conditions depend on focal-spot size, anode design, cooling method, and duty cycle [S5]. An industrial X-ray system should be operated within its published voltage, current, power, and duty-cycle limits.
Account for steel composition and construction

Steel thickness is a starting variable, not a complete material description. The INL workbook uses modeled X-ray energy spectra and material thickness to support an X-ray transmission calculation, but attenuation also varies with composition and density, while fabrication geometry can create locally thicker sections [S1].
For forgings, castings, welds, and layered assemblies, use the maximum radiographic path length rather than nominal wall thickness. Include the material grade, thickness tolerance, gaps, backing plates, and any dissimilar material in the path. These variables can shift the transmission more than a modest change in mA.
Control contrast, noise, and radiation dose
Lower kVp can improve separation of intensity levels within the spectrum and contrast, but insufficient penetration makes the geometry darker and can obscure the target discontinuity. The correct compromise is the lowest kV that produces a usable image through the full steel path [S2][S4].
Once kV is fixed, mA and time control the recorded signal. A detector with inadequate signal cannot be repaired by post-processing, while excessive exposure consumes tube and detector life and increases dose. For industrial radiography, the INL workbook was designed to reduce the dose needed to complete an imaging operation in keeping with the ALARA principle [S1].
Shielding calculations require measured or defensible tube-output data. One worked 150 kVp example gives 5 R/min/mA at 1 m with minimal filtration under BS 4094 reference conditions; the cited conversion yields 2.63 Gy/h at 1 m for 1 mA. Filtration, distance, geometry, and mA can alter the actual result, so this value is a shielding input, not a universal output specification [S3].
Qualify the final steel exposure

Run a representative setup before production and record the kV, mA, time, source-to-object distance, filtration, detector, exposure geometry, and steel grade or thickness. Reject the setup if penetration is incomplete, contrast is inadequate, noise obscures the defect target, or the tube approaches its heat and duty-cycle limits. [S5]
For repeatable inspection, use exposure charts for each qualified geometry and verify them after changes to source, filtration, detector, distance, or material. The INL workbook can establish the starting point, but only a qualified image confirms that the selected combination of penetration, signal, contrast, and resolution meets the inspection requirement [S1].
Two trackable controls provide the clearest audit trail: first, retain the calculated Emax and thickness used to select kV; second, record the achieved mAs and tube-duty limit for the final image. Changes to any one of those variables require revalidation before the inspection recipe is released.