How to Specify an 800 VDC Rack Power Shelf

Table of Contents
  1. Rack and facility equipment have separate specifications
  2. Put the power interface and responsibility in the same drawing
  3. Add operating-point and acceptance requirements to the RFQ
  4. Evidence the project still needs
How to Specify an 800 VDC Rack Power Shelf

Vertiv's November 17 portfolio update describes a 90 kW rack power shelf that converts 800 VDC to 54 VDC. Buyers comparing rack-level DC/DC converters can use that defined interface to ask for operating-point data and build a written acceptance plan. [S1]

Rack and facility equipment have separate specifications

On November 17, 2026, Vertiv announced the addition of pod and data-hall systems to its 800 VDC portfolio. The company describes the PowerDirect 3000 as a 90 kW, 1U in-rack shelf that converts 800 VDC to 54 VDC for compute trays. It labels 98.5% as peak efficiency and lists 180% pulse power for 0.5 milliseconds. Vertiv separately describes the 5 MW PowerNexus MV SST as a system that converts medium-voltage AC to 800 VDC on the facility side. [S1]

In an earlier announcement on September 29, 2026, Infineon said it would supply silicon carbide devices for Eaton's MVSST 2.0. The platform is a medium-voltage solid-state transformer intended for deployments across Asia-Pacific that target an 800 VDC architecture. This announcement documents an upstream equipment relationship between Infineon and Eaton. [S2]

Put the power interface and responsibility in the same drawing

An 800 VDC bus can divide the equipment scopes on the project drawing. The facility design specifies how the DC feed is provided and protected. The rack contract specifies what voltage range the shelf can accept at its terminals and what output it will maintain under the compute tray's loads. Vertiv and Infineon describe separate products and architectures, so interoperability belongs in an integration requirement. Assign one party to approve the interface drawing and reconcile limitations across the quoted equipment. [S1][S2]

Use the advertised peak and pulse points to locate the relevant test reports. A peak efficiency figure describes one operating point. A pulse percentage has to be read with its stated duration. The buyer's rack load profile gives the comparison its context. Ask suppliers to assess the same profile so purchasing can compare energy losses and engineering can assess transient response and thermal recovery under the intended operating conditions. [S1]

Separate the site-specific availability question from the architecture comparison. Date-stamped model and configuration confirmations make it possible to distinguish an evaluation sample, the quoted production configuration and the unit that will actually be delivered. The two announcements establish what the companies described on their respective dates. A bidder's written offer supplies the availability terms for the buyer's site. [S1][S2]

Add operating-point and acceptance requirements to the RFQ

Before issuing the RFQ, include a drawing that identifies the 800 VDC feed, the proposed disconnect and the 54 VDC load boundary. Ask the shelf vendor for input voltage tolerance, output regulation and the documentation required to coordinate protection. Have the rack integrator identify the connector, enclosure and service clearances for the configuration on the quote. Reference the same drawing revision in the facility procurement package. [S1]

When soliciting efficiency data, give each bidder the same input, tray load schedule and environmental assumptions. Ask for measured losses at those points, including the energized condition at low load. Require the vendor to name the test method, measurement boundary and configuration. Compare the reported data with the system cooling and power assumptions before using the peak figure in the financial model. [S1]

If the tray load changes quickly, request the shelf's transient limits, the applicable repetition envelope and recovery behavior. Before approving a sample, agree on the representative loads, pass criteria, instruments and test records. Ask for the part and revision identifiers on the resulting report, and match those identifiers to the unit on the quote. [S1]

If facility conversion and rack shelves come from separate contracts, require a joint interface review before release for manufacture. Use that review to agree who owns the response to a fault, how each equipment scope reports status and where the installer can obtain the drawings. Ask each bidder to state delivery milestones and what data, equipment and site access it needs for factory and site acceptance. [S1][S2]

Evidence the project still needs

Request the current shelf data sheet and the qualification records behind its stated conditions. For the specific facility design, obtain the engineering approval for the protection and control interface, the supplier's confirmed production configuration, and written delivery terms. Keep the qualification decision open until the project team can trace these documents to the equipment it plans to order.

2 sources
  1. vertiv.com
  2. infineon.com

Need to source matching manufacturers or get a quote?

SpecForge connects industrial buyers with verified manufacturers. Submit your requirement and we will route it to matched suppliers.

Submit RFQ now →
Ask SpecForge AI