A shielded cable installation should use 360° shield bonding at both ends for effective EMC performance, with the cable shield connected to exposed conductive parts at both ends when the equipment occupies one equipotential bonding area [S3].
The referenced guides cover extruded-dielectric substation cable systems [S1] and provide general information about power-cable installation [S2], while Shawflex offers 600 V, 1000 V, and 2000 V shielded VFD cable [S4].
Select the Shield Construction Before Installation
Foil, braid, and hybrid shields are not interchangeable: the construction must match the interference frequency, required coverage, flexibility, grounding method, and installation environment [S6].
Southwire's guide provides installation information for extruded-dielectric substation cable systems [S1]. For low-noise signal connections, the SH6850 example is a shielded cable available in 1, 2, 5, and 10 m lengths, with 68-pin and 50-pin connectors for specific MIO-series hardware [S5].
Compare the principal options by coverage, mechanical durability, termination complexity, and application. Copper-tape VFD designs add a shield and three balanced grounding paths to address EMI, common-mode or ground current, and reflected waves [S4].
Do not select a shield by conductor cross-section alone. Specify the cable voltage, conductor material, insulation type, shield material and coverage, armor, grounding arrangement, operating environment, and required connector or gland interface before ordering.
Install the Shield as a Continuous Electrical Layer
Shield effectiveness depends on bonding over 360° and connecting at each end of the cable, rather than attaching a pigtail or leaving the shield open [S3]. For equipment in the same equipotential bonding area, connect the shield to exposed conductive parts at both ends [S3].
The shielding should be bonded over 360° to be effective [S3]. A one-end connection to exposed conductive parts can be dangerous, and the shielding is not effective at high frequencies [S3].
The shielding should be bonded over 360° to be effective [S3].
Connection of the shielding is important for EMC, and for computer equipment and digital links the shielding should be connected at each end of the cable [S3].
Control Routing, Separation, and Mechanical Stress

For power-cable installation, Southwire identifies equipment, training radius, handling and storage, pulling tension, sidewall pressure, conduit fill, and lubrication as separate installation controls [S1][S2].
When using shielded cables, determine how the shielding will be bonded, including the type of earthing, connector, and cable entry [S3].
Terminate VFD and Instrument Cables Without Losing the Shield
VFD cable terminations should preserve the copper-tape shield, armor where fitted, and the three balanced grounding paths described in the Shawflex guide, because the installation determines whether the cable’s EMI, common-mode, ground-current, and reflected-wave benefits are realized [S4]. The guide covers 600 V, 1000 V, and 2000 V VFD cable for unarmored and armored designs [S4].
Prepare the shield and fitting in a controlled sequence: identify the shield boundary, remove only the jacket and preparation material required by the fitting instructions, avoid nicking the conductor, install the fitting, and confirm continuous contact around the shield. The required PPE, enclosure fittings or glands, heat-shrink tubing, and termination hardware depend on the selected cable and enclosure [S4].
For the SH6850 installation example, power down the computer before removing or replacing a board bracket, connect the specified 68-pin or 50-pin connectors, and fasten the shield ground strap so that it does not dangle [S5]. The 50-pin-to-50-pin ribbon cable in that legacy system is 3 in long, while the SH6850 cable options are 1, 2, 5, and 10 m [S5].
Do not treat a product-specific guide as a universal rule for unrelated cable types. The relevant manufacturer’s termination instructions, the enclosure ingress requirement, and the project electrical code govern the final assembly. The Shawflex guide explicitly does not replace the National Electrical Code or Canadian Electrical Code [S4].
Handle Ground-Potential Differences Deliberately

Connecting the shield at only one end can leave the shield ineffective at high frequencies and can create a dangerous shield voltage during an insulation fault, while bonding both ends across different equipotential-bonding areas can permit high fault current through the shield [S3].
Where equipment is not in the same equipotential bonding area, select the bonding arrangement through the system design rather than by installer preference. The Electrical Installation Guide states that a parallel earthing conductor may be required beside the shielded cable, with its size determined by the short-circuit current for that part of the installation [S3]. A well-meshed earthing network can mitigate the issue, but that condition must be verified rather than assumed.
For industrial signal systems, distinguish the shield from the protective conductor. The shield reduces electromagnetic coupling and interference; it is not automatically an acceptable substitute for protective earthing or a fault-current path. Inspect the control cable schedule for shield continuity, drain-wire treatment, and any specified single-end or both-end arrangement.
Use measured equipotential information to resolve the decision. If the two devices share the same verified bonding network, use the specified both-end shield connection. If they do not, have the design authority or electrical engineer select the alternative, including any parallel protective conductor and its calculated size.
Accept the Installation by Test, Not Appearance
A completed installation should be accepted only after visual inspection confirms that the shield is continuous at both terminations, the clamp or gland contacts the shield over 360°, no drain strand is trapped or dangling, and the cable retains the specified bend radius and mechanical support [S3][S4].
Record the cable identity, route, both termination locations, shield-bonding method, enclosure entry, and test result. For the legacy SH6850 example, the acceptance check includes a fastened shield ground strap rather than a loose or dangling strap [S5]. For VFD terminations, verify that the shield remains continuous through the enclosure entry and that the armor and grounding conductors are terminated according to the cable-specific guide [S4].
Where the specification requires electrical testing, define the test voltage, measurement method, acceptance criterion, and instrument calibration before installation. Do not invent a universal resistance or hipot threshold from a general guide. The Southwire publication is expressly general information rather than authority for design, construction, or use, and design and installation should be performed by competent professionals using accepted engineering practices [S2].
Before energization, inspect connector retention, shield contact, grounding continuity, cable movement, and separation from interference sources. If a shield is discontinuous, the bond is not circumferential, or the shield was damaged during pulling, terminate the cable again or replace the affected section before acceptance. Escalate bonding arrangements that cross separate equipotential areas to the responsible electrical designer.
Align the Installation with the Project Standards

Installation drawings, manufacturer instructions, and applicable jurisdictional electrical codes form the governing document set. The Southwire power-cable guide covers general information for extruded-dielectric systems and explicitly states that it is not authority for design, construction, or use [S1][S2].
Use the exact cable model, voltage class, conductor material, shield construction, armor type, and connector or gland assembly identified in the approved bill of materials. The VFD guide provides product-specific termination instructions for 600 V, 1000 V, and 2000 V copper-tape-shield cable, with and without interlock armor [S4]. The Electrical Installation Guide requires 360° bonding for effective shielding and specifies both-end connection for computer equipment and digital links [S3].
Do not cite a general installation guide as a substitute for NEC, CEC, or other applicable regional requirements. The Shawflex document states that it does not replace either code and requires applicable regional rules to be followed with the guide [S4]. For newer installations, the practical reference is the 2026-08 EMC implementation material on shielded-cable bonding, combined with the cable manufacturer’s current instructions and the project specification [S3].
Close the installation package with test results, photographs showing both terminations, the as-installed cable route, the shield-bonding decision, and any approved deviation. These records make future troubleshooting faster and prevent a generic shield fault from being misdiagnosed as an equipment failure.
The first trackable commissioning signal is shield continuity and bond verification at both ends; the second is the absence of shield damage, cable movement, and loss of separation after thermal cycling and equipment startup.