Holding high-alloy irons at 480°C for 1 hour per 25 mm (1 inch) of thickness removes about 60% of the stress [S5].
Class 25–40 gray irons typically have an ultimate tensile strength of 25,000–40,000 psi [S1].
Stress Relief Cycle for Gray Iron
Gray iron develops residual stress because mold surfaces solidify and contract before the internal core, creating restrained contraction and thermal gradients. Stress-relief heating lets the iron matrix micro-yield while the casting is held near its stress-relief temperature, reducing the force that can cause distortion after material removal [S1][S2].
A 2-inch governing section therefore calls for at least 2 hours of soak, while a 4-inch section calls for at least 4 hours. These figures describe thermal holding time, not total furnace time.
Temperature Limits and Metallurgical Risk
Thermal stress relief before final machining can reduce the risk of dimensional changes caused by residual-stress redistribution during service [S1].
For high-alloy iron, published heat-treatment data show that holding at 480°C (900°F) for 1 hour per 25 mm (1 inch) of thickness removes about 60% of the stress [S5]. The same source evaluates stress relief at 675°C (1,250°F) as a higher-temperature treatment [S5]. This is not a substitute cycle for ordinary gray iron, since alloy content, matrix structure, and section geometry can change the response.
Cooling Must Be Controlled

The cooling phase is as consequential as the holding temperature.
Another foundry treatment description uses a controlled cool after a 900–1,200°F hold to reduce the risk of renewed differential contraction [S6].
This treatment is not interchangeable with dimensional stress relief before machining because the temperature, purpose, and cracking mechanisms differ.
Compare Stress Relief with Other Cast-Iron Treatments
Ferritizing annealing is a different operation, with recommended temperatures of 700–760°C (1,300–1,400°F) for most gray irons [S3].
Holding high-alloy irons at 480°C for 1 hour per 25 mm (1 inch) of thickness removes about 60% of the stress [S5].
The practical comparison is dimensional stability versus preservation of structure.
Where the Cycle Fits in Machining

Stress relief should occur before final machining. Residual-stress redistribution after machining can move precision machine tool bases by thousandths of an inch, disturb hydraulic-manifold gasket faces, and drive pump-housing bores out of round [S1]. Thermal stress relief should precede final machining because machining a casting to final dimensions while it retains residual stress can cause progressive dimensional change during service [S1].
IS 13655:1993 provides heat-treatment guidance for gray, ductile, and malleable cast irons, including gray and ductile iron among its covered materials. Its treatment methods are general guidelines, which supports using the supplier or heat treater to define a cycle for the specific alloy, geometry, and acceptance criteria rather than treating one universal recipe as a material specification [S4].
Limits, Failures, and Process Controls
An under-soaked or rapidly cooled casting can retain enough stress to distort during finish machining. Conversely, excessive temperature or time can soften the matrix, alter graphite behavior, or cause oxidation, changing properties that the stress-relief operation was intended to preserve [S1].
Three process variables require separate limits: a 100–200°F per hour heating ramp, one hour per inch of section thickness at 1,000–1,150°F with a 2-hour minimum, and a 50–100°F per hour controlled cool through at least 800°F [S1]. For a 3-inch section, the corresponding minimum hold is 3 hours; the controlled 200°F cooling span from 1,000°F to 800°F takes at least 2 hours and up to 4 hours at the stated range.
Cycle records should identify the load, part geometry, temperature range, hold time, ramp and cooling rates, and thermocouple results. IS 13655:1993 also requires the final value observed or calculated for determining compliance with the standard to be rounded in accordance with IS 2:1960, so inspection data should retain the original readings and the documented rounding convention [S4].
Before releasing a cycle, verify the actual maximum section, alloy grade, as-cast condition, machining allowance, dimensional acceptance limits, and whether the part was flame hardened. A 2-inch minimum soak for a 1-inch casting is not a fixed substitute for a 2-hour soak for a 4-inch casting, and neither replaces load-specific thermocouple review [S1].