Table of Contents
  1. What kVA means for an induction melt shop
  2. Published kVA demand by furnace capacity
  3. Shared transformers and dual-furnace systems
  4. Plant demand needs more than furnace kVA
  5. Compare demand criteria across furnace arrangements
  6. Failure modes and procurement checks
  7. Build the utility request from operating data
Size Foundry Induction Power Demand in kVA

An induction melt shop should size its incoming electrical demand from the furnace transformer capacity: Published examples include a 120 kVA transformer requirement for the 0.05 t GW-0.05T-100KW/1S model [S7], while S5 lists 0.25–15 t furnace capacities and a 250–9000 kW power range without providing capacity-specific transformer ratings.

S3 states that the GW0.1-10T equipment consists of one power supply cabinet serving one furnace pot and one backup pot, while S4 describes an 8-ton dual-furnace system in which one power cabinet serves two furnaces.

What kVA means for an induction melt shop

Transformer kVA represents apparent power capacity, while induction furnaces are commonly described by rated power in kW, useful output frequency, input voltage, and melt capacity in tonnes [S3][S5]. A utility application must be based on the transformer and feeder rating, not the furnace nameplate kW alone.

The GW-0.05T-100KW/1S furnace is rated at 100 kW, 380 V input, 750 V furnace output, and 1 kHz, with a stated transformer requirement of 120 kVA [S7].

That comparison illustrates why kW alone is an incomplete demand criterion. The shop must also record input voltage, power factor, duty cycle, transformer limits, and whether furnaces can share one supply, because a dual-furnace system can allocate load dynamically within transformer capacity [S4].

Published kVA demand by furnace capacity

The published table shows a 120 kVA transformer requirement for the 0.05 t GW-0.05T-100KW/1S model [S7]. These are equipment-level reference points, not a complete plant load calculation.

A second supplier series lists 0.25–15 t furnace capacities and a 250–9000 kW power range, with the example model KGPS-5T/3000KW [S5]. Equipment selection, not a universal kVA-per-tonne rule, should drive the calculation.

Shared transformers and dual-furnace systems

foundry electrical power demand in kVA for an induction melt shop - Shared transformers and dual-furnace systems
foundry electrical power demand in kVA for an induction melt shop - Shared transformers and dual-furnace systems

A dual-furnace architecture can reduce installed transformer demand by allowing one power cabinet to serve melting and holding, with intelligent allocation constrained by transformer capacity [S4]. The published 8 t dual-furnace system provides high-voltage output up to 5,400 V [S4].

The published 8 t dual-furnace system claims up to 25% power savings per ton [S4]. Transformer kVA, efficiency, and production strategy therefore have to be evaluated together.

For load planning, identify whether each furnace has a dedicated transformer or whether a shared supply carries simultaneous melting and holding. The induction furnace arrangement must preserve the transformer limit during peak operation, including any connected capacitor and power-control equipment.

Plant demand needs more than furnace kVA

Transformer capacity is the starting point for the electrical room, but a foundry service request also covers pumps, fans, ventilation, compressors, lighting, controls, casting auxiliaries, and future expansion. The published table lists water-cooling consumption of 5 t/h for the 0.05 t GW-0.05T-100KW/1S model [S7].

The associated degassing unit and other melt-treatment equipment can add electrical demand, while holding furnaces may overlap the melting cycle. The utility load request should separate connected load from coincident operating load and identify which equipment can remain off during peak furnace demand.

National demand context also matters for utility planning. Grid Strategies forecast U.S. electricity demand growth of 15.8% by 2029, including 61 GW of preliminary updates, while manufacturing indicators suggested up to 20 GW of growth (2024-12) [S2]. A foundry with a several-thousand-kVA connection should therefore request a service study that includes its expected operating schedule and expansion plan.

Compare demand criteria across furnace arrangements

foundry electrical power demand in kVA for an induction melt shop - Compare demand criteria across furnace arrangements
foundry electrical power demand in kVA for an induction melt shop - Compare demand criteria across furnace arrangements

For a decision comparison, a dedicated furnace offers the simplest electrical isolation, while a shared dual-furnace system can improve utilization, but it requires verified load-allocation logic and a transformer sized for coincident demand [S4]. The comparison below uses published equipment data [S3][S4][S5].

Do not select the lowest kVA figure without checking operating mode.

Failure modes and procurement checks

Transformer sizing fails when the shop assumes every furnace can melt at full rating simultaneously, ignores holding and auxiliaries, or treats operating kW as a guarantee of utility capacity. The published 1.5 t operating example uses 1,350 kW, a 720 mm induction-coil diameter, a 1,500 kVA transformer, three-phase six-pulse input, a 45-minute melting cycle measured at 1,500°C for iron, and 530 kWh per ton of molten iron [S8].

At procurement, request the furnace input voltage, rated kW, operating frequency, transformer kVA, power factor, harmonic and power-quality data, cooling requirements, and the permitted transformer overload profile. A 6 kV or 10 kV oil-immersed furnace-transformer option is available for power-frequency metal melting, but it is a different supply architecture from the published 380–1,000 V medium-frequency systems [S6].

Protection also needs to cover the induction power equipment rather than only the incoming feeder. The 8 t system specification includes motorized air switches rated at 3,000 A for KGPS-8T-3 and 3,500 A for the other two variants, together with copper busbars from 100 mm × 10 mm to 120 mm × 10 mm [S4]. Those component ratings must be coordinated with the transformer and protection plan.

Build the utility request from operating data

foundry electrical power demand in kVA for an induction melt shop - Build the utility request from operating data
foundry electrical power demand in kVA for an induction melt shop - Build the utility request from operating data

A defensible foundry demand submission lists each furnace’s transformer kVA, input voltage, rated kW, operating frequency, cooling load, melt cycle, and holding schedule, then identifies simultaneous operation and plant auxiliaries [S3][S5]. The same record should state whether a second furnace is permitted on the same supply and the maximum acceptable transformer loading.

Two trackable signals should govern procurement: the vendor-confirmed transformer kVA for each selected model, and the utility’s approved connection capacity for the site. The 0.25–15 t range published for steel-shell equipment spans 250–9,000 kW and 300–8,000 kVA, while the 0.05–10 t range in the other series spans 120–6,500 kVA [S3][S5]. Those endpoints define the shop’s comparison window, not a universal plant demand.

Frequently asked questions

What operating and electrical data should be requested from an induction furnace supplier before sizing the utility connection?

Request input voltage, rated kW, operating frequency, transformer kVA, power factor, harmonic and power-quality data, cooling requirements, and the permitted transformer overload profile. Also confirm whether the furnace has a dedicated transformer or shares capacity with holding and auxiliary equipment.

What cooling-water flow rates are published for induction furnaces from 0.05 t to 10 t?

The published table lists water-cooling consumption of 5 t/h for the 0.05 t GW-0.05T-100KW/1S model [S7]. These auxiliary requirements should be included in the foundry’s plant-load assessment alongside pumps, fans, ventilation, compressors, controls, and casting equipment.

9 sources
  1. Demand Progress — Grassroots, Nonpartisan Organizing
  2. Strategic Industries Surging: Driving US Power Demand
  3. 2 Tons Capacity of Casting Melting Furnace for Industry Foundry
  4. 8T Remote-Controlled Medium Frequency Induction Furnace with Dual-Furnace Power System
  5. Steel Shell Induction Melting Furnace 0.25-15T Capacity 250-9000KW Power for Metal Foundry
  6. Oil-Immersed Power Frequency Furnace Transformer for Metal Melting 6kV 10kV (2025/08/07 00:00:00)
  7. Gw Industrial Melting Furnace for Steel, Iron, Stainless Steel, Aluminum, Copper Induct…
  8. Electric metal melting foundry Induction furnace
  9. Foundry electric crucible smelting induction furnace

Need to source matching manufacturers or get a quote?

SpecForge connects industrial buyers with verified manufacturers. Submit your requirement and we will route it to matched suppliers.

Submit RFQ now →
Ask SpecForge AI