EIA forecasts Henry Hub natural gas to average $3.37/MMBtu in 2026 and $2.88/MMBtu in 2027, while industrial consumption rises 1.2% and 1.7%, respectively [S1][S2].
The chemicals subsector is the largest U.S. industrial gas user, supplying process heat, electricity, and feedstock for methanol, fertilizer, and hydrogen [S2].
Gas Cost Outlook for Chemical Producers
The EIA forecast puts Henry Hub at $2.87/MMBtu from November through March, 16% below the previous month's forecast and 36% below the prior winter [S1]. EIA expects production growth to exceed combined domestic demand and exports, leaving inventories about 3% above 2026 levels on average in 2027 [S1].
The February 2026 STEO estimated the 2026 Henry Hub spot price at $4.31/MMBtu, the August forecast reduced it to $3.44/MMBtu, and the current forecast places this year's average at $3.37/MMBtu [S1][S4]. The 2027 forecast of $2.88/MMBtu is 14.5% below the 2026 estimate [S1].
For chemical plants, the relevant cost is not only the hub quotation. Delivered gas includes transportation, distribution, storage, balancing, and regional supply conditions. A plant evaluating new production capacity should therefore model gas supply by location and contract structure rather than applying one Henry Hub number across every operating region.
Chemical Output Can Rise Without Matching Gas Demand
Industrial natural gas consumption averaged a record 23.6 Bcf/d in 2025, 1% above the 23.4 Bcf/d record set in 2023 [S2]. EIA expects consumption to rise by 0.3 Bcf/d, or 1.2%, in 2026 and by 0.4 Bcf/d, or 1.7%, in 2027 [S2].
EIA projects industrial gas demand to increase by 1.2% in 2026 and 1.7% in 2027, while efficiency gains offset some increases in industrial activity [S2]. Efficient process heaters and heat-recovery systems reduce the gas required per unit of output [S2].
That relationship favors plants with modern furnace, reformer, and heat-integration systems. It also changes how a project should be evaluated: incremental chemical output can improve asset utilization without requiring an equal increase in gas burn. Feedstock conversion efficiency, steam-to-methane ratio, boiler and reformer thermal efficiency, and product yield remain more important than chemical tonnage alone.
U.S. Gas, European Gas and Asian Gas

Global gas prices present a much sharper cost challenge than the U.S. Henry Hub market. The monthly near-month futures price at the European benchmark Dutch Title Transfer Facility averaged $11.27/MMBtu in February [S1].
Export-terminal maintenance can temporarily remove U.S. LNG feedgas capacity, with Freeport alone removing roughly 2 Bcf/d of nominal capacity, before affecting the pace at which domestic production reaches international markets [S4].
Industrial gas buyers in Europe and Asia face greater exposure to LNG availability, shipping constraints, and benchmark spreads than U.S. buyers facing a well-supplied hub. The LNG Carrier Newbuild and Secondhand Value Decision Guide provides a separate framework for assessing the vessel-capacity side of that exposure, but plant economics still depend on delivered gas cost and contractual flexibility.
Seasonality Changes the Monthly Gas Burn
Winter consumption is higher because industrial facilities use more gas for heating. November heating degree days are forecast to be 13% fewer than the 10-year average for the month [S1].
Chemical operators should separate feedstock consumption, which may run continuously, from space-heating and heat-only loads, which vary with weather. A plant with flexible boilers, weather compensation, or heat storage can reduce peak-season purchases, but those measures do not reduce the gas used as molecular feedstock.
Cost Drivers and Total Operating Impact

The first gas-cost driver is the benchmark itself. EIA's forecast moves from $3.37/MMBtu in 2026 to $2.88/MMBtu in 2027, a reduction of $0.49/MMBtu [S1]. Physical supply also affects the domestic balance because forecast U.S. production growth is expected to outpace demand from domestic sources and exports, leaving inventories about 3% above 2026 levels on average [S1].
The third driver is contract structure. Spot-linked purchases expose a buyer to near-term price movements, while firm transport and storage commitments add fixed charges regardless of usage.
Total cost of ownership extends beyond the molecule. It includes boilers, burners, reformers, insulation, compressors, heat exchangers, steam systems, maintenance, and the production lost when heat supply limits chemical output. Efficiency measures can lower both fuel use and emissions, but capital cost, turnaround time, and equipment compatibility must be included. Specifying a chemical anchor for storage or transfer equipment without checking material compatibility, pressure rating, and required service life is false economy.
Selection Criteria for Industrial Gas Buyers
Henry Hub exposure, international LNG linkage, and contract flexibility should drive procurement decisions. A U.S. Gulf Coast chemical complex may gain from domestic supply growth and Henry Hub exposure, while European and Asian plants face materially higher benchmark prices and greater supply-chain risk [S1][S4].
For U.S. facilities, compare delivered hub-indexed cost with a contract that includes fixed transport and storage components. For export-exposed or imported-gas operations, add cargo availability and regional premium to the commodity price. A global portfolio may diversify benchmark exposure, but it introduces freight, terminal, and cargo-quality variables that a domestic plant does not face.
This method is not suitable for treating gas as a fixed production cost. It is appropriate for load forecasting, heat-system investment, chemical expansion screening, and contract evaluation. It is less suitable for short-duration commodity trading, where storage, optionality, and delivery constraints dominate industrial operating economics.
Risks to the Forecast

Weather, LNG outages, exports, and winter demand can break the annual price path. EIA assumed 13% fewer November heating degree days than the 10-year average, producing a November 2026 storage forecast of 3,840 Bcf, 67 Bcf above the prior monthly forecast [S1].
International supply remains exposed to tanker strikes and logistical disruption through the Strait of Hormuz, which have kept LNG exports below pre-war levels [S1]. In the United States, Freeport maintenance removed roughly 2 Bcf/d of nominal export capacity in August 2026, while EU inventories were 60.8% full on August 15, below the five-year seasonal minimum [S4].
European industrial gas use remained broadly flat in 2025 as higher prices depressed industrial demand, and high LNG spot prices created a similar constraint in Asia [S8]. A plant should therefore stress-test output against both a $2.88/MMBtu 2027 Henry Hub case and a high-import-price case. Track monthly EIA STEO price revisions, industrial consumption against the 23.6 Bcf/d 2025 baseline, and LNG export performance against the 19.0 Bcf/d 2027 forecast [S1][S2].