AI Liquid Cooling Procurement: How to Specify Pumps, Valves, Filters and Sensors

Table of Contents
  1. 1. Separate the facility circuit from the server circuit
  2. 2. Establish thermal duty before selecting a pump
  3. 3. Build an operating envelope for each component
  4. 4. Qualify the coolant and wetted materials together
  5. 5. Set filtration requirements from the protected equipment
  6. 6. Make the measurement plan part of the purchase
  7. 7. Compare service conditions as well as rated capacity
  8. 8. Agree on acceptance evidence before ordering
  9. What should go into the enquiry package?
Illustrative industrial infrastructure image

A liquid-cooling quotation becomes useful when its capacity is tied to a defined coolant, operating temperature and hydraulic duty. Before asking suppliers for a price, document how heat moves through the proposed system and which company is responsible for each interface.

This guide addresses single-phase, direct-to-chip cooling with a liquid-to-liquid coolant distribution unit. Immersion cooling and liquid-to-air CDUs have different interfaces and require their own specifications.

The purchasing objective is a component package that meets the required cooling duty under agreed operating and maintenance conditions. That calls for more than selecting individual items with adequate nameplate ratings.

1. Separate the facility circuit from the server circuit

A liquid-to-liquid coolant distribution unit transfers heat between the facility water system and a separate technology cooling system serving the IT equipment. Its pumps and controls manage the server-side coolant circuit. Vertiv describes this separation and the control of coolant temperature, pressure and flow in its technical overview. Vertiv CDU overview

Prepare two sets of operating conditions. On the facility side, record available water temperatures, flow, pressure and heat-rejection arrangements. On the technology side, obtain the server supplier's permitted coolant, inlet conditions and pressure limits. Identify which hoses, manifolds and connections fall inside each supplier's scope.

Attach a marked-up piping and instrumentation diagram to the request for quotation, or RFQ. Ask each bidder to return it with exclusions and changes highlighted. This prevents a quotation for the CDU alone from being compared with one that includes distribution pipework and rack connections.

2. Establish thermal duty before selecting a pump

For a single-phase liquid, the basic heat balance is:

Heat removed = mass flow × specific heat capacity × coolant temperature rise.

Consider an illustrative calculation, not a recommended design point. Assume a 100 kW heat load, a 10 K coolant temperature rise and water with a specific heat capacity approximated as 4.18 kJ/(kg·K):

Mass flow = 100 ÷ (4.18 × 10) ≈ 2.39 kg/s.

With density approximated as 1 kg/L, this is about 144 L/min, rounded from 143.5 L/min. These rounded water properties are calculation assumptions. They must be replaced with the specified fluid's properties at the relevant temperature. The example excludes design margins, branch imbalance and pump heat.

That result estimates heat-carrying flow. It does not establish the pump pressure required to move the liquid through cold plates, couplings, filters and pipework. Keep the thermal calculation and the hydraulic calculation as separate, connected parts of the design review.

For a centrifugal pump, request a performance curve showing the proposed operating point for the specified liquid. ASHRAE's hydronic-system guidance explains that glycol solutions affect heat transfer, piping resistance and pump characteristics. A curve for water should not silently stand in for a different coolant. ASHRAE hydronic-system guidance, section 2.11

3. Build an operating envelope for each component

The following RFQ questions are intended to make offers comparable. The selected equipment supplier and system designer must supply the numerical limits.

ItemRequired purchasing informationEvidence to request
Pump and driveRequired flow at calculated system resistance; liquid composition and temperature; control range; agreed unavailable-pump conditionModel-specific curves, electrical demand and duty-point calculation
Heat exchangerThermal duty; inlet and outlet temperatures; flow on both sides; pressure losses; approved fluidsSelection calculation with all rating conditions visible
Control and isolation valvesIntended function; pressure and temperature envelope; wetted materials; actuator behavior on power or signal lossExact valve and actuator combination, sizing calculation and materials declaration
Filter assemblyRetention requirement; clean and service-limit pressure losses; fluid compatibility; maintenance arrangementElement specification, retention-test basis and service instructions
Hoses and couplingsExact mating interfaces; pressure-temperature limits; bend and routing constraints; seal materialsAssembly drawings, compatibility evidence and defined leakage-test results
Flow, pressure and temperature instrumentsMeasurement range, accuracy under application conditions, wetted materials and signal interfaceModel configuration, installation requirements and calibration documentation

For a plate heat exchanger, specify which temperatures apply at the CDU connections and which apply at the rack. For a control valve, state whether it modulates flow, isolates a branch or performs another function. Similar connection sizes do not make those duties interchangeable.

4. Qualify the coolant and wetted materials together

The material review must include every item that contacts the fluid, including seals, hoses, connector internals and pump components. The Open Compute Project's water-based-fluid guidance calls for compatibility confirmation across the complete cooling system. Its scope is water-based heat-transfer fluid; it should not be treated as a universal approval for every coolant chemistry. OCP water-based-fluid guidelines

Request a single compatibility submission identifying the coolant product and concentration, the complete wetted-materials list, operating limits and the evidence owner. Ask what happens to that approval if a supplier changes a seal compound or substitutes a hose.

Eaton also emphasizes joint selection of the fluid and loop materials, including corrosion and condensation considerations. A material described as suitable in one cooling application is not sufficient evidence for a different mixed-material loop. Eaton liquid-cooling loop design

Quick-disconnect couplings deserve their own line item. CPC's liquid-cooling material discusses purpose-built connectors and coolant compatibility. Ask the proposed supplier for the exact mating parts, seal specification and tested operating envelope. Do not accept a broad connector-family description in place of the offered configuration. CPC liquid-cooling connectors

5. Set filtration requirements from the protected equipment

Specify the particle-control requirement before choosing a precision filter. The OCP cold-plate requirements explain that filter selection depends on the system's sensitive components, including cold plates and connectors, while filter pressure loss and maintenance also need consideration. That supports a system-specific requirement rather than one micron rating for all AI cooling loops. OCP cold-plate requirements

Have bidders identify the retention rating and the test method behind it. Request the clean-element pressure loss at the specified flow and the condition that triggers service. Also ask how the element will be removed without introducing contamination into the downstream circuit.

The filter-element manufacturer directory can help identify potential sources. Each offered element still needs review for fluid compatibility, retention performance and suitability for the approved housing.

6. Make the measurement plan part of the purchase

Build a tagged instrument schedule around the decisions the cooling system must make. Define where coolant flow, supply and return temperature, pressure and any required fluid-quality variables are measured, and identify who uses each reading.

Use the flow-meter guide to prepare the fluid-property and installation questions. Specify the actual coolant and operating range before accepting a measurement technology. For pressure sensors, distinguish a line-pressure reading from the pressure difference needed to assess a component or circuit.

For every instrument, record its location, units, range, signal, alarm use and calibration requirement. Temperature measurements used together in a heat-balance calculation should have a defined accuracy and time-alignment basis. A dashboard value without its measurement context is difficult to use for acceptance or troubleshooting.

Agree on the response to a missing or implausible reading. A frozen last-known value should not appear to operators as a fresh measurement.

7. Compare service conditions as well as rated capacity

Ask bidders to show the cooling duty available during the maintenance and component-unavailability cases specified by the project. The presence of two pumps is not, by itself, evidence that the required duty remains available when one is unavailable.

Include access space, isolation arrangements, replacement procedures and spare-part availability in the evaluation. A lower initial price may leave important site work outside the offer; quantify those exclusions before making the comparison.

The centrifugal-pump manufacturer directory provides candidates for an initial enquiry. Where the approved design requires branch balancing, the balancing-valve manufacturer directory can support a separate search. Neither category establishes data-center qualification or coolant compatibility. Request application evidence from the shortlisted suppliers.

8. Agree on acceptance evidence before ordering

Define factory acceptance testing and site acceptance testing in the purchase documents. The factory test establishes the offered package's behavior under specified test conditions. The site test must address the installed interfaces and actual controls integration.

Acceptance itemEvidence to agree with the supplier
Thermal dutyRecorded flow and temperatures at the specified load and boundary conditions
Hydraulic behaviorMeasured flow and pressure at agreed operating points, compared with the design calculation
Fault responseA controlled test of the specified failure scenarios, including alarm, control response and recovery
Fluid conditionBaseline fluid identification and agreed analysis results at handover
Leak integrityApproved test procedure, limits, assembly identification and recorded results
MaintainabilityDemonstrated access and the agreed service procedure for replaceable items
Controls integrationCorrect tags, units, timestamps, alarm routing and treatment of invalid readings

Do not fill missing test criteria with generic internet values. Have the responsible designers and equipment suppliers agree on the procedures, limits and permitted test conditions before execution.

What should go into the enquiry package?

Send a system diagram, scope boundary, operating envelope, coolant specification, instrument schedule, acceptance matrix and required delivery dates. Ask suppliers to identify deviations in one consolidated response.

The strongest quotation will make its assumptions easy to inspect. It will explain the conditions under which the equipment meets the duty, the evidence available and the responsibilities that remain with the installer or owner.

Does a 45°C architecture announcement set the temperature for my project?

No. Obtain limits for the exact servers, CDU, coolant and site heat-rejection arrangement. A vendor's architecture-level statement does not replace those project-specific approvals.

Can a general industrial supplier be considered?

Yes, as a candidate. Evaluate the offered model against the same fluid, cleanliness, performance and service requirements as every other bid. A directory entry or general industrial track record is not a substitute for that evidence.

What should be resolved first when quotations disagree?

Compare scope and rating conditions before comparing price. Different inlet temperatures, coolant assumptions or installation exclusions can explain a large difference between offers that initially appear equivalent.

6 sources
  1. Vertiv CDU overview
  2. ASHRAE hydronic-system guidance, section 2.11
  3. OCP water-based-fluid guidelines
  4. Eaton liquid-cooling loop design
  5. CPC liquid-cooling connectors
  6. OCP cold-plate requirements

Need to source matching manufacturers or get a quote?

SpecForge connects industrial buyers with verified manufacturers. Submit your requirement and we will route it to matched suppliers.

Submit RFQ now →
Ask SpecForge AI