A full gantry crane transfers wheel loads through two ground rails and foundations, while a semi-gantry crane combines one ground rail with an elevated building runway.
The configuration choice controls structural steel, runway construction, floor traffic, installation scope, headroom, and maintenance access, so load capacity alone is not a valid basis for procurement.
Leg arrangement and load path
A full gantry crane has a supporting leg at both sides of the bridge. The load path runs from the hoist and trolley through the bridge girder, two gantry legs and end carriages, then into two parallel ground rails and their foundations. This arrangement keeps crane reactions out of the building structure and permits travel across yards, warehouse bays, fabrication areas, and loading zones [S1].
A semi-gantry crane has one ground-supported leg and one end carriage travelling on an elevated runway beam. Its load path is mixed: building columns and brackets support the elevated side, while the floor rail and foundations support the ground leg. The two running levels must remain aligned, and the runway, brackets, columns, and connections become part of the crane's structural interface [S1].
One semi-gantry product family provides a useful capacity comparison: the BMH single-girder model spans 2–16 t, 5–20 m, and has a standard 6 m lifting height, while the BMG double-girder model spans 5–320 t, 6–24 m, and 5–30 m lifting heights [S2]. These are model-specific limits, not universal ranges for either leg configuration.
Civil works, floor space, and installation
A full gantry normally requires two complete lines of ground rail, two leg structures, rail clips, grouting, drainage provisions, expansion-joint details, end stops, and foundations designed for the crane reactions [S1]. The structure can stand independently of the building, which makes it suitable where building columns have little spare capacity or where the crane must extend outdoors.
A semi-gantry needs only one floor rail, but it does not eliminate civil work. The ground-side slab or foundation must support the floor leg, while the existing or new elevated runway must be verified for vertical and lateral crane reactions [S1]. Where a suitable overhead runway already exists, the configuration can use that infrastructure instead of constructing a second full-length ground runway [S2].
One site-selection estimate places the semi-gantry civil-work reduction at roughly 25–40% against a full gantry covering the same working width, subject to the building satisfying three structural conditions [S2]. Both figures are screening estimates, not universal savings, and procurement should replace them with site-specific quantities and priced civil scopes.
Structural coupling and operating flexibility

The full gantry has one consistent support system: two floor rails. Its independent legs simplify the building interface, but the project remains exposed to rail alignment errors, drainage problems, slab deterioration, foundation movement, and vehicle impact [S1]. A semi-gantry reduces the ground footprint but introduces interaction between building stiffness, runway alignment, bracket design, connection detailing, and the ground-leg foundation [S1].
For an existing building, a structural assessment must establish the runway's actual capacity, rail profile, support spacing, connection condition, lateral restraint, and allowable movement. The crane quotation should not be treated as permission to attach runway reactions to an unverified wall or column line. A leased facility, for example, may permit one existing runway while prohibiting broad structural modification [S2].
A full gantry is generally the better fit for an open yard, a new building with limited structural capacity, or a travel route that must pass independently of the building. A semi-gantry is generally stronger where one side has verified elevated-runway capacity, floor traffic must remain open on the opposite side, or a second hook is required beneath an existing overhead crane [S1][S2]. The semi-gantry configuration is not appropriate merely because it appears cheaper in an initial equipment quotation.
Headroom, access, and site constraints
Headroom can govern the semi-gantry selection before rated capacity does. Its girder must clear the lowest obstruction along the intended path, while the elevated runway must accommodate the end carriage, wheel assemblies, brackets, and required movement. If a semi-gantry is installed below an operating overhead crane, the two systems must not interfere, and the required separation must be established from the actual operating envelopes rather than nominal hook heights [S2].
The full gantry also needs vertical clearance above the bridge, but it does not depend on a building-mounted runway beam. Its practical constraints are leg height, trolley travel, approach paths, columns, doors, fire protection, and the lifting envelope across both rails. Maintenance access must cover wheel inspection, rail cleaning, lubrication, electrical components, brakes, and access to the elevated side of a semi-gantry [S1][S4].
Span and headroom should be taken from the required work envelope rather than added by rule of thumb. These dimensions demonstrate how widely the geometry can vary, so operating clearance should be surveyed before selecting either configuration.
Comparison by decision criterion

Against building independence, the full gantry wins because both sides are supported from the ground; the semi-gantry requires a verified building runway and connections [S1]. Against floor occupation, the semi-gantry wins because it uses one floor rail rather than two, while the full gantry consumes floor space on both sides [S2]. Against installation complexity, the full gantry has one continuous support type, whereas the semi-gantry coordinates building steel, brackets, columns, a floor foundation, and two running levels [S1].
Against outdoor or open-yard travel, the full gantry is the stronger option because the building does not carry the runway loads [S1]. Against reuse of an existing overhead runway, the semi-gantry is stronger because one end carriage can operate on the elevated beam while the opposite leg remains on the floor [S1][S2]. Against maintenance, neither arrangement is inherently superior: the full gantry concentrates access at two rail lines, while the semi-gantry adds elevated-runway and building-connection inspection points [S1].
Duty, procurement, and acceptance criteria
Duty class must be specified separately from leg configuration. FEM 1.001 and ISO 4301 classify structural fatigue duty through groups spanning A1–A8 and M1–M8 respectively, with A1–A2 representing infrequent use and A7–A8 representing very high-frequency or continuous operation [S5]. The stated BMH product family is rated A4, while the BMG family is rated A5–A7 [S2]. These ratings identify duty assumptions and cannot be transferred to another crane without engineering review.
Request maximum rated load, span, usable hook height, travel and lifting speeds, duty class, wheel loads, rail reactions, lateral forces, buffer and end-stop loads, runway-beam capacity, bracket configuration, foundation assumptions, and operating clearance for both quotations [S1][S2]. The civil package should separately identify rails, clips, grout, drainage, expansion joints, stops, runway steel, brackets, connections, and foundations. The acceptance test should then verify rail alignment, travel resistance, brake operation, limit switches, load testing, and structural interfaces.
For wheel-interface decisions, compare forged and cast steel wheels in Forged vs Cast Steel Wheels for Gantry Cranes, but keep that comparison separate from the support arrangement. The final procurement record should state the selected configuration, governing load combinations, site dimensions, verified runway capacity, foundation data, supplier scope, and interface responsibilities.