Specify Partial Discharge Monitoring for MV Assets

Partial discharge monitoring covers medium-voltage assets including switchgear, power cables, motors, generators, substations, small transformers and isolated phase bus [S3][S2].

Online, periodic and offline methods provide different balances of diagnostic detail, coverage, operating disruption and deployment cost for medium-voltage maintenance programs [S4][S5].

What Partial Discharge Monitoring Detects

Partial discharge is a localized electrical discharge that does not completely bridge the electrodes, taking the form of a small spark inside or along an insulating surface [S3]. Partial discharge testing can identify defects in medium-voltage assets, especially power cables and switchgear, through offline testing and advanced diagnostics [S1].

PD is not itself a unique cause of failure, but rapidly increasing activity can precede complete insulation failure [S3]. The condition-monitoring context spans stator windings in motors and generators, switchgear and isolated phase bus, where deterioration can be associated with slot vibration, elevated temperature, moisture, contamination, switching surges, lightning surges, mechanical strikes and manufacturing or design defects [S2][S3].

For MV solid-insulation equipment, the observable problem is not simply an absence of sparks. It is the combination of discharge magnitude, repetition rate, phase relationship, waveform pattern and trend. IEEE case studies identify phase-resolved PD patterns, three-phase amplitude relation diagrams and time-of-flight analysis as tools used to distinguish and locate defects in MV cables and switchgear [S1].

Choose the Monitoring Mode

Online PD measurement is performed while the equipment remains energized at normal operating voltage, whereas offline PD testing is performed during scheduled maintenance or commissioning in a controlled environment [S4][S5].

The decision can be made against four criteria: diagnostic depth, asset availability, failure consequence and program cost. Online monitoring is stronger for inaccessible or operationally critical assets because it supports continuous surveillance without taking the asset out of service. Offline testing is stronger for detailed investigation under controlled conditions and for establishing acceptance-test baselines after installation [S4][S5].

Apply PD Monitoring to the Correct Assets

partial discharge monitoring for medium-voltage assets - Apply PD Monitoring to the Correct Assets
partial discharge monitoring for medium-voltage assets - Apply PD Monitoring to the Correct Assets

Partial discharge diagnostics are discussed for medium-voltage equipment such as power cables and switchgear [S1], while Eaton's partial-discharge diagnostics address a range of medium-voltage apparatus including motors, generators, substations, small transformers and cables [S3].

It is not a universal substitute for protection, maintenance or complete electrical testing. A PD signal is evidence of insulation activity, not a complete diagnosis of every failure mechanism, and interpretation can be complex enough to require a multi-faceted diagnostic approach [S1][S3].

The strongest application is usually an asset population containing one or more of three conditions: inaccessible equipment, material operating or replacement cost, and a failure consequence that affects production or safety. PD monitoring is less compelling where the asset is routinely inspected, inexpensive to test offline and already has a demonstrated insulation condition, unless its failure mode is specifically associated with PD activity [S4][S5].

Select Sensors by Measurement Physics

PD monitoring systems use sensors positioned on or near energized equipment to capture high-frequency electromagnetic, acoustic or electrical signals associated with discharge activity [S5]. High-frequency current transformers, UHF antennas, acoustic-emission sensors and transient-earth-voltage sensors are listed measurement options, with the appropriate choice depending on the asset construction and monitoring requirement [S5].

These values describe that vendor's sensor catalogue rather than a universal installation requirement.

For MV rotating machines, sensor selection must support the electrical arrangement and physical construction of the winding. Coupling arrangements that work in a motor stator slot or winding end may not transfer the same signal quality in a switchgear busbar, a cable termination or an isolated phase bus, so comparable PD amplitudes cannot be assumed across dissimilar assets.

Diagnose Causes Instead of Ranking Noise

partial discharge monitoring for medium-voltage assets - Diagnose Causes Instead of Ranking Noise
partial discharge monitoring for medium-voltage assets - Diagnose Causes Instead of Ranking Noise

PD pulse analysis must be interpreted against circuit configuration, phase behavior and physical location because PD alone is not a unique cause of insulation failure [S3]. Phase-resolved patterns can help separate recurring discharge behavior, while three-phase amplitude relationships and time-of-flight analysis can support defect identification and localization [S1].

Environmental and mechanical mechanisms require separate investigation. These causes call for corrective insulation, sealing, contamination-control, surge-protection or mechanical-repair actions rather than a generic alarm response.

A single reading should not become the sole basis for replacement. PD activity can be present before failure, but interpretation and localization are complex, requiring field practice, representative baselines and trend analysis [S1][S4]. Recording the measurement date, test configuration, sensor placement, circuit conditions and asset history is necessary for a technically defensible diagnosis.

Build Baseline and Trend Data

Acceptance PD testing can verify manufacturer test data, identify damage caused by transport or installation, expose poor workmanship and capture a baseline for later comparison [S1][S4]. Commissioning tests are particularly important for MV cables and switchgear because transport, erection and site installation can introduce conditions that were absent at the factory [S1].

For in-service assets, the informative data set is a sequence rather than a single number. A practical record should retain at least the apparent charge in picocoulombs or the instrument's specified measurement unit, pulse count or repetition rate, noise level, phase-resolved pattern, sensor position, test voltage, circuit configuration and comparison with the baseline [S1][S4][S5].

Online monitoring can also provide two or more years of warning of stator-winding failure in suitable motor and generator applications, depending on the defect, monitoring arrangement and interpretation process [S2]. That figure is a vendor-stated condition-monitoring expectation, not a guaranteed remaining-life interval for every MV asset.

Integrate PD With Reliability and Maintenance Controls

partial discharge monitoring for medium-voltage assets - Integrate PD With Reliability and Maintenance Controls
partial discharge monitoring for medium-voltage assets - Integrate PD With Reliability and Maintenance Controls

PD data becomes actionable when it is connected to asset condition thresholds, work planning and operating context. An ISO 17359 condition-monitoring program can place online or portable PD measurements within a wider process of objectives, sensors, data acquisition, diagnosis and maintenance action [S1][S5].

For motors and generators, PD monitoring must be coordinated with the wider electrical and mechanical condition baseline. Useful cross-checks include winding resistance, insulation resistance, polarization index, power-factor or dielectric-loss measurements, temperature, vibration and air-gap data where applicable. None of these measurements independently replaces PD localization, but together they reduce the risk of attributing a complex failure to the wrong mechanism.

Continuous systems can transmit data to SCADA or asset-management platforms and support historical comparison, alerting and predictive maintenance workflows [S5]. By contrast, an instrumented medium-voltage VFD or AC motor installation still requires documented sensor compatibility, electrical isolation, safe access and a defined response to abnormal PD levels.

Source, Install and Validate the Program

Acceptable monitoring scope should define the asset family, nominal voltage, test and operating voltage, available outage windows, sensor access, required diagnostic outputs and alarm-routing responsibilities. The three recognized delivery modes are online, periodic and offline PD monitoring, with continuous monitoring forming the installed, always-on version of online surveillance [S4][S5].

Supplier documentation must identify the sensor type, measurement bandwidth, frequency range, measurement unit, calibration method, applicable apparatus and installed-environment limitations. Portable instruments need test leads or couplers with suitable voltage ratings; installed sensors need safe interfaces for live insertion, isolation, remote communications and maintenance replacement.

Commissioning the monitoring system should include proving that normal interference does not trigger nuisance alarms, that a detectable test signal reaches the acquisition chain, that time synchronization and phase labeling are correct, and that alarm escalation reaches the responsible operator. For switchgear, humidity and contamination also need consideration because these environmental factors can create or worsen discharge conditions and obscure the asset trend [S8].

The next verification point is not another vendor demonstration. It is a field correlation: compare PD patterns with the first energized operating period, inspect accessible defects or maintenance findings, review sensor noise and phase behavior, and revise thresholds only from documented evidence. That closes the loop between an electrical signal and a maintenance decision.

Frequently asked questions

When is online partial discharge monitoring preferable to offline testing for medium-voltage assets?

Online monitoring is preferable for inaccessible or operationally critical assets because it provides continuous surveillance without removing the asset from service. Offline testing is better for detailed investigation under controlled conditions and for establishing post-installation acceptance-test baselines.

Which medium-voltage assets are suitable for partial discharge monitoring?

Suitable assets include MV cables and terminations, switchgear, motors, generators, dry-type transformers, substations, and isolated phase bus. Monitoring is especially valuable where equipment is inaccessible, replacement is costly, or failure could affect production or safety.

Which partial discharge sensor types are available for medium-voltage monitoring?

Sensor selection depends on the asset construction, electrical arrangement, physical installation, and monitoring requirement.

Should a single partial discharge reading trigger replacement of an MV asset?

No. A single reading should not be the sole basis for replacement because partial discharge is not a unique cause of insulation failure. Diagnosis should combine discharge magnitude, repetition rate, phase relationship, waveform pattern, location, representative baselines, and historical trends.

10 sources
  1. Identification of Defects in MV Equipment through Advanced ...
  2. Partial Discharge Monitoring
  3. Advances in Preventive Maintenance for Medium-Voltage Equipment by ...
  4. What Is Partial Discharge Testing? - Electrical Reliability Services
  5. Partial Discharge Monitoring Technology
  6. Partial Discharge Monitoring Guide for High-Voltage Assets
  7. Advancements in online partial discharge monitoring and ...
  8. Partial Discharge in MV Switchgear: Causes & Detection
  9. The invisible threat in medium voltage switchgear: Partial discharge (Jun 2, 2026)
  10. On-line partial discharge monitoring in medium voltage underground cables