A glycol dehydrator dries natural gas and similar hydrocarbon streams by counter currently contacting the wet gas with lean triethylene glycol, TEG, in an absorber, the glycol absorbing the water and the gas leaving at a controlled water content or dew point. The rich glycol leaves the absorber bottom, flashes down to low pressure, filters, and regenerates in a still and reboiler package that boils the water off at around 200 deg C, reconcentrating the glycol to lean strengths of 98.5 to over 99.9 percent by plain reboiling, stripping gas, or vacuum, and pumping it back to the contactor top. Properly sized units take pipeline quality gas from water saturated inlet, roughly 30 to 120 pounds of water per million standard cubic feet depending on temperature and pressure, down to 7 pounds per mmscf class, about 4 to 8 pounds by design, meeting pipeline and process water dew point specifications across a wide flow range.
Procurement engineers meet these packages at wellheads and gathering systems, at gas plants ahead of cryogenic processing, at underground storage and city gate stations, on offshore platforms, and on biogas and CO2 bearing streams where hydration and corrosion risks price the water out. The decision this page settles is which contactor and regeneration arrangement match the stream: absorber trays or packing against the dew point target, the circulation rate and lean concentration that deliver it, the reboiler still column design with its fuel and stripping options, the flash tank and emissions management the regulation and the stream demand, and the filter and pump scope that keeps the glycol alive. The answer lands as an RFQ line set, gas flow and conditions, water inlet and target, glycol type and circulation, emissions basis, and code scope, and every chapter below feeds that line set so the unit meets the dew point on the field's gas rather than on the brochure's.
This page treats the glycol dehydrator as a purchasing object: how TEG absorption and regeneration work as one cycle, how circulation rate and lean concentration trade against dew point, what the still, reboiler, flash, and emission hardware contribute, how filters and pumps protect the glycol inventory, and how the whole decision folds into a defensible RFQ. It is written for engineers who specify gas conditioning equipment, not for readers who want a brochure summary.
Chapter 1 / 06
What a Glycol Dehydrator Is and What Is Being Decided
The defining act of the machine is water removal by liquid absorption under pressure, with the absorbent regenerated thermally at low pressure in the same package. Wet gas enters the bottom of the absorber, often called the contactor, and rises against descending lean glycol on trays or packing, the TEG's strong affinity for water pulls the water out of the gas phase, and dry gas leaves the top through a mist eliminator that catches glycol droplets. The glycol leaves the bottom rich in water, and the package's other half, the regeneration system, boils that water off and returns lean glycol, the whole cycle closing on a pump and a heat exchanger train. The machine is bought as that cycle, contactor plus regenerator plus the trim between them, and every dew point promise rides on all of it being right.
What is being decided in this purchase is four commitments at once. First the absorption basis: contactor diameter against gas flow and pressure, trays or packing depth against the dew point target, and the mist elimination scope that keeps glycol in the cycle. Second the regeneration basis: reboiler duty and temperature, lean glycol concentration, plain, stripping gas, or vacuum assisted, and the still column that keeps glycol out of the overhead vent. Third the balance of plant: glycol circulation pump type and energy source, the flash tank and its gas handling, heat exchangers and surge volumes, filters for the glycol loop, and instrumentation from the level and temperature loops to the analyzer that proves the dew point. Fourth the emissions and safety envelope: BTEX and methane management on the regenerator vent, the flare or vapor recovery routing, and the ASME vessel basis of every pressure part. A buyer who leaves any of the four to vendor default gets a package sized to a generic gas that is not the field's.
Against its neighbors the glycol dehydrator occupies precise ground in the gas conditioning train. A knockout drum upstream removes free liquids, the liquid guard this page's feed assumes, and its page owns that vessel. Solid desiccant dehydration, mole sieve and silica gel towers, buys lower dew points and bigger swings in cost and regeneration gas, and is the neighbor the selection chapter prices against on dew point economics. A coalescing filter removes aerosols ahead of processing, a mist eliminator lives inside this absorber as a component, and an air dryer conditions compressed air on the utility side, a different duty entirely that shares only the word dry. On streams carrying both water and condensate the train is knockout, then absorption, then whatever treating the sulfur and CO2 story demands. Naming the neighbors keeps vendors quoting the machine the gas needs.
Standards frame the datasheet. Vessels follow ASME Section VIII for the contactor, flash tank, and surge hardware with the corrosion allowances sour service expects, and the reboiler and still follow the fired and pressure part practice their design implies. Performance language comes from the gas industry's water content and dew point practice, water in pounds per million standard cubic feet or the equivalent dew point at stated pressure, measured at the outlet and contracted against stated inlet conditions. Emissions expectations arrive from the regulation the unit sits under, with the US EPA Natural Gas STAR program's glycol dehydrator guidance documenting circulation optimization and emission management practice the industry quotes. A datasheet that promises a water content with no inlet water basis and no circulation statement is a price tag, not a specification.
The station around the package deserves naming in the RFQ too. An inlet knockout drum or filter separator guards the contactor, and the dry gas outlet may polish through a coalescing filter on aerosol sensitive service. The flash tank gas, mostly methane with the day's absorbed light ends, routes to fuel, vapor recovery, or the flare per the emission philosophy, and the regenerator still vent, water vapor with BTEX and VOC absorbed alongside the water, gets its condenser, flare, or destruction answer by the same philosophy. Glycol pumps come energy exchange designs that scavenge the rich stream's pressure, electric, or gas driven, and the glycol filter loop, sock and carbon stages, keeps hydrocarbons and solids out of the reboiler. Instrumentation runs the cycle, level transmitter loops on contactor and flash, temperature transmitter on the reboiler, pressure readings through the train, and the dew point or moisture analyzer at the outlet where the contract or the pipeline proves the product.
Chapter 2 / 06
How Absorption and Regeneration Make One Cycle
The equilibrium arithmetic writes the cycle. At contactor conditions, TEG's affinity for water sets how much water a given lean concentration can hold against a given gas water content, and the leaving gas trends toward equilibrium with the entering lean glycol at the top of the tower: leaner glycol dries gas further, more contact stages bring the gas closer to the equilibrium limit, and circulation rate supplies the stages with fresh driving force. Design practice sizes the pair together, 98.5 to 99.1 percent lean by plain reboiler regeneration buying typical pipeline specs of 4 to 7 pounds per mmscf, and 99.5 percent plus, stripping gas or vacuum assisted, buying the 1 to 3 pound class for cryogenic feed and deep dew point duty. The buyer states the target and the vendor's calculation shows the stages, circulation, and lean concentration triangle behind it.
Circulation rate is the operating dial that becomes an emissions story if nobody watches it. The classic rules of thumb, roughly 2 to 3 gallons of TEG per pound of water absorbed by rule, sized generously by legacy practice, run many field units rich against their actual duty, and overcirculation costs twice: the reboiler burns fuel proportional to circulation, and every gallon circulated absorbs a little BTEX and methane that leaves through the still vent. The Natural Gas STAR tradition of optimizing circulation to the actual water load is documented as both an emission and a fuel saving, and the modern RFQ asks for the unit to be sized and controlled against the real water profile, turndown on circulation included, rather than run at one inherited number.
Regeneration is a small distillation run well. The rich glycol, flashed and filtered and preheated by the lean glycol leaving the reboiler, enters the still column above the reboiler, water and volatile absorbed components rise as vapor through the column's packing or trays, and the glycol descends to the reboiler pot where about 200 deg C, TEG's boiling behavior at atmospheric pressure allowing, holds the glycol while water leaves. Stripping gas, sparged into the hot lean or the packing above, lowers the water partial pressure and pushes lean concentration into the 99.5 plus class, and vacuum regeneration does the same with pressure instead of gas. The still's overhead, water vapor with BTEX and VOC, is the emission stream the philosophy owns, and the reboiler's fuel, field gas usually, is the operating cost the duty and circulation set. A reboiler sized with margin and a still column with real stages, not a stub, are the difference between lean glycol that meets its number and glycol that circulates tired.
The flash tank earns its place between absorber and regenerator. Rich glycol off the contactor bottom carries absorbed methane and light hydrocarbons, and flashing at an intermediate pressure releases most of them where they can be captured to fuel or vapor recovery instead of leaving through the still vent with the BTEX. Flash tank sizing and residence, with the gas separator function some designs add, set how much of the methane story is recovery rather than emission, and the separator skid around it, level loops and the gas valve, is ordinary instrument work that the package includes. On low pressure absorbers the flash economy shrinks and the vent philosophy carries more of the load, which the emission scope reflects.
Glycol health is a maintenance economics chapter bought at specification. TEG oxidizes and degrades when hot and air exposed, foams when contaminated with hydrocarbons, salts, and solids, and carries iron and corrosion products that plate the reboiler fire side. The filter loop answers, sock filtration for solids, activated carbon for hydrocarbons and surfactants, on side streams of the circulating loop with differential indication, and the package's surge and drain arrangements make the annual glycol analysis and top up a procedure instead of an event. The RFQ scopes the filter stages and the carbon change, states the expected glycol loss per year, and treats the glycol inventory as the consumable it is.
Chapter 3 / 06
Absorber Types, Regeneration Options, and Duty Boundaries
The absorber divides by internals. Trayed contactors, bubble cap trays historically for the turndown tolerance glycol service wants, valve trays in modern practice, run 4 to 10 real stages by duty and target, tolerant of fouling streams and wide swings, the field standard. Packed contactors, structured packing especially, buy the same stages in a shorter, lighter vessel with lower pressure drop, suited to offshore weight budgets and clean gas, at the price of liquid distribution quality requirements and fouling sensitivity. Mist elimination at the top, vane or mesh, keeps glycol carryover in the parts per million the downstream pipeline tolerates, and the contactor's diameter comes from gas rate and pressure with the usual capacity factors, the skid sized through the field's flow range with turndown stated rather than discovered.
Regeneration divides by how lean it goes. The plain fire tube or hot oil reboiler at atmospheric still pressure delivers 98.5 to 99.1 percent lean, the pipeline spec machine, simple and fuel fired from field gas. Stripping gas designs, a sparge into the hot glycol or the still packing, buy 99.5 to 99.9 plus at the cost of the stripping gas volume, vented with the still overhead or recovered on some designs, and vacuum regeneration buys similar concentrations without the gas, at the cost of the vacuum equipment and its discipline. The Drizo class of designs recycles solvent vapor to strip and recovers hydrocarbons as liquid, the emission answer for BTEX heavy streams. The selection chapter prices these against the dew point target and the emission scope, because deep lean glycol bought with stripping gas is a trade, not a virtue.
Boundaries are worth stating bluntly. The glycol dehydrator is the workhorse for pipeline and process dew points, not the deepest dryness machine: mole sieve towers buy the single digit ppm water and the low temperature dew points cryogenic plants demand, at regeneration gas and swing costs, and the selection chapter sends those duties there honestly. It is not a CO2 purifier or a dehydration column for carbon capture product gas, and mid November's CO2 purification and dehydration contract news in the energy press is soft color for the conditioning theme, not a description of these field TEG packages. It is not the knockout drum before it nor the air dryer on the utility skid, and it does not remove acid gas, which belongs to the treating train. The map below compresses the boundaries into one table.
Configuration
Lean TEG class
Best duty
Watch out for
Trayed contactor, fire tube reboiler
98.5 to 99.1 percent
Pipeline spec field and plant duty
Plain regeneration limits dew point depth
Packed contactor, structured packing
As regeneration allows
Offshore and clean gas, weight and height limits
Distribution and fouling sensitivity
Stripping gas regeneration
99.5 to 99.9 plus percent
Cryogenic feed and deep dew point
Stripping gas volume and its vent or recovery
Vacuum regeneration
99.5 plus percent
Deep lean without stripping gas
Vacuum equipment and operating discipline
Solvent vapor recovery Drizo class
99.5 plus with recovery
BTEX heavy streams, emission strict sites
Complexity and solvent handling scope
Flash tank with vapor recovery
As the cycle allows
Methane emission and fuel economies
Flash sizing and gas routing scope
Chapter 4 / 06
Key Specification Parameters
The table below decodes the datasheet lines that decide whether a quoted package dries the field's gas to the pipeline's number. Each row is a purchase defining parameter; the paragraphs after the table explain what to demand and what a weak answer looks like.
Attribute
Typical range or options
What it decides
Gas flow and range
Design with minimum and maximum stated
Contactor diameter and the turndown story
Operating pressure and temperature
With coincident basis and range
Water capacity of the gas and vessel class
Inlet water content
Saturated basis with CO2 and H2S noted
The water load every sizing line hangs on
Outlet water target
4 to 8 lb per mmscf pipeline; 1 to 3 deep
The guarantee and the lean concentration it needs
Lean glycol concentration
98.5 to 99.9 plus percent by method
Regeneration design and dew point ceiling
Circulation rate and turndown
Gallons per hour sized to real load
Fuel, emissions, and control range
Reboiler duty and fuel
kW with fuel gas basis
Operating cost and the still's margin
Emissions scope
Flash recovery, condenser, flare or destruction
BTEX and methane compliance of the vent
Filter scope
Sock and carbon side streams with dP
Glycol life and foam prevention
Vessel code basis
ASME VIII with sour allowances as needed
Legal envelope and corrosion allowances
The water rows carry the guarantee. Demand the inlet water basis with its pressure and temperature, saturation computed or stated, and the outlet guarantee measured at the outlet with the method named, water content by analyzer or the dew point equivalent at stated pressure. Ask for the calculation triangle, stages, circulation, lean concentration, at design and at the field's minimum load, because a unit guaranteed at design flow that misses at half flow is a real field problem. CO2 and H2S in the gas belong in the analysis, both for vessel allowances and because acid gas in the glycol corrodes the regenerator the design should anticipate.
The circulation and emissions rows are where modern specifications earn their keep. Size circulation to the real water profile with stated turndown, and reference the Gas STAR optimization tradition rather than a legacy three gallons per pound rule, and scope the vent philosophy, flash recovery, still condenser, flare or destruction, against the regulation the unit sits under with BTEX estimates on aromatic bearing streams. The second table compresses the duty decision the way a specification meeting argues it.
Stream and target
Configuration to specify
Check before order
Wet gas at pipeline spec, 4 to 7 lb per mmscf
Trayed contactor, fire tube reboiler, flash tank
Circulation sized to real load with turndown
Cryogenic plant feed, deep water
Stripping gas or vacuum regeneration
Lean class basis and stripping gas disposition
Offshore platform duty
Packed contactor, weight optimized package
Distribution quality and motion tolerance
Aromatic or BTEX heavy stream
Condenser and recovery or destruction scope
Vent estimates against the regulation
Sour gas with H2S
Sour service vessels and allowances
Corrosion allowances and glycol pH management
Low pressure storage or biogas
Smaller package with emission tight vent
Methane handling philosophy at low pressure
Chapter 5 / 06
Selection Decision Factors and RFQ Language
The decision sequence is short enough to run as a specification meeting checklist, and each step eliminates a class of quotations before price comparisons begin.
State the gas honestly: flow range with the field's minimum, pressure and temperature range, composition including CO2 and H2S, and the inlet water basis, because every sizing line hangs on that water load.
Fix the target with its measurement: outlet water content or dew point at stated pressure, measured by the analyzer or method the pipeline or process contract uses.
Price the neighbor before the machine: mole sieve's regeneration gas and swing costs against the dew point actually needed, because deep dryness is a real trade and pipeline spec does not need it.
Choose the regeneration class from the chapter 3 map: plain reboiler for pipeline spec, stripping or vacuum for deep lean, recovery class for emission strict aromatics.
Size circulation to the real load with turndown stated, referencing the optimization practice rather than legacy rules, and scope the flash recovery and vent philosophy against the regulation.
Scope the balance of plant: pump type and energy source, heat exchange and surge, filter stages with carbon, mist elimination, and the winterization the site runs.
Fix the vessel basis: ASME VIII with sour allowances where the analysis says sour, still and reboiler design margins, and the burner management scope on the fired reboiler.
Fix the verification evidence: performance test at stated conditions with methods, lean concentration verification, and the emission estimates or measurements the permit process expects.
Against neighboring equipment the comparison a specifier needs runs as follows, and it belongs here in the selection chapter rather than in the page title. The knockout drum removes free liquids before this unit, the liquid guard it assumes. Solid desiccant towers buy deeper dryness at regeneration cost, the trade this page prices. A coalescing filter polishes aerosols, an air dryer is the utility skid's machine sharing a word, and the treating train owns acid gas, not this cycle. The reboiler at the heart of regeneration is a heat exchanger duty of the type its own page covers, bought here inside the package. Name the neighbors in the RFQ and every vendor quotes the same machine against the same gas.
The RFQ block should be written once and reused. A complete block reads: gas flow design, normal, minimum; pressure and temperature range with coincident basis; composition with CO2, H2S, and aromatics flagged; inlet water content basis; outlet water target with measurement method and point; contactor internals and stage basis with turndown; regeneration class and lean concentration basis with reboiler duty and fuel; circulation rate and turndown with control basis; flash tank and gas routing; emissions scope with BTEX and methane management; filter stages with sock and carbon and differential indication; pump type and energy; heat exchange and surge scope; vessel code basis with allowances; instrumentation list including level loops, reboiler temperature transmitter, pressure readings, and the dew point or moisture analyzer; winterization; and the performance test method with guarantees at stated conditions. A quotation returned without the water calculation basis or the emission scope is incomplete at any price.
Chapter 6 / 06
Installation, Standards, Failure Modes, and Maintenance
Installation quality is a skid story told in levels and heat. The package sets with its contactor plumb, absorbers are towers and lean on their verticality for distribution, and the piping follows the process flow with the heat exchanger arrangement's warm side not surprising the cold, the glycol pump installed with its suction flooded. The flash tank and vent lines route where the philosophy drew them, fuel, recovery, or flare, and the still vent's condenser or destruction scope lands before the first hot circulation. Burner management on the fired reboiler commissions with its flame detector and safety shutoff valves proved, and the winterization, heat tracing on glycol and drain lines where the site freezes, is functional before the first cold week has opinions.
Commissioning proves the water number and the cycle's health. Glycol charges to the design inventory, circulation starts at minimum and rises, and the reboiler climbs to temperature on its curve while the still finds its reflux rhythm. The performance test runs at stated conditions, inlet water by analysis or basis, outlet water by the contracted analyzer method, lean concentration verified by sample, and the fuel read against the duty. The emission scope proves what it claims, flash gas flowing to its destination, vent handled per philosophy, and the turndown demonstration matters as much as the design point, circulation and still behavior through the field's minimum load, because fields do not run at nameplate.
Failure modes in service follow a short and predictable list. Foaming heads the field list, hydrocarbon and solids contamination making the absorber foam and carry glycol over, prevented by the filter scope and found by differential and carryover trend, with the carbon change as the remedy. Glycol degradation and losses, oxidation in the hot reboiler with air leaks, thermal cracking in fire tubes scaled or overfired, and carryover losses, show in annual analysis, dark glycol and falling pH, and the inventory top up is the budget line the RFQ priced. Salt accumulation from formation water upsets plates in the reboiler and is purged by drainage and recharge. Reboiler fire tube failure, corrosion and overheating where scaling or level loss uncovers tubes, is the hardware failure that stops the package, and level discipline on the surge and reboiler is its prevention. Still column packing fouling and vent condenser fouling move emissions and lean quality together, and the emission equipment, whatever philosophy bought it, gets its inspection with the rest.
Maintenance intervals scale with stream cleanliness and sourness more than with hours. The filter sock changes and carbon changes follow the differential trend and the analysis, quarterly class on clean duty and monthly on dirty. The glycol analysis itself is the annual health check, water content of the lean, pH, iron, and hydrocarbons telling the whole story cheaply. The reboiler fire tube gets its inspection each year with the burner, still packing and vent equipment at the same stop, and pump rebuilds follow the energy exchange or electric machine's calendar with its spares on site. Every campaign produces numbers, lean concentration, glycol losses, emission flows, that calibrate the next RFQ and the next optimization, which is how a purchasing file gets smarter instead of just older.
FAQ
What outlet water content can a TEG unit deliver?
Plain atmospheric regeneration at 98.5 to 99.1 percent lean TEG delivers the pipeline class, roughly 4 to 7 pounds of water per million standard cubic feet, on typical designs. Stripping gas or vacuum regeneration pushes lean glycol to 99.5 percent and above and the product to the 1 to 3 pound class for cryogenic feed. The guarantee quotes at stated inlet water, pressure, and flow, with the measurement method named, because the number is a cycle property, not a catalog constant.
How is glycol circulation rate set correctly?
Against the real water load, not a legacy rule. Oversizing circulation by the old gallons per pound habits costs fuel proportional to the overcirculation and emissions proportional to what the extra glycol absorbs, BTEX and methane leaving the still vent, which is why the Gas STAR optimization tradition documents both savings. Size to the actual water profile, state the turndown in the RFQ, and control circulation with the field's load rather than one inherited number.
What about BTEX and methane emissions from the still vent?
They are absorbed along with the water and leave the regenerator overhead, and the scope is a purchase decision: flash tank recovery captures methane rich flash gas for fuel or vapor recovery, still overhead condensers recover BTEX as liquid, and flare or destruction handles the remainder where regulation demands. Aromatic heavy streams deserve the emission estimates in the bid, and the condenser or recovery class of designs exists precisely for strict sites.
When does mole sieve beat glycol?
On deep dryness. Solid desiccant towers buy single digit ppm water and the low dew points cryogenic plants and certain product specs demand, at the cost of regeneration gas, tower switching, and higher capital and pressure drop. Pipeline specification water does not need them, and the honest selection prices the two machines against the dew point actually contracted before paying for depth.
Trays or packing in the contactor?
Trays, bubble cap tradition and modern valve practice, tolerate fouling streams and wide turndown and are the field standard, 4 to 10 stages by target. Structured packing buys the same stages in shorter, lighter vessels with lower pressure drop, right for offshore weight budgets and clean gas, but demands good distribution and fouling discipline. Diameter comes from flow and pressure either way, and the turndown statement matters more than the internals religion.
Why is my glycol turning dark and smelling burnt?
Thermal degradation, usually with an air leak at the surge or still letting oxygen at hot glycol, or fire tube overfiring and local cracking where scaling or low level uncovers tubes. The annual analysis tracks pH and degradation products, the air leak gets fixed, the fire tube gets cleaned and fired to curve, and the inventory gets recharged. Filters and carbon manage contamination driven problems, but degradation is a hot glycol chemistry problem fixed at its source.
What instrumentation proves the unit is meeting spec?
The outlet moisture or dew point analyzer is the product proof, with the inlet water basis by analysis, and lean glycol concentration by sample verifies the regeneration side. Around them, level loops on contactor, flash, and surge, the reboiler temperature transmitter holding about 200 deg C, pressure readings through the train, and filter differentials on the glycol loop tell the operating story, and the calibration calendar on the analyzer is the credibility of the whole guarantee.