A loading arm is an articulated assembly of rigid pipe segments joined by swivel joints, balanced and counterweighted or spring-supported, that connects a fixed piping system to a tank truck, railcar, marine tanker, or ISO tank and transfers liquid or gas without the hangar of flexible hoses. The articulation, typically three to seven swivel planes, lets the arm follow the vehicle as it settles on its suspension, reach a range of manifold positions, and park clear when idle. Built in sizes DN 25 to DN 600 and pressure classes to ANSI 300, 600, and beyond for marine duty, loading arms serve fuels and chemicals, acids and liquefied gases, cryogenic service to minus 196 deg C, and vapor recovery streams, at flow rates from a few cubic meters per hour to tanker manifold mains.
Procurement engineers meet this equipment at terminal loading racks, refinery and chemical plant truck and rail stations, port marine berths, and brewery and food tank wash bays. The decision this page settles is narrow and practical: how the reach envelope and drop geometry match the vehicle fleet, which swivel, seal, and balancing architecture survives the product and the cycles, how emergency release and breakaway protection are engineered so a departing truck cannot open the line, and what the marine and land specification lines of an RFQ must say so the arm that arrives is the arm the station needs for twenty years of daily connections.
This page treats the loading arm as a purchasing object: how swivel joints and envelope geometry do the work, how marine and land duty divide the market, what emergency release couplings and breakaway protection buy in spilled-product prevention, and how vapor recovery, balancing, low temperature service, and cycle-life testing combine into a defensible RFQ. It is written for engineers who buy terminal hardware that is connected and disconnected every day, not for readers who want a brochure summary.
Chapter 1 / 06
What a Loading Arm Is and What Is Being Decided
The arm is rigid pipe that behaves like a machine. Between its fixed riser on the rack or berth and its outboard coupler at the vehicle manifold, every joint is a precision swivel, race-supported, sealed, and rated, and every pipe span between swivels is a structural member that the balancing system, counterweights or springs, holds in reach without human strain. The operator swings the arm through its envelope, lands the coupler, makes the connection dry or with a quick-action coupling, and the product flows through a path with no flexing members at all. That is the whole argument against hose: no elastomer aging, no hidden fatigue, no whip when a coupling lets go, a defined envelope that the station layout can engineer around, and a swivel that announces its wear by leaking visibly at a joint instead of failing silently inside a hose carcass.
What is being decided in this purchase is safety hardware with a geometry problem attached. The geometry: the arm must reach every manifold position the fleet presents, high and low, left and right, near and far, without strain and without repositioning the vehicle; a rack arm that reaches only the newest truck in the fleet has redesign in its future. The safety: a loading arm is a pressure path that people connect by hand hundreds of times a year, and the specification's protective layers, emergency release couplings that separate cleanly on drive-away, breakaway devices on the product path, interlocks that stop flow on separation, and vapor-tight connections where emission rules apply, are what convert a departing trailer from an incident into a near miss. Both halves are decided at order, and both appear as RFQ lines in chapter 5.
The market divides first by marine and land. Marine loading arms are the giants: DN 150 to DN 600 articulated structures on berths, with hydraulic or electro-hydraulic maneuvering, triple-swivel riser architectures, emergency release systems with double ball valves and quick couplers, and the design basis of OCIMF guidance for oil, chemical, and gas carriers; they are engineered per berth against vessel manifold tables, tide and surge ranges, and wind loading. Land arms, truck and rail, are the volume market: DN 50 to DN 150 typically, manually maneuvered with spring balance assistance, top loading with drop tubes or bottom loading with dry-break couplings, at terminal racks where a bay may load twenty trucks a day. The vocabulary below serves both, and the type chapter treats them in turn.
The product sets the materials class. Fuels and non-aggressive chemicals run carbon or low-temperature steel with standard seals; acids and solvents run stainless 316L or higher with perfluoroelastomer seals; liquefied petroleum gas and cryogenics, LNG at minus 162 deg C, liquid nitrogen at minus 196, bring aluminum or stainless with extended-stem swivels, vacuum-jacketed or insulated spans, and purge provisions; food and pharma duty brings polished stainless and clean-in-place connections. The seal and swivel package, races, seals, thread locks, is the wear core of the machine, and its chemistry match decides whether the arm services in years or months, a maintenance economics line the parameter chapter prices.
Three neighbors need disentangling because they share the transfer duty. The industrial hose assembly, the lead image's flexible alternative, serves low cycle, low risk, and mobile duty, and its leaf carries the hose engineering; the arm replaces it at high cycle stations for the reasons above, and the selection chapter runs that comparison honestly. The flexible metal hose is the compromise member, often appearing as short jumpovers inside arm installations. The rotary union is a cousin component, a rotating joint for continuous-rotation machinery service, paper and steel lines, and its leaf covers that world; the swivel joints here rotate occasionally through defined envelopes, not continuously. And the camlock fitting and dry-break families are the connection hardware at the arm's outboard end, each with its own leaf, each specified as part of this machine's terminations.
Chapter 2 / 06
How Swivel Joints and Envelope Geometry Do the Work
The swivel joint is the arm's bearing and its seal in one part. A typical design: inner and outer races with ball or roller bearing paths, a bolted or threaded end cap, and a seal stack, often a main elastomer or PTFE-composite seal backed by secondary and dust seals, holding product at full line pressure while the race rotates with sub-degree backlash. Land-duty swivels run 50 bar classes routinely and up to 100-plus for special duty; marine riser swivels carry ANSI 150 to 600 classes with test pressures to match. The engineering numbers that matter at purchase: torque to rotate, new and at end of seal life, because the operator feels it; backlash, because sloppy joints make positioning a negotiation; and certified cycle life, because every connection day cycles every swivel several times.
Envelope geometry is the second half of the machine. The arm's working envelope is drawn from three inputs: the fleet's manifold positions, height above grade or rail top, lateral offset from the arm centerline, and approach distance; the vehicle's suspension travel, a settling tanker drops 100 to 200 millimeters between arrival and loaded departure, and the arm must follow without strain; and the station's constraints, rack structure, adjacent bays, and parking position tolerance of the drivers as they actually drive. From these, the specifier draws the reach rectangle the outboard coupler must sweep and the drop dimension for top loading, and the vendor's arm geometry, inboard and outboard boom lengths, swivel planes, and drop tube length, must cover that rectangle with margin. An arm quoted without the envelope drawing against the fleet table is a geometry guess wearing a purchase order.
Top loading and bottom loading solve different stations. Top loading arms, the classic rack architecture, swing over the tank hatch and lower a drop tube into the vapor space, with the arm following the settling vehicle; they serve legacy fleets, and products where bottom outlets do not exist, and they pair naturally with vapor recovery arms, a separate articulated line taking displaced vapor off the hatch to the recovery system. Bottom loading arms connect under the trailer at a standardized coupler, API RP 1004 dry-break territory in fuels, load faster with less turbulence, enable pre-trip testing of the vehicle's own systems, and dominate modern fuel terminals; their specification centers on the coupler interface, the dry-break, and on reach under the trailer with the operator working at grade. Many racks run both types by bay assignment, and the fleet decides the mix.
Balancing is what makes a manual arm a one-person machine. Spring cylinder balancers, counterweights, and pantograph linkages hold the boom neutral through the envelope so the operator steers rather than lifts; misbalanced arms drift, tire crews out, and get manhandled into early swivel failure, which is why balancing design and its field adjustment belong in the specification. Marine arms go further: hydraulic maneuvering with local or remote control, triple-swivel riser packages, and powered emergency release sequences, because a 16-inch arm full of crude cannot be moved by hand at all. The parking position, where the arm rests between operations, lock pin or rest cradle, is part of the envelope story: the parked arm must clear the vehicle envelope including the worst parking error the station expects.
Emergency release and breakaway protection are the safety systems that justify the premium over hose. The land-duty layering: a breakaway coupling in the product path or on the drop tube that separates at a defined pull force and seals both ends, limiting a drive-away to a spill of the line volume; an interlock or procedure that proves the drain before departure; and where the risk analysis demands, powered emergency release, marine's double-ball-and-quick-coupler systems that part the line at the push of a button with trapped product safely valve-contained on both sides. The engineering honesty is in the numbers: separation force, reseal proof, and flow capacity of the device at full rate, because an undersized breakaway becomes the restriction the station designs around, and an oversized one becomes the weak link that does not separate when a truck leaves with it attached.
Vapor recovery and emission control close the modern station. Stage I and Stage II vapor recovery arms, coaxial or separate vapor lines, return displaced vapor to storage or the recovery unit during loading; vapor-tight connections, poppeted couplers, and vapor arm swivels with low leakage classes are the hardware; and emission rules increasingly make the vapor path part of the loading system's permit rather than an accessory. The measurement and control set that stations hang on the arm, flow metering in the rack, overfill protection sensors at the coupler, static bonding reels, turns the arm into the heart of a loading control system, and the RFQ that treats it as a pipe assembly buys the twenty-first century's most litigated spill risk with nineteenth-century scope.
Chapter 3 / 06
Types, Construction, and Duty Boundaries
Marine arms are engineered per berth. The architecture: a riser tower with the inboard pipe connection, a triple-swivel riser assembly, inboard and outboard booms with their swivel planes, an emergency release system at the outboard end, and hydraulic power and control for maneuvering and release; sizes DN 150 to DN 600 by transfer rate, with the berth's vessel manifold table, tide, surge, and freeboard range setting the envelope, and wind and wave loading entering the structural design. Marine duty brings OCIMF's design guidance for oil and chemical arms, vendor equipment standards for LNG and gas service, and the classification and port authority approvals that a berth commissioning demands. Chicksan-style articulated marine arms and rigid mast-jib designs both serve; the purchase is a berth engineering project with an arm at its center.
Land arms divide by loading position and product class. Top loading arms: counterweighted or spring-balanced, with drop tubes, vapor cones or sealing pods, and optional companion vapor recovery arms; they serve chemical and legacy fuel racks, railcar domes, and any fleet without bottom outlets. Bottom loading arms: reach-under geometry with API RP 1004 couplers or dry-breaks, often with twin-pantograph structures to follow vehicle motion, serving modern fuel and chemical terminals. Specialty land classes: aviation underwing and overwing arms at hydrant stands, brewery and food arms with polished tube and CIP, acid and solvent arms with full alloy and seal packages, and cryogenic arms with vacuum-jacketed spans for LIN, LOX, and LNG trailer service. Each class is a catalog family with an engineered core, and the fleet and product decide the family in one step.
Swivel architecture counts planes against envelope needs. A basic land arm runs three planes, turn on the riser, fold at the elbow, rotate at the coupler; deeper articulation adds planes to follow settling vehicles and awkward manifolds, and marine risers run triple-swivel stacks by default. Each plane is a wear item and a leak path, so the design trades articulation against maintenance: enough planes to cover the envelope without gymnastics, no more. The swivel's serviceability, reseal in place versus removal, spare seal kits as standard supply, is a purchase line because a reseal is a planned hour and a swivel replacement is a rack outage.
Materials and finishes follow product and climate. Carbon steel arms with industrial coatings serve fuels and benign service; 316L stainless serves chemicals and corrosive vapor; aluminum alloys serve cryogenic and weight-sensitive duty; and food-grade arms run polished stainless with drainable, crevice-free internals. Seals are the chemistry battleground: NBR for fuels, FKM for wider chemical ground, PTFE composites and perfluoroelastomers for aggressive and hot service, low-temperature compounds with extension for cryogenics. Climatic options matter more than buyers expect: Arctic stations need low-temperature steels and seals, coastal stations need C5-class coatings, and desert stations need sun protection for spring cylinders and seals whose elastomer life halves with heat.
Duty boundaries, stated bluntly. A loading arm is not a hose reel: low-cycle, mobile, and temporary duty belongs to hose assemblies of the industrial hose family, and the arm's premium pays only where cycles and risk concentrate. It is not a piping expansion provision: thermal growth and vibration isolation belong to the flexible metal hose and expansion joint families; a few arms carry short metal-hose jump-overs for exactly that, but that is termination detail, not duty. It is not a rotating-machine feed: continuous rotation service is the rotary union's leaf. And it is not a marine hose string: hose strings on buoy and manifold duty are the ship-to-shore alternative, and whether arms or strings serve a berth is an OCIMF economics decision per berth; where arms are installed, this page's specification logic applies, and where hose strings serve, the hose leaf's does. The table below consolidates the duty map.
Service
Construction to specify
Boundary to respect
Fuel terminal bottom loading bay
Bottom arm, API RP 1004 coupler, breakaway, overfill interlock
Fleet manifold table drives reach; coupler standard fixed
Chemical rail dome, top loading
Top arm with drop tube, 316L, FKM seals, vapor cone
Seal chemistry against full product list the rack serves
Marine oil berth, DN 400 crude
Hydraulic marine arm, ERS, OCIMF envelope basis
Vessel manifold table, tide and surge, wind loading
The datasheet rows below decide whether a quoted arm matches the fleet, the product, and the station. Each row is a purchase defining parameter; the paragraphs after the table explain what to demand and what a weak answer looks like.
Attribute
Typical range or options
What it decides
Nominal size and rate
DN 25 to DN 150 land; DN 150 to DN 600 marine
Line velocity, transfer time, and arm structural class
Design pressure and temperature
PN 16 to PN 50 land; ANSI 150 to 600 marine; minus 196 to 200 deg C
API RP 1004, dry-break, camlock, flange, hammered union
Fleet standard and emission class
Emergency release
Breakaway coupling or powered ERS with double isolation
Drive-away consequence containment
Vapor recovery provision
Coaxial, companion vapor arm, or none
Emission rule compliance and loading speed
Cycle life, certified
50,000 to 100,000-plus connection cycles design
Decade economics against reseal and overhaul schedule
Insulation and heat trace
None, heat traced, vacuum-jacketed cryo
Product pour and temperature retention duty
Test and certification pack
Hydrotest, swivel proof, ERS function, material certs
The acceptance basis at delivery and at reseal
The envelope row is the one that bites hardest, because it is drawn against the fleet, not the catalog. The RFQ should carry the fleet manifold table, height range, lateral offsets, approach distances, and the settling allowance, plus the parking envelope, and demand the vendor's envelope drawing overlaid on it. Drop tube length on top arms follows the same table, deepest hatch to highest residual level. The quotation that arrives with a generic reach figure and no overlay has not answered the only geometry question the station has.
The swivel and cycle rows price the decade. Demand certified cycle life for the swivel package and the stated reseal interval under the station's duty; demand rotation torque limits, because an arm that grows stiff gets jerked, and jerked arms fatigue at the swivel welds; and buy the spare seal kit with the arm, the first one, not after the first leak. The breakaway and ERS rows carry the safety case: separation force and full-open flow capacity, reseal proof after test, and for powered marine release, the sequence and its fail behavior under power loss. The parallel table compresses the connection-layer decision; the rule under it: the coupler standard is chosen by the fleet and the emission rule, never by the arm vendor's stockroom.
Connection context
Interface to specify
Watch items
Fuel bottom loading, high cycle
API RP 1004 coupler with breakaway provision
Overfill sensor and bonding integrated at the coupler
Chemical transfer, emission strict
Dry-break coupler pair, vapor-tight
Seal compound against full product list
Utility and water service
Camlock or hammer union terminations
Spill tolerance and drainage before disconnect
Marine manifold, oil and chemical
ANSI flange with insulating kit as berth demands
ERS between arm and hose line as designed
Cryogenic trailer
Cryo dry-break with three-position purge
Icing management and vent paths
The instrumentation and vapor rows make the arm a system node: flow metering and overfill protection at the rack read the loading the arm delivers; bonding and interlock provisions belong on the arm order where the station design integrates them; and the vapor path, arm, swivel class, and coupler, carries the emission permit's leakage expectations. A loading arm quoted as pipe geometry with no safety, vapor, or connection scope is half the machine the station will actually operate.
Chapter 5 / 06
Selection Decision Factors and RFQ Language
The decision sequence runs as a checklist, and each step eliminates a class of quotations before price comparison begins.
Write the fleet basis: vehicle types, manifold tables, settling allowance, and parking tolerance, because the envelope is drawn against them and nothing else.
Write the product basis: full product list with temperature and pressure envelope, emission class, and any cleaning or CIP requirement between grades.
Choose land top, land bottom, or marine architecture by fleet and station; do not let a vendor's catalog default draw the station layout.
Draw the envelope and demand the overlay: reach rectangle, drop range, parking clearance, with margin for the drivers the station actually employs.
Fix the connection layer: coupler standard by fleet, dry-break class by emission rule, breakaway by drive-away analysis.
Fix the seal and materials package against the complete product list, including the reseal interval you will live with.
Fix the safety systems: breakaway force and flow proof, ERS sequence for marine, interlocks and bonding at the coupler.
Fix the verification evidence: hydrotest and swivel proof, ERS function test, cycle certification, envelope overlay signed, and the documentation pack with the first seal kit.
Against the neighboring transfer equipment, the comparison a specifier actually runs is the following, and it belongs here rather than in the page title. Against the industrial hose assembly, the arm wins at high cycle and high consequence duty, thousands of connections a year, spill-averse products, emission-controlled vapor paths, by lasting, by defining its envelope, and by failing visibly; hose wins at low cycle, mobile, and mixed-duty stations on first cost and reach forgiveness, and the crossover sits where the maintenance and risk ledger, not the price list, says it sits. Against the flexible metal hose, that family serves short absorption duties inside stations and appears as jump-overs on arms; it is not a rack alternative at cycle counts. Against the rotary union, continuous rotation machinery duty is a different machine entirely. Within the arm purchase itself, the real decision discipline is the envelope and safety layering above; the geometry that does not reach the fleet and the breakaway that does not separate are the two failure modes that end stations, and both are decided on paper in this chapter.
The application map below turns those choices into a table the project file can carry into bid evaluation.
Envelope overlay; coupler interface audit of fleet
Chemical rack, multi-product
316L top arm, vapor cone, FFKM seals, CIP provision
Seal list against every product; changeover procedure
Crude or product berth
DN 300 to 400 marine arm, hydraulic, ERS
OCIMF envelope basis; wind and surge structural pack
LNG trailer station
Vacuum-jacketed cryo arm, purge coupler
Cold torque values; icing mitigation at swivels
Asphalt and heavy fuel rack
Heat traced arm, insulated, high pour design
Drain and purge before disconnect; heat trace class
Acid unloading bay
Full alloy arm, drain-before-release coupler
Seal compatibility dossier; spill containment interface
The RFQ block should be written once and reused. A complete block reads: fleet and vehicle basis with manifold tables; product list with pressure, temperature, and emission class; station layout drawing with the reach rectangle and parking envelope; arm type and size with design code and class; swivel package with planes, torque limits, and certified cycles; materials and seal compounds per product with reseal interval; balancing system and parking provisions; coupler standard and dry-break class; breakaway device with force and flow rating, or marine ERS with sequence and fail behavior; vapor recovery scope where the permit demands; heat trace or vacuum jacket scope for temperature duty; instrumentation interfaces, overfill, bonding, flow; test and certification pack, hydrotest, proof, ERS function, material certificates; and documentation, envelope overlay, maintenance manual, spare seal kit with the order. A quotation returned without the envelope overlay or the safety device data is incomplete at any price.
Chapter 6 / 06
Installation, Standards, Failure Modes, and Maintenance
Installation is structural and geometric. The arm riser mounts to the rack or berth structure with the stiffness the arm's dynamics demand, because a spring-balanced arm on a flexible rack hunts; marine arms found on their towers with anchor bolt and grouting to the berth's structural design. The envelope is verified as-built: the arm swept through its full reach against the fleet table, drop tube travel measured, parking clearance proven with the largest expected vehicle misparked by a realistic margin. Pneumatic and hydraulic power, where fitted, is commissioned with the arm; ERS sequences are function-tested with water before first product, more than once, with the test witnessed; and the bonding, grounding, and interlock chains, coupler to rack to control system, are proven end to end. On cryogenic arms, cooldown procedures with their vent paths are walked through with the operators before the first trailer.
Commissioning is a station event, not a delivery event. The first connections are made with water or product at low rate: envelope coverage re-verified against real vehicles as they settle, breakaway protection proven by the book test or the vendor's rig data, vapor path leak-checked where emission classes apply, and operators trained on the actual arm's balance and parking behavior. The as-left record, envelope overlay, test pressures, ERS function signatures, and torque values, is the baseline the maintenance program trends against, and the spill and drive-away procedures are written into the station's operating book with the arm's specific behavior in them, not generic text.
The standards frame divides by market. Fuels and vapor emission duty answer to API RP 1004 for bottom load couplers and the vapor recovery and loading rack standards family; marine oil, chemical, and gas arms answer to OCIMF design guidance and the classification society approvals the port and charterer demand; cryogenic arms carry the industrial gas industry's equipment standards and the pressure equipment codes of the jurisdiction, with type approval on the safety devices. Pressure parts and swivels are tested and certified to the applicable pressure equipment code, and the breakaway and ERS devices carry their own function test certificates. As with all terminal hardware, the specification names the applicable set per subsystem, because no single loading arm standard covers the machine end to end.
Failure modes follow a short, predictable list. Swivel seal wear and weeping: the scheduled reseal is the cure, and the symptom is visible product or vapor at a race, which is the arm failing safely and loudly compared with hose; the discipline is doing the reseal when the weep appears, not when the drip reaches the pad. Swivel stiffness and corrosion from environment: rotation torque climbs, operators jerk, and welds fatigue; torque checks at the maintenance interval catch it, and lubrication or reseal follows. Balancing drift: springs sag and counterweights get modified by well-meaning welders; periodic rebalance keeps the arm neutral. Breakaway and coupler wear: latches, poppets, and seals at the connection face are consumables with inspection cycles, and a worn coupler is the leak the driver reports first. Drive-away and drop events: the safety layer exists for them, and after every activation, real or test, the device is replaced or recertified before the next load, without exception, because a spent breakaway is a decorative fitting. Cryogenic icing at swivels and vents: design mitigations and procedures share the work.
Maintenance economics are cycle-driven and modest when scheduled. Daily, by operator: wipe-down inspection of the connection face, park check, and the visible weep scan. Monthly: rotation torque spot check, balance check at mid-envelope, breakaway and coupler inspection with latch and seal condition logged. Quarterly: full envelope sweep, fastener torque on swivel caps, lubrication per the manual, vapor path leak check where emission classes apply. Annually: reseal or inspection per the certified cycle plan, ERS function test with water where fitted, structural and coating inspection on marine duty, and the spare kit inventory audit against the manual's schedule. An arm with its cycle log and torque trend current is a machine whose reseal happens on a Tuesday and whose drive-aways end as near misses, which is the entire safety promise of the hardware, kept.
FAQ
Why choose a loading arm over flexible hoses for a loading bay?
Cycles and consequences. An arm is rigid pipe with precision swivels: no aging elastomer carcass, a defined reach envelope the station engineers around, visible wear at a joint instead of silent failure inside a hose, and integrated safety layers, breakaways and emergency release, that hose strings cannot carry. At a bay loading many vehicles a day with spill-averse products, the arm's premium repays in maintenance and incident avoidance; at low cycle or mobile duty, hose remains the honest answer.
How is the working envelope of a loading arm determined?
From the fleet, not the catalog: the manifold tables of every vehicle class, their height and lateral offset range, the settling allowance of loaded suspension, 100 to 200 millimeters on tankers, the approach distances, and the parking envelope with a realistic mispark margin. The vendor overlays the arm geometry on that rectangle and signs it. An arm quoted with a generic reach figure and no fleet overlay has not answered the geometry question the station actually has.
What is the difference between top loading and bottom loading arms?
Top arms swing over the hatch and lower a drop tube into the vapor space, following the settling vehicle, and pair naturally with vapor recovery arms; they serve legacy fleets and products without bottom outlets. Bottom arms connect under the trailer at a standardized dry-break coupler, load faster with less turbulence, enable vehicle pre-trip checks, and dominate modern fuel terminals. The fleet and the emission rules set the mix, bay by bay.
What does an emergency release or breakaway coupling actually do?
It converts a drive-away from a line rupture into a sealed separation. Land-duty breakaways part at a defined pull force and valve off both ends, limiting the release to the volume between device and coupler. Marine emergency release systems pair quick couplers with double isolation valves and part the line on command or overload with product safely trapped on both sides. The purchase data that matters: separation force, reseal proof after test, and full-open flow capacity, because an undersized breakaway restricts the station and an oversized one will not part when it must.
What swivel maintenance should I plan for?
Treat swivel seals as scheduled consumables with a certified cycle life: rotation torque spot-checked monthly, reseal at the weep stage rather than the drip stage, and the spare seal kit bought with the arm, first order, not after the first leak. Each swivel plane is both a bearing and a leak path, so balance kept true and torque kept low are the life extenders; a jerked, misbalanced arm fatigues swivel welds no reseal can fix. The maintenance manual's cycle schedule is the plan; the cycle log is its evidence.
What standards apply to loading arms?
By market. Fuel bottom loading couplers follow API RP 1004, with vapor recovery and loading rack practice in the standards family around it. Marine oil, chemical, and gas arms answer to OCIMF design guidance and classification approvals for the berth. Cryogenic and gas arms carry industrial gas equipment standards and the jurisdiction's pressure equipment codes, and safety devices carry their own function certificates. The RFQ names the applicable set per subsystem, because no single standard covers the machine end to end.
Can one arm serve multiple products at a rack?
Yes, within a materials and seal envelope that covers every product on the list, verified by the compatibility dossier, plus a changeover discipline that may include draining, purging, or CIP between grades. The honest specification writes the full product list, including future grades the terminal plans, and buys the seal and gasket package against the worst of them; the arm that handles the average product and not the aggressive exception has an expensive retrofit in its second year.