A jib crane lifts and positions a load within reach of a swiveling boom. A hoist raises or lowers the load, and a trolley on many designs moves along the boom. The boom's rotation places the hook at different angles around a fixed pivot. The pivot may sit on a freestanding mast, attach to a building support or belong to a system with more than one arm. A jib fits a workstation when that combination of radial, angular and vertical motion reaches every required pick and deposit point.
The two measurements most often mistaken for working coverage are overall boom length and catalog rotation. The hook cannot necessarily reach either end of the boom, and a collision or utility tether may restrict sweep before a nominal stop. Review actual coordinates, loaded clearance, the combined hoist and trolley configuration, and support reactions before agreeing a model or pouring concrete.
Evaluate load, layout and installation as one lifting system. A suitable boom with insufficient headroom, an unapproved slab or an incompatible trolley is an incomplete selection.
Chapter 1 / 06
What a jib crane does at a workstation
A typical workstation jib has a mast or brackets, a rotation assembly, a horizontal boom and a trolley carrying a hoist. Loads move vertically under the hook and radially along the boom. Slewing adds angular travel about the support. Depending on the design, any of the motions may be manually driven or powered. A tool suspension jib can carry a balancer or handling tool rather than a conventional hook block. Establish the actual application at procurement because a tool support, a handling manipulator and a general-purpose hoist can present different operating limits, maintenance duties and verification requirements even when the boom profile looks similar.
A single-girder crane or an overhead bridge crane normally uses runway travel to serve a broad rectangular area. A gantry crane carries its bridge on legs. Those systems can supply a workstation from a shared plant route, while a jib serves a smaller local envelope independently. A stacker crane moves storage loads in an aisle and is selected around rack geometry and automated inventory, rather than an operator's working positions. Map the handoff point between systems where two are used together. Each hook and carried load needs a separate unobstructed envelope.
The fixed support distinguishes a workstation jib from a relocatable or large construction lifting system. A mobile crane, truck-mounted crane, crawler crane or tower crane may have a component called a jib, but the products are procured for different setup conditions and load charts. Do not reuse a machine's capacity assumptions across that boundary. A jib serving a dock may be approved for use at a fixed outdoor location with its own environmental and structural conditions. It needs a contract definition for weather, operating area and load position even if its movement is limited.
Consider a machining cell that lifts an awkward fixture from a cart into a machine. The source and destination could both be inside a circular drawing yet the load could hit the enclosure on the way. Plot the cart clearance including wheels and handles, required placement orientation, hook slide direction and the operator's position. Include the height of the fixture, any spreader, sling and hook block. If a suspended load must pass between doors or between adjacent machines, document its swept corners across the entire maneuver. The accessibility of a destination depends on what can travel there at full geometric size.
An effective jib selection often starts by observing the real material move during a shift. Note how a load is secured in the carrier, where staff stand, which tasks are repeated, and where a second person may enter. The largest part by mass may not be the worst part by length, offset or required approach. Include optional workholders and parts staged on atypical pallets. Where a crane scale is intended, include its mass and height in the lifting and clearance budget and establish whether the operation needs a weight indication only or a separately verified weighing function.
The purchasing boundary can include the support steel and foundation, or stop at loads and fixing details delivered by the supplier. A bare boom offer might exclude the trolley, hoist, electrification and stops. Ask suppliers to enumerate all included components and who signs off the assembled compatibility. If the jib replaces a similar crane, use the current supports and riser only after verifying their condition and suitability for the new reactions. Differences in empty weight, attachment geometry, duty and hook radius can change the loads on a support without increasing the label capacity.
Chapter 2 / 06
Mounting arrangements, boom types and rotation
A freestanding jib uses a mast anchored to an engineered base condition. It can serve multiple sides of a station where there is floor space for the mast and sufficient clearance to swing. A separately founded assembly, a base with requirements for the existing slab and a manufacturer-approved portable base are different structural configurations. The fact that an example is floor-mounted does not establish allowable install conditions. Request the exact anchor and floor requirements, the support envelope outside the base plate and the reactions for the worst specified condition. Concrete grade, reinforcement, slab interfaces and site services require a project review.
A wall or column jib clears floor space but transfers force and moment into the building. A bracketed configuration may use a tie member above the boom, which consumes headroom above its sweep. A wall cantilever can put the boom closer to an overhead obstruction, subject to the mounting geometry and strength of the support. Provide section dimensions, attachment zones and clear heights. A supplier drawing should show bracket spacing and forces, not only the hook load. An existing building column may serve other loads that reduce the capacity available for a jib. Responsibility for reviewing the complete structure should be assigned in writing.
Enclosed track constrains the matching trolley wheels inside a shaped section with a slot for suspension. It can provide a light, easily positioned boom for repeated workstation moves when correctly selected. A structural I-beam can support a wider range of specially selected trolleys and configurations, but the flange width, flange shape, running surface, clearances and attachment requirements matter. The two tracks do not accept the same trolley as a class. Check compatibility including wheel flanges, lateral adjustment, end stops, anti-drop features where specified and where the suspension will hang. Report whether a hoist and trolley combination has already been verified by the crane supplier.
An articulating jib uses a secondary pivot so the load can move around a local obstruction or close to the support. Its outer arm and connected services create their own collision envelope. The working area is not simply the sum of the arm lengths. Ask for an envelope including actual articulation limits and the approach to the minimum reach. Multi-joint motion also changes the effort needed to reposition a suspended load, especially near singular or folded geometries. Compare the movement with the actual fixture and operator positions. If a jib needs only a straight radial path and an open sweep, the simpler arm may be easier to coordinate and service.
Gorbel lists its freestanding enclosed-track WSJ360 with 360-degree rotation, spans up to 16 ft and capacity up to 1,000 lb [1]. The maxima describe the product family. Verify the model combination and options in its tables or quotation. Its brochure identifies the wall or column WSJ200 with 200-degree rotation [2]. Treat these as published choices for those families, not design values for every workstation. Rotation may be further restricted by nearby structures or by an electrical or air feed. If the task genuinely requires continuous turns, distinguish that from one full geometric sweep with stop-limited utilities.
Mounting or boom type
Typical layout problem
Selection evidence
Freestanding mast
Coverage on several sides of an open workstation
Base geometry, rated configuration, support reactions and actual sweep
Wall bracket with tie
Clear working floor with space above the arm
Bracket and tie-rod clearances, column review and force schedule
Wall cantilever
Space above the boom is constrained
Attachment spacing, support limitations, available hook height
Enclosed track
Repeated light positioning with matched rolling gear
Trolley compatibility and effort or lift-tool trial
Structural I-beam
Application needs a compatible structural trolley system
Exact flange profile, wheel fit, duty and end-stop arrangement
Articulating arm
Load must go around a local feature or toward the pivot
Loaded two-arm motion plot with utility and personnel clearances
Chapter 3 / 06
Hook coverage, lifting load and duty
Produce a plan and elevation for each operation. In plan, take radial and angular coordinates from the actual rotation axis. Mark the nearest and farthest reachable hook center after allowing for the trolley body, buffers and support at the boom root. In elevation, distinguish floor-to-underside-of-boom height, highest attainable hook position, usable lift and landing elevation. A long lifting path can need reeving or lift distance beyond what the selected hoist ships with. A headroom dimension on a bridge or enclosure drawing may not use the same reference point as the crane supplier. Agree a drawing datum and hook reference before comparing proposals.
Evaluate clearance with the boom in its loaded condition. Structural deflection can lower a hook path or change how a manual trolley behaves. The moving package, sling angle and tooling can occupy a larger volume than the centered hook. A suspended object also needs allowance for controlled starts and stops in the planned operation. The building needs the sweep of the boom, power or air service and collector in addition to load clearance below it. If two stations overlap, both crane envelopes, any robot operation and safe access for workers should be considered jointly. The intersection can require a procedural or engineered restriction to the use of both stations.
Support reaction depends on more than the rated payload. As a screening example, a static vertical load of 4 kN at a perpendicular horizontal radius of 3 m contributes 12 kN m of moment about the support. This simplified number excludes boom weight, trolley and hoist weight, acceleration, wind, fatigue and support geometry. It is not an anchor, column or foundation design input. Use the vendor's reaction schedule for the actual model and load conditions and have a competent structural reviewer check the installed system. Record whether the loads are applied to a base, brackets or a support frame.
A rated hook load and a component capacity do not necessarily use the same mass inventory. Ask how rigging, a vacuum tool, a magnet, a lifting beam or a scale are treated. The selected hoist, trolley, boom, suspension and below-the-hook hardware must be compatible and clearly rated for their part of the system. Establish how the design deals with off-center payloads at the hook and distinguish them from pulling a suspended load sideways. An operator should have accessible rigging information for the real parts, and the purchase documentation should reflect the intended vertical lifting service. Unsupported assumptions about side pull should be treated as a design issue.
Duty describes how often and how heavily the crane works. A maintenance jib lifting a pump at intervals and a production station positioning dozens of items each shift can share a load rating but differ in service. Provide anticipated cycles per operating hour, lifts per shift, load distribution, travel lengths, time at load and multi-shift use. Include motor starts, the proportion of low-speed positioning and expected ambient conditions. Ask how the vendor converts the operating schedule into the applicable duty recommendation for the supporting structure and electromechanical components. A suitable hook capacity can coexist with an underspecified motor or brake for a repetitive operation.
Manual travel needs an agreed ergonomic criterion using a representative load and floor arrangement. Specify whether the operator can approach, guide and control the load through the whole planned path. Powered slew or trolley motion can reduce manual effort while introducing acceleration, speed control, brake and limit requirements. An AC motor coupled through a gearbox may provide powered motion. A variable frequency drive can be part of a motion control package under the relevant drive and brake design. A soft starter does not supply equivalent speed control. Ask for the complete motion and braking response at the installed hook.
Coverage item
Required measurement
Consequence if omitted
Minimum hook radius
Pivot axis to nearest usable hook center with loaded trolley configuration
Parts staged near support can remain unreachable
Maximum hook radius
Pivot to farthest usable hook center before buffer travel
Nominal beam span overstates reach
Top hook position
Highest hook reference above site datum with selected hoist and trolley
Insufficient vertical clearance over machine or rack
Slew sector
Degrees of travel, mechanical restrictions and utilities under operating conditions
Load cannot take the planned route or threatens adjacent space
Loaded envelope
Volume of hook, rigging and part along complete move
Geometric centerline checks miss attachment or product collision
Chapter 4 / 06
Key specifications for the crane package
Submit a load list and a dimensioned layout with the RFQ. Identify weight and overall shape of each bounding assembly, with fixtures, slings and other devices listed separately. Define work radius, sweep, hook height, hook travel and landing points. Identify adjacent cranes and machinery, roof beams, cable trays and pedestrian routes. List all hoist, trolley, arm, shelter and weather details that must fit physically and functionally. Ask each bidder to break out the options so it is possible to see what changes with a different hoist or location. A proper proposal supplies a drawing bearing the selected series, exact mount and rated configuration.
Specification
Purchaser input
Required document
Rated lifted load
Heaviest load plus declared attachments and anticipated duty
Whole-system rating and each applicable component rating
Arm and track
Hook radii, hand travel or powered motion, trolley interface
Track drawing, travel limits and compatible suspension details
Structure
Slab or column condition, attachments and site constraints
Vendor reactions and approval by responsible structural designer
Lifting equipment
Hook approach, lift, speed and control location
Complete hoist data and assembled headroom drawing
Slew
Required sector, stop location, motorization and utility route
Sweep diagram showing mechanical and control limits
Electrical and ambient
Power, dust, water, temperature and area classification as applicable
Cabinet, components, feed and enclosure documentation
Service and inspection
Use schedule, access restrictions and required commissioning
Installation, inspection and test plan with defined responsibilities
Trolley selection controls important dimensions. A modest increase in hoist body height can remove the remaining clearance above a fixture. A trolley that fits a nominal beam size may need a particular flange range or a different wheel profile for the actual section. Ask the supplier to document both clearance and suspension spacing, including side clearances, stops and cables or hoses. Check the effect of a service replacement from a different supplier before depending on interchangeability. Pair the physical drawing with the agreed lift height and working travel on the exact equipment, because the same family name can conceal different installed dimensions.
Slew assembly parts vary by design. The supplier may select a tapered roller bearing for a pivot arrangement, another roller bearing for a different load path or a suitable ball bearing for another mechanism. An angular contact bearing or shaft carried in a pillow block can appear in related rotary hardware. These terms do not establish acceptable substitutes. Specify the pivot assembly the manufacturer has rated, plus service intervals, replacement details and clearances. Request criteria for rotational effort, wear and play from the manufacturer responsible for the assembly.
The planned supply and auxiliary equipment determine cable or hose routing. A controlled limited-rotation design can use a suitably routed trailing feed, while continuous rotation requires a compatible collector or swivel for the services involved. The thread of a utility line and electrical terminal compatibility cannot be inferred from a boom dimension. A hydraulic power unit might be used for a specified auxiliary tool rather than serve the crane itself. List every service following a moving arm and ask the vendor to specify allowable movement, clearance, strain relief and service isolation. Unit drawings should show utility connections in their worst occupied state.
Where the site has a hazardous-area classification, identify the exact area data and design obligations before tender. An explosion-proof motor label on one component does not establish suitability of electrification, switches, brakes, controls, assemblies or mechanical ignition considerations. Require documentation for the complete equipment as installed under the applicable jurisdiction and project classification. Outdoor duty also requires an explicit environmental envelope, including the vendor's limits and precautions for weather, exposure and corrosion. A protective finish alone does not qualify an indoor unit for exposed service.
Chapter 5 / 06
Building interface, safeguards and serviceability
Obtain an installation submittal showing all support reactions, base plate or bracket details, tolerance and clearances. The design reviewer needs the actual support structure, not a generic concrete note. In retrofit work, existing drawings can omit slab cuts, underfloor conduits, construction joints and reinforcement conditions. The responsible party should establish the verified basis for the anchorage review before committing to anchor locations. Wall-mounted systems require compatible support stiffness and attachment design as well as adequate ultimate capacity. Preserving the selected mounting hardware and a record of the approved configuration makes future crane changes easier to evaluate.
Review how the hoist and motion controls work with the rest of the cell. A limit switch can report or restrict an agreed motion, and a safety interlock switch can implement a particular safeguarded state when it is selected and validated for that function. A PLC or an HMI panel might coordinate information with another machine. Keep status indication separate from the verified safety response. A safety relay only performs a defined function with compatible inputs, outputs and architecture. An emergency stop must be integrated into the agreed response, including how load holding is maintained when motion ceases.
A crane that overlaps an articulated robot or automated transporter needs a separate interface assessment. Lifting tasks can take the operator across access boundaries while the suspended load projects beyond the usual approach. An access control system that identifies people does not itself validate machine safeguarding. A safety light curtain or a safety mat could be part of a specific risk-assessed station design, with stopping distances and coverage demonstrated. If two-hand control is proposed elsewhere in the integrated cell, confirm what function it protects and how it interacts with lifting and holding the load.
Vendor literature is a starting point for identifying relevant standards. Applicability depends on the delivered equipment and the jurisdiction. U.S. projects may review OSHA 29 CFR 1910.179 for covered crane equipment and ASME B30.17 for jib cranes within its scope, with relevant provisions for the hoist evaluated separately. Have the party responsible for compliance identify the applicable scope and adopted editions rather than specifying a historic product reference as sufficient. A jib, trolley and hoist may come from different suppliers. Require one integrated inspection and acceptance plan with the applicable provisions, records and responsibilities tied to the delivered assembly.
A maintenance plan should make inspections physically possible. Check access to pivot fasteners, trolley wheels, end stops, track surfaces, the hoist and moving cable hardware. Determine how a replacement hoist or trolley would be brought to the crane and removed without creating an uncontrolled load or requiring disassembly of neighboring equipment. Ask for the approved wear and inspection criteria and use the actual operating duty to set inspection scheduling with the responsible reviewer. A site that adds a new shift, tool or work position changes the use case. Require a review of modifications to stops, mounting structure, lifting hardware or load range.
An outdoor loading bay often raises coordination questions not visible in a standard drawing. A roll-up door may project into the swept area, roof drainage may wet an electrical connection and a parked vehicle may prevent a controlled load path. Establish a permitted operating envelope, travel restrictions, wind or weather conditions, parked position and unauthorised-use protection appropriate to the actual equipment and site. Indoor plants also have conditions that change operation, such as washdown, chips, dust or heat near the arm. Include local conditions in the supplier review and test the space as built.
Chapter 6 / 06
Selection, RFQ handoff and acceptance
Start with an actual lift map rather than a generic crane description. Provide the pick and set locations for the largest and most awkward objects. Include any transfer points to another crane or vehicle and state whether the operation requires one or both pieces of equipment to be simultaneously available. Ask the bidder to identify required floor capacity, base anchorage, feeds, protective equipment and commissioning items. Show which include the supplier, which depend on the structural designer and which depend on the installation contractor. Treat unclear responsibilities as bid deviations so the resulting system does not depend on two parties assuming the other one will deliver a critical interface.
Factory tests can check offered equipment, dimensions and some motions before site installation. The site acceptance needs to verify the as-built support, equipment labels, hoist installation, stops and functional behavior at the actual station. Arrange any required load tests and first-use inspections with the authorized party under the applicable requirements and manufacturer's procedure. Record the assembly, dates, conditions, relevant verifications and any limitations. A signed supplier certificate is useful evidence of the delivered component. The installation should also have local evidence that the complete crane can serve the intended load paths with adequate clearance and the agreed controls.
Acceptance check
Evidence to preserve
What is being verified
As-built support
Reviewed support design, fixing schedule and installation record
Configuration matches the reviewed structural case
Delivered ratings
Nameplates, drawing references and hoist or trolley identification
All components agree with the approved bill of materials
Working envelope
Recorded hook radius, height and sweep using the agreed datum
Actual pick and set locations are usable
Verified functions
Authorized test records for brakes, controls, limits and protective functions
Specified motion and fault response are implemented
Operational handoff
Inspection schedule, service documents and defined area rules
Plant can operate and maintain the unit safely
Specify which dimensions the installer must verify before anchoring the crane and which can be recorded during functional checks. At an installed station, sight lines can change when another machine enclosure is fitted or a mezzanine handrail shifts. A machine housing may open into the swept envelope only during changeover. Make those states part of the clearance study. If a short arm still reaches the actual load stations, it may reduce exposure to other traffic and simplify the support. If extra radius is a genuine requirement, ask for the corresponding reactions and duty verification rather than choosing a longer boom from the family list.
Define the point at which the load is supported by its destination and the operator can release the lifting tool. The needed clearance can be larger at this stage than on the main travel path. A vacuum tool may need a specified flat contact patch and spare vertical space to break away; a sling may need room to slacken before removal. Check the destination as it exists during the actual transfer, with temporary supports, runners, open covers and fixtures present. Lay out the handoff using the load center and tool center rather than the geometric center of the equipment. This helps avoid a drawing that is nominally reachable but operationally blocked.
Where a crane will carry regularly repeated loads, establish a baseline for the accepted movement. If manual slew becomes progressively heavier, the plant needs observations it can check before changing lubrication or replacing the pivot. Record position, load used, ambient conditions and the method approved by the vendor when an effort criterion is part of the order. Keep an unloaded baseline and any authorized loaded observations separate. Maintenance also needs to know whether the change is localized at one boom angle or appears consistently through the sector. A support alignment issue and a rolling component fault may require different investigations and different parties to correct them.
If several jibs use a common hoist type, identify what remains unique to each station before standardizing spares. An interchangeability table can show permitted trolley and suspension combinations, load limits, cable or pendant arrangements and orientation restrictions. The use of a shared stock number should be checked against the exact vendor model and the site duty. Where machine access depends on mounting dimensions, keep the as-built drawing next to the parts record. That makes it easier to recognize a dimensional difference that would consume hook clearance or shift the service envelope even though both offered parts meet the supplier's component rating.
A crane purchased for a new production layout should be reviewed again when the cell installer delivers the final aisle and guard drawings. A temporary staging zone or housekeeping cabinet can move the operator's approach away from the original position. Ask the production team to identify where a cart is parked before and after a lift, and where a person can stand when the target point is obscured. When shift operation relies on cues or crane zoning, document the permitted interactions in a form both crews can use. Demonstrate the full intended move after fabrication debris and temporary layout markings have been cleared.
Keep records in a form maintenance can use. Include the approved configuration, selected trolleys and hoists, spare parts, allowed mounting conditions, operating envelope and responsibilities for periodic inspection. Update the records if the plant adds a below-the-hook tool or changes how loads are staged. The acceptance documents should identify which operations were demonstrated and which were excluded. A drawing that shows full circular coverage should still identify mechanical stops, no-travel areas and switched utility restrictions where they apply. Good procurement gives an operator a predictable cell and gives an inspector the evidence needed to recognize changes from the agreed design.
FAQ
How much of the boom span can a jib crane use?
Use the nearest and farthest achievable hook center locations shown for the assembled trolley, hoist and stops. Overall boom length includes space the hook cannot occupy. The support, end buffers and wheelbase affect travel. Check the usable radii from the pivot datum against the actual pick and set positions.
Can a freestanding jib go on an existing concrete floor?
Only when the particular configuration and existing floor meet the installation and structural requirements established for the project. Slab thickness alone does not resolve concrete condition, reinforcement, anchor behavior or reactions. Obtain the vendor's requirements for the exact crane and have the responsible party review the installed support and loading.
What is the practical difference between enclosed track and I-beam?
A matching enclosed track trolley runs inside a shaped section. An I-beam trolley typically runs on or around its lower flange using geometry selected for the section. Select the combination for the load, duty, travel and headroom. Similar rated load does not establish wheel, hanger or end-stop compatibility between the systems.
What does 360-degree rotation mean?
It describes a full nominal circle of boom travel for the rated configuration. Ask if the assembly can turn continuously or has a stopped sweep and whether power, air or other services limit it. A column, cabinet or neighboring crane can reduce usable travel even when the vendor's mechanism permits a full turn.
How do I specify the height under a jib crane?
Give the datum, lowest clearance above the boom, required highest position of the hook and usable lift to the landing point. Include room for the hoist, trolley, hook block, slings and part. A crane with adequate height under the boom can still have inadequate vertical access for the complete rig.
Does a heavier hoist increase the jib crane rating?
The system capacity is determined by the compatible rated configuration, including the boom, trolley, support and lifting equipment. A stronger or heavier hoist cannot independently raise that system rating and may change reactions and headroom. Ask the responsible supplier and structural reviewer to evaluate any proposed equipment or configuration change.
What should be checked before first use?
The responsible parties should verify the as-built support and fasteners, assembled ratings and clearances, movement limits and protective functions. Any required inspections and tests should follow the applicable requirements and manufacturer guidance. Preserve records for the actual configuration along with operator training, service information and the defined working envelope.