A wire guided automatic guided vehicle is a driverless industrial vehicle that follows an energized guide wire set in a slot cut into the floor. A generator drives alternating current through the wire loop, sensing coils on both sides of the vehicle measure its magnetic field, and the steering holds the vehicle over the wire. Stations sit at fixed points, a branch is chosen by switching frequency, and a central controller moves each vehicle through the route in turn. The guidance is the same whether the vehicle is a tugger pulling carts, a pallet truck, a unit-load platform, a fork vehicle or an assembly-line carrier, and it keeps working under oil, dirt and tire wear.
The purchase is a system, not a single machine. The order covers the vehicles, the frequency generators, the wire loops and their slots, the controller and its radio link, the chargers, and the safety verification of the whole. The route is fixed by construction, so most of the engineering sits in the layout: where the wire runs, where it branches, which frequency each branch carries, and where a vehicle must cross a gap. A plant chooses this guidance when the flow is stable, the traffic is dense, the docking has to repeat within a few millimeters, and the floor may be cut. The floor and the frequency plan outlive the vehicles.
Diagram: SpecForge original drawing of how a wire guided AGV follows its path, made for this page.
Four things decide a wire guided AGV purchase. First the route, because its layout fixes the loops, the frequencies and the cost of every later change. Second the guidance chain, meaning generator output, loop current, antenna height and receiver tuning, which set how surely the vehicle holds the wire and finds it again after a gap. Third the traffic and safety design, which decides how many vehicles share the route and how close people may come. Fourth the power plan, which sets battery size and charger count. The vehicle itself is chosen last, by load and transfer method.
Chapter 1 / 06
What a Wire Guided AGV Is and How It Works
A wire guided AGV belongs to the family that the ISO standard for driverless industrial trucks defines as powered trucks designed to operate automatically. That standard describes a driverless truck system as three parts: a control system that may sit on the vehicle, away from it or split between both, a guidance means, and a power system. Here the guidance means is a wire loop in the floor. The job is repetitive transport on a fixed course: carts to a line side, pallets to a rack aisle, coils to a store, or an engine along a row of assembly stations. Nothing on the vehicle decides where the route goes: the wire decides, and the controller decides when each vehicle may move.
Guidance starts with current. A frequency generator feeds alternating current of one chosen frequency into a conductive loop laid in the floor, and an alternating magnetic field stands around the wire. Coils on the vehicle detect the horizontal and vertical components of that field. As the sensor passes over the wire two voltages appear: a sum voltage that peaks directly above the wire, and a difference voltage that reaches maxima on both sides and falls to zero directly above it. The two outputs together give the lateral deviation of the antenna from the wire, and a simple steering loop feeds the difference voltage to the steering drive through a proportional controller. A vehicle controller adds limits and speed-dependent terms.
The sensor set sits low on the chassis, centered on the vehicle and across it, with a matching set at the rear on vehicles that travel in both directions. The control error is the distance between vehicle and wire, and it trims the speed commands of the drive wheels or turns a steering wheel driven by a servo motor until the vehicle is back on the wire. A wire off its true position is handled in software: a 1997 patent on AGV control describes offsetting a vehicle by 2 inches (51 mm) with a term added to the error signal. A wire-detect output drops when the sum voltage falls below an adjustable threshold, which stops a vehicle that leaves its track.
Frequency is the addressing scheme. Each loop, or each branch leaving a junction, is energized at its own frequency, and a vehicle picks its path by listening for the frequency named in its route data. Two guide-wire frequencies, 965 Hz and 1155 Hz, send a vehicle onto one of two paths at a fork in a 1997 patent on AGV control; the receiver alternates its band-pass filter until a significant amplitude shows that the wire is acquired. Current generators offer 16 selectable frequencies, quartz-stabilized to better than 0.02 percent, and a loop current of up to 600 mA. A current multiple-frequency guidance sensor selects one of 8 preset frequencies through 3 digital inputs.
A trip runs as a sequence of controlled sections. The central controller sends speed and path commands segment by segment, by radio and, in classic systems, on the guide wire itself, and keeps a second vehicle out of an occupied section. Along the wire the vehicle passes crossing wires and small passive loops sunk at stations. A receiver channel tuned to the active guide-wire frequency detects these crossings, which serve as position markers. Where the wire is interrupted, at a floor door, a drain or a rail crossing, the vehicle crosses on dead reckoning: rotary encoders on the wheels measure travel, a yaw-rate sensor holds the heading, and guidance resumes when the next loop is detected.
Apart from the guidance set, the vehicle is an ordinary industrial electric truck built for unattended use: a steel chassis, drive wheels with motors and a gearbox, casters, and a 24 V supply for the guidance and control electronics. The guidance chain is independent of the load-handling body, which is why one set of electronics serves tuggers, pallet trucks and fork vehicles. Two properties follow from the physics. The field is magnetic, so oil, dirt and tire wear on the floor do not hide it, and the method has spread through harbors and heavy plants for that reason. The field exists only where a wire carries current, so a vehicle that loses it stops rather than guesses.
Chapter 2 / 06
Wire Guided AGV Types and Structural Variants
Tugger vehicles are the common form for line-side supply. A towing tractor pulls a train of carts, often a platform trolley type with a tow hitch front and rear, and the guidance electronics is the same as on any other wire guided vehicle. The rated figure is towing capacity rather than payload, and the train length sets the straight run needed at each station and the swept width in curves. Loading is by hand or with a manual pallet jack, so a station is a marked stop on the wire rather than a transfer machine. Tuggers suit the supply of many small parts on a fixed run between a store and the points of use, made all day, every day.
Unit-load vehicles carry one pallet or container on a deck, usually a roller deck or a chain conveyor deck that transfers the load onto a fixed roller conveyor at the station while the vehicle stands on the wire. Pallet trucks carry forks that lift a pallet a few centimeters off the floor, take it up at floor level and set it down at floor level, which removes the need for fixed load stands. A wire guided pallet truck keeps the forks and the lift of an electric pallet truck and adds the guidance set. Both types place the deck or the forks over the guidance antennas, and the transfer depends on how exactly the vehicle stops: deck rollers must line up with station rollers or the load jams.
Fork vehicles add a mast. A hydraulic cylinder raises the carriage from a hydraulic power unit on the vehicle, so the machine serves loads at floor level, on stands, and in the lower levels of a pallet rack. The mast raises the center of gravity, so the rated capacity falls as the load is lifted and the curves and slopes of the route are limited to what the loaded truck can hold. Assembly-line vehicles are light-load carriers that move a workpiece or a subassembly from station to station along a production line, sometimes with people riding on them; the ISO standard covers vehicles that carry riders, provided the riders are neither drivers nor operators.
Variants fall on two sides, the chassis and the loop plan. A three-wheel design has one steer-and-drive wheel and two casters; a four-wheel design has two drive wheels on the centerline and casters at the corners and steers by running the wheels at different speeds, which lets it turn on the spot. Each drive wheel is run by a three-phase motor with a VFD or by a servo motor. On the loop side a simple route is one generator, one frequency and one closed wire; junctions add a frequency per branch; long routes are split because long-loop generators drive a higher load impedance; and stations are marked by crossing wires or by passive loops. The floor equipment is the customer's to install.
The boundaries are set by what the vehicle reads. A bar code guided automatic guided vehicle finds its path from coded marks on the floor and needs no slot in the concrete. The AGV robot of the laser or inertial kind measures its position from targets or from its own motion sensors and is rerouted in software. An AMR robot with natural navigation builds a map of its surroundings and plans a free path, which makes it a different class of machine. Two close cousins, magnetic tape guidance read by a magnetic sensor and inductive wire guidance, also bind the vehicle to a fixed path. What separates the wire from all of these is that the path is a physical object in the floor, so a new destination means floor work and a new frequency rather than a change in software.
Chapter 3 / 06
Wire Guided AGV Key Specification Parameters and Standards
The specification of a wire guided AGV comes in two columns, one for the vehicle and one for the floor. The vehicle column lists load capacity, travel speed, lift height, battery capacity, positioning repeatability and the reach of the non-contact detection field. The floor column lists the number of loops, the frequency plan, the generator output, the loop current and load impedance, the antenna height and the length of gap the vehicle may cross without a field. Travel speeds inside plants are commonly 30 to 90 m/min (100 to 300 ft/min), capacities run from about 500 to 30,000 kg (1,100 to 66,000 lb), and the antennas usually ride 10 to 30 mm (0.4 to 1.2 in) above the floor.
A wire guided vehicle stays inside the scope of two standards, because a magnetic field is not a mechanical guide. ISO 3691-4 specifies safety requirements and their verification for driverless industrial trucks and their systems, names the automated guided vehicle among its examples, and covers automatic modes that an operator starts, vehicles that carry riders, manual modes and a maintenance mode. An annex covers the preparation of the operating zone, whose condition has a significant effect on safe operation. It does not cover power sources, towed trailers, freezer conditions, strong magnetic fields or explosive atmospheres. ANSI/ITSDF B56.5 does the same job for the United States: it sets safety requirements for unmanned, powered automatic guided industrial vehicles that are not restrained by mechanical guides, for the system they belong to, and for vehicles converted from manual use. A revision of the ISO document is in development.
The safety equipment is part of the specification, not an extra. Non-contact detection is by safety laser scanners, a rated form of laser distance sensor, on all sides, with an ultrasonic sensor in blind corners. A safety PLC executes the stopping functions and removes power from the drive when a field is broken or an emergency stop button is pressed, and contact bumpers at both ends back up the scanners. The design manual that the US Department of Veterans Affairs issued in 2023 for hospital systems gives strict figures: a full stop at least 12 inches (300 mm) from any stationary object, emergency stop buttons at each end, and at most 12 feet (3.7 m) of dead reckoning on straight travel, with a stop and an alarm if the vehicle cannot confirm its position.
Parameter
Typical value or range
What it decides
Guide wire frequency
965 and 1155 Hz (classic); 8 preset or 16 selectable (current)
Branches per junction and receiver tuning
Loop current
up to 600 mA
Sensing height and margin over floor interference
Loop load impedance
2 to 70 ohms (long loop), 2 to 33 ohms (short loop)
Route length per generator
Frequency stability
better than 0.02 percent
Filter tuning after a splice
Antenna height
commonly 10 to 30 mm (0.4 to 1.2 in)
Sensing height; effect of suspension settling
Lateral path deviation
0.5 inch (13 mm) at most (Veterans Affairs manual)
Clearance and floor marking
Speed in reduced clearance
60 feet per minute (18 m/min)
Braking distance and detection field length
Stop distance from an object
12 inches (300 mm) or more
Scanner field size and block length
Dead reckoning in a wire gap
12 feet (3.7 m) of straight travel (that manual)
Gap placement and odometry tuning
Battery capacity
120 Ah or more (that manual)
Duty per charge and charger count
Travel speed, open floor
typically 30 to 90 m/min (100 to 300 ft/min)
Fleet size and cycle time
Load capacity
typically 500 to 30,000 kg (1,100 to 66,000 lb)
Chassis, wheel loads and floor loading
Chapter 4 / 06
Wire Guided AGV Selection and Duty Calculations
Selecting a wire guided AGV system means fixing the floor before the vehicle. The calculations below size the loops, the fleet, the speed zones, the battery and the traffic blocks, in that order, because each depends on the ones before it. The vehicle is chosen from the results, not before them.
Route design starts on a scaled plan. Mark every station, then draw the wire as the shortest path with curves no tighter than the vehicle's minimum turning radius and straights long enough for the load to settle before a transfer point. Split the route into loops so that each stays inside the load its generator can drive, 2 to 70 ohms for a long loop and 2 to 33 ohms for a short loop on one generator type, and give each branch at a junction its own frequency. Count the gaps where the wire cannot run: floor doors, drains, rail crossings and other breaks in the slab. Each gap becomes a dead reckoning run.
Fleet size follows from a cycle time. Take the moves per hour between each pair of stations, run the round trip at the planned speed with the dwell time at both ends, and add the waiting at junctions and stations where vehicles queue. Divide the hour by that cycle time to get the moves one vehicle can make, allow a margin for charging stops and unavailability, and round up. The result is then checked at the junctions: a merge releases one vehicle per block interval, so the interval times the number of vehicles using the merge must stay below the required flow. Adding vehicles to a crowded loop adds queueing and no capacity. The traffic matrix carries these numbers.
Speed and clearance are calculated together. The stopping distance at a set speed follows from the deceleration the load allows and the response time of detection, and a block must be longer than that distance plus the vehicle and its load. The Veterans Affairs design manual keeps 0.5 m (19.7 inches) between a vehicle with its load and any obstruction, treats anything narrower as a hazard zone to be marked and held to 60 feet per minute (18 m/min), and reduces the vehicle to 30 feet per minute (9 m/min) where a fixed feature forces the front detection to be muted. Open plant floors take their figures from the site risk assessment by the same method.
Battery and charger sizing is an energy balance. Estimate the energy of one round trip from the travel, the lift work and the electronics, multiply by the trips per shift and compare it with the usable part of the battery. Opportunity charging tops up the battery in the short waits the vehicle already has at stations, so the chargers follow the traffic pattern and no battery exchange is needed. The Veterans Affairs design manual sets the terms in one way: batteries of at least 120 Ah, no gas given off in use or on charge, no maintenance more often than monthly, and chargers calculated from battery capacity, travel distance and power consumption. A battery temperature sensor guards the pack on charge.
Traffic control closes the design. The route is divided into blocks that the central controller, usually an industrial PC, assigns to one vehicle at a time, so that two vehicles never enter the same block from opposite ends. Each vehicle carries a wireless module and talks to it through an industrial router or access points along the route, and the control room follows every move on an HMI panel. Where a stop on power loss is unacceptable, an industrial UPS holds the controller and the radio network long enough for a safe shutdown. Ask for the block plan, the radio survey and the stated behavior on wire loss before accepting a layout.
Decision
Question to answer
What follows
Guidance class
Will the route stay fixed, and may the floor be cut?
A wire is justified; a changing flow points to free navigation
Vehicle type
What form does the load take?
Tugger, unit load, pallet truck, fork or assembly-line vehicle
Frequency plan
How many branches leave each junction?
Number of frequencies, generators and receiver channels
Loop length
What impedance does each loop present?
Staying within 2 to 70 ohms, or more loops and generators
Clearance and speed
Where do people, doors and racks narrow the route?
Marked hazard zones at 60 feet per minute (18 m/min) or less
Wire gaps
Where must the wire be interrupted?
Dead reckoning runs of 12 feet (3.7 m) or less, or a passive loop
Traffic control
How many vehicles share the loop and its merges?
Block lengths, radio link and controller capacity
Power plan
What energy does a shift need, and where does the vehicle wait?
A battery of 120 Ah or more and opportunity chargers there
Transfer accuracy
Is the load taken by a conveyor or by a person?
Repeatability figure, deck type and station alignment
Chapter 5 / 06
Wire Guided AGV Installation, Maintenance and Typical Failure Modes
Installation is floor work first and vehicle work second. The loops go in before any vehicle is tuned, and most of the later maintenance goes back to the same slots and the same cabinets. A loop schedule drawn up at this stage saves its cost at the first repair.
Floor work begins with a survey. The route is set out from a datum with the wire on the true centerline of each travel path, because every vehicle will follow that line and not the drawing. A slot is saw-cut along the marks, commonly 5 to 10 mm (0.2 to 0.4 in) wide and 20 to 30 mm (0.8 to 1.2 in) deep, and the wire is pressed to the bottom and anchored so that it cannot float up when the sealant is poured. At a junction the wires cross without touching, each on its own frequency. The slot is filled with a flexible two-part sealant that matches the floor and is cured before traffic returns.
Loop installation is electrical work to a drawing. Each loop is a closed conductor run out from its generator and back, with feeder cable in a cable tray to a generator cabinet. The loop current is set with the trim control on the generator to the value the sensor maker specifies, and the load is measured. A short circuit, a load impedance that is too low or too high and a broken loop all light a fault LED and operate a fault output, which the controller should wire into its alarms. Loops, frequencies and junctions are labeled at the cabinet and recorded in a loop schedule. That schedule is the document every later route change will edit.
Vehicle set-up is alignment. The antennas are set to the specified height above the floor with the vehicle loaded and unloaded, their lateral position is checked against the wire on a straight reference section, and the wire-detect threshold is set so that the signal drops only on a real break. The steering loop is then tuned: gain and limits are raised until the vehicle holds the wire through the tightest curve without hunting, and the speed-dependent terms are set on a test run. Frequency selection is proved at every junction by sending a vehicle to each destination, and station stops are trimmed by moving the crossing wire or passive loop or by a distance offset in the route data.
Measure every loop for continuity, insulation and load impedance.
Set each generator to its planned frequency and loop current, and confirm its fault output at the controller.
Run an unloaded vehicle over each section at low speed and note where it weaves.
Tune antenna height, threshold and steering gain, then repeat the run loaded.
Prove every frequency selection and station stop by visiting each destination.
Test detection, bumpers, emergency stop buttons and signals in every speed zone with a test body.
Hand over the risk assessment, verification file, loop schedule, frequency plan and spares list.
Route changes are the weak point. Adding a station means cutting a new slot into a floor that is in use, splicing a branch into an existing loop or adding a loop and generator, assigning a frequency and teaching the controller the new path, and the work costs a production interruption rather than a software edit. A wire guided vehicle also cannot step around an obstruction: the Veterans Affairs design manual requires vehicles to hold to their marked path and makes the user responsible for keeping it clear, and a vehicle that stops on contact must not restart until a person has looked at the cause. For a flow that changes every quarter the fixed path is the wrong tool.
Routine maintenance is short and mostly visual. Each day the operator checks the generator cabinets for fault LEDs and confirms that the chargers are taking load. At longer intervals the slot sealant is inspected for wear, chipping and lift at the edges, the antennas are re-measured for height because tire wear lowers them, the wire-detect margin is read on the weakest section of floor, and the detection fields and bumpers are tested with a test body. Batteries need clean, dry contacts and a check of the charging history. Worn sections of slot are opened with a floor grinder and re-sealed. The loop schedule is updated after every repair, and a spare generator and sensor are held from the first day.
Failure or task
Symptom and cause
Action
Broken loop wire
Generator fault LED and output; vehicles stop at the dead section. Cause: later saw cut or slab movement
Locate the break, splice, re-seal, enter the repair in the loop schedule
Sealant wear in the slot
Wire exposed or lifted, debris on the path. Cause: traffic or poor preparation
Open the slot, re-bed the wire and re-seal
Antenna height drift
Intermittent wire-detect faults and weaving. Cause: tire wear or suspension settling
Re-measure the height loaded and unloaded and reset the threshold
Steering hunt
Oscillation about the wire on straights. Cause: gain too high, low loop current or loose steering
Re-tune the steering loop; check loop current and steering play
Wrong branch at a junction
The vehicle takes the other branch. Cause: frequency plan error or loops cross-connected
Measure the frequency on each branch and correct plan or wiring
Battery below its duty
The vehicle stops in mid-shift. Cause: too few chargers, an aging pack or a cold store
Review charger positions, test the capacity and replace the pack
Stop after contact
The vehicle does not restart. Cause: bumper or scanner misaligned, or a dirty window
Find the cause, realign or clean, and pass a function test before restart
Chapter 6 / 06
Wire Guided AGV Industry Applications and Procurement Checks
The applications are where a flow has been stable long enough to pay for the floor work. Automotive plants run tuggers and assembly-line vehicles on wires between a body shop and final assembly, and wire guided pallet trucks and fork vehicles between a press shop and a store. Steel and paper mills use heavy-load platforms for coils and rolls, where oil and scale on the floor would defeat an optical guide path. Ports and harbors adopted the method for the same reason, and general manufacturing runs pallet trucks between receiving, a pallet rack aisle and production. The case is always the same: dense traffic, repeatable docking and a route that is not expected to move.
The method does not fit everywhere. A leased building may forbid cutting the slab, a cracked or poorly finished floor will not hold a sealed slot, and a layout that is re-planned with every product turns each re-route into a construction job. The ISO standard sets the outer limits of its own scope: it does not cover severe conditions such as freezer operation or strong magnetic fields, potentially explosive atmospheres or public roads. Some owners rule it out by policy: the 2023 design manual of the United States Department of Veterans Affairs requires a passive guide path and forbids continuous conductors embedded in or on the floor, so its hospitals are closed to a wire guided vehicle.
Integration touches the plant on every side. At a transfer station the vehicle's deck hands a pallet to a roller conveyor inside a safety light curtain or behind a safety fence, with the door interlocked so that the transfer stops when somebody enters. At manual pick points a scanner field protects the person who takes parts from a cart, and an HMI panel calls the vehicle. Where a route passes a door, the controller interlocks the door and the vehicle, and where it passes a lift the same link books the lift. The controller passes completed moves to the warehouse management system. A signal tower light and an industrial buzzer on each vehicle give the audible and visual warning that people on the route need.
A buyer states the route and the traffic first: a dimensioned layout with every station, the moves per hour between them, the load weights and dimensions, the floor construction and level, and the places where the wire must be interrupted. Then the vehicle: type, load capacity, lift height, travel speed in open and reduced-clearance zones, the transfer method and the repeatability it needs. Then the guidance set: the number of loops, the frequency plan, the generator output and loop current, the antenna height and the length of wire gap to be crossed. Then power: battery technology and capacity, charger positions and charging strategy. The supplier should be asked for the risk assessment and the verification file to ISO 3691-4 and, in the United States, ANSI/ITSDF B56.5; the loop schedule and as-built frequency plan as deliverables; the block plan and the radio survey; the behavior on wire loss, loop fault, power loss and a call from the fire alarm; the spares list for generators and sensors; and the procedure and cost of adding a branch later. State clearly who cuts, seals and owns the floor.
FAQ
How does a wire guided AGV follow its path?
A generator drives alternating current at one frequency through a wire loop sealed in a slot in the floor, which sets up an alternating magnetic field around it. Coils on the vehicle measure that field from both sides: a sum voltage peaks directly above the wire, and a difference voltage is zero above it and strongest on either side. The controller uses the difference as a steering error and corrects the steering until the error is zero. When the sum voltage falls below a threshold the vehicle treats the wire as lost and stops. Where the wire is interrupted it counts wheel travel and heading until the next loop is detected.
What types of wire guided AGV are there?
The guidance set is the same on every type; the load-handling body differs. Tugger vehicles pull trains of carts for line-side supply. Unit-load vehicles carry one pallet or container on a deck, often a roller or chain conveyor deck that transfers the load at a station. Pallet trucks lift a pallet a few centimeters and set it down at floor level. Fork vehicles have a mast and serve stands and low rack levels. Assembly-line vehicles move workpieces or subassemblies between production stations. Structurally they differ in wheel arrangement, in steering method, in whether they run in both directions with antennas at each end, and in the heavy-load frames built for coils and dies.
Which specifications matter most on a wire guided AGV?
On the guidance side: the frequency plan, the loop current, the load impedance each generator can drive and the antenna height, because together they set how surely the vehicle holds the wire. Current loop generators feed up to 600 mA and offer 16 selectable frequencies stable to better than 0.02 percent. On the vehicle side: load capacity, travel speed in narrow zones, lift height, battery capacity and the repeatability at a station, which decides whether a conveyor transfer works. Safety figures belong in the same list: stopping distance, clearance to obstructions and the length of wire gap the vehicle may cross on dead reckoning. Ask for every figure with the condition it was measured in.
When should I choose wire guidance over another navigation method?
Choose a wire when the route is fixed for years, the traffic is dense and the floor can be cut. The magnetic field is not hidden by oil, dirt or tire wear, the vehicle repeats a station stop within a few millimeters, and nothing has to be maintained on walls or ceilings. A bar code guided automatic guided vehicle also follows fixed floor marks but needs no slot. An AGV robot with laser or inertial navigation is rerouted in software, and an AMR robot plans free paths from a map of its surroundings, so both suit flows that change. If the building rules forbid conductors in the floor, wire guidance is out before any comparison starts.
What installation and maintenance does a wire guided AGV need?
Installation starts with saw-cutting a slot along the surveyed route, laying and anchoring the wire, crossing the wires at junctions without contact and closing the slot with a flexible sealant. Each loop is then measured, its generator is set to frequency and current, and the antennas, threshold and steering gain are tuned on a test run. In service the work is light: watch the generator fault lamps for a broken loop, inspect the slot sealant for wear, re-measure antenna height as tires wear, test the detection and the bumpers, and keep the battery on opportunity charging. The loop schedule and frequency plan are the documents that every repair and route change must update.
What drives the cost and lead time of a wire guided AGV system?
The floor work and the integration drive both. Saw-cutting, loop laying and the curing of the sealant need access to the floor and are usually done in short lengths between shifts, so the production schedule sets the calendar. Cost grows with route length, the number of loops and generators, the number of junctions, and the number of vehicles and chargers. Vehicles with conveyor decks, masts or heavy-load frames cost more than tuggers. Engineering for the frequency plan, traffic blocks, radio coverage and the safety verification to ISO 3691-4 or ANSI/ITSDF B56.5 is a large share of a small system and a small share of a large one. A later branch means floor work again.
Which safety standards apply to a wire guided AGV?
ISO 3691-4 covers driverless industrial trucks and their systems, including automatic modes that an operator starts, riders, manual and maintenance modes, and the preparation of the operating zone. It does not cover power sources, towed trailers, freezer conditions or explosive atmospheres. ANSI/ITSDF B56.5 is the United States standard for powered, unmanned, not mechanically restrained automatic guided industrial vehicles and their system, and it includes vehicles converted from manual use. A wire guided vehicle is guided by a field and not by a rail, so it stays inside both scopes. In practice that means non-contact detection, contact bumpers, emergency stop buttons at each end, and audible and visual signals.