Stacker-Reclaimer

A stacker-reclaimer is the rail-mounted yard machine that both builds a stockpile and takes it apart again. To stack, it takes material arriving on a yard belt, carries it out along a slewing, luffing boom, and drops it from the boom tip in a pattern that forms the pile. To reclaim, it lowers a bucket wheel at the tip of that boom into the pile face, scoops material into buckets as the wheel turns, and sends it back along the boom belt to the yard belt that leads to the plant. thyssenkrupp names coal, ores, and other bulk materials for these machines, and TAKRAF names ores, bauxite, fertilizers, and salts; what gets bought is the whole machine, boom, bucket wheel, travel gear, drives, and controls.

The reader in mind is the engineer who must specify a stacker-reclaimer for a power plant coal yard, a steel plant ore and limestone yard, a cement plant, an import or export terminal, or a mine loading facility. The page moves from what the machine is to how it is kept running: the numbers an order commits the buyer to, the way the boom, the bucket wheel, and the travel gear work together, the machine forms and their limits, the figures on a data sheet, how to choose between offers and what to write into the RFQ, and how the machine is sited, kept safe, diagnosed, and maintained. The test applied at every step is whether the yard will hold, blend, and deliver its material at the rate the plant demands.

A dry-batch concrete plant with storage silos and a long covered inclined belt conveyor, representative of the bulk-handling conveyor equipment class a stacker-reclaimer belongs to, not the machine itself

Photo: Checkteam, CC BY-SA 3.0, via Wikimedia Commons

A handful of choices settle the purchase: the material, its bulk density, lump size, and whether it is free flowing or sticky; the rates, stacking and reclaiming, average and peak, which set the belt widths and the bucket wheel; the boom length or the pile section it must reach, which sets the size of the machine and the rail gauge; the yard layout and stacking method, which set the blending effect and the segregation; and the operating logic, whether stacking and reclaiming must run at the same time, since one combined machine with a single boom cannot do both. That last answer decides whether the yard buys one machine or two.

Chapter 1 / 06

What a Stacker-Reclaimer Is and What Is Being Decided

In outline the machine runs on two rails the length of the yard, with a travel bogie under a slewable superstructure and a boom of twenty-five to sixty meters, sixty-seven on the largest, pivoted on that superstructure. A bucket wheel sits at the boom tip, a belt runs the length of the boom, and a tripper car riding the yard belt delivers incoming material to the boom belt or accepts reclaimed material from it. Stacking, the boom belt runs outward and the machine travels and turns to lay the pile; reclaiming, the boom belt runs inward while the wheel digs and the machine works across the pile face. Every motion has its own motor, and the reach is limited by the boom, so the yard is laid out around the machine rather than the reverse.

An order for a stacker-reclaimer is an order for storage, throughput, and blending, each with a number attached: a live capacity for a stated material, a stacking rate, a reclaiming rate, a blend of lump and fines delivered to the plant, and a number of hours per day. Boom length, bucket wheel diameter, rail gauge, and the speeds of travel and slew serve those numbers, and a vendor who proposes a machine before seeing the yard layout and a sample of the material is guessing. TAKRAF answers this by designing from the stockyard layout inward, with rock testing, system sizing, and automatic operation in one hand.

Stockpiles exist for three reasons, and the machine serves all three. First, a pile is a buffer: ships, trains, and trucks deliver in batches while the plant burns or consumes continuously, so the yard holds the difference. Second, a pile is a blender: material from several sources is layered into one pile and reclaimed slice by slice across the whole face, which evens out the variation in chemistry and size that a kiln, a boiler, or a blast furnace would otherwise see. Third, a pile is a store: a power plant keeps weeks of coal on hand, and a port holds a cargo before the vessel arrives. The stacking method and the reclaiming pattern decide how well the second reason is served.

The same motions serve very different plants. A power plant stacks coal delivered by rail or sea and reclaims a steady feed for the boilers, with the pile compacted to slow self-heating. A steel plant stacks iron ore, limestone, and coke, and reclaims blends for the sinter plant. A cement plant stacks limestone and corrective materials ahead of the raw mill, often a ball mill, and feeds a rotary kiln that wants a constant chemistry. An import terminal stacks and reclaims whatever its customers bring. A mine or a smelter stockpiles ore between the crusher and the plant, and a fertilizer or grain plant runs the same motions on lighter material.

One machine that does two jobs is an economy with a condition attached. It costs less than two machines, needs one set of rails, one operator, and one maintenance program, and suits a yard where inflow and outflow take turns. The condition is written into its name: a combined bucket-wheel machine performs only one of its two duties at any moment, so a yard where a ship is unloaded while the plant is fed must run a separate stacker and reclaimer, or two combined machines on the same rails. Automatic operation removes most of the labor cost and lets one machine cover a larger yard, at the price of position sensing and anti-collision systems.

A day in the yard shows the machine in both of its duties. A train unloads onto the yard belt; the tripper car transfers the material to the boom belt of the stacker-reclaimer; the boom swings over the first pile, the machine travels its length, and one more ridge of a new layer is laid. Later the plant calls for material; the boom is lowered into the face of the second pile, the bucket wheel starts to turn, and each pass of the boom across the face peels off a slice and sends it back to the yard belt. A belt scale on that belt reports the tonnes delivered, a wheel loader tidies what falls beyond the reach of the boom, and when the shift ends the machine is parked at its anchorage.

Chapter 2 / 06

How Boom, Bucket Wheel, and Travel Do the Work

Stacking begins at the yard belt. Material arrives on a belt conveyor mounted on a fixed trestle beside or between the rails of the machine, and a tripper car, a short carriage that straddles that belt, lifts the belt over two pulleys so that it turns down and empties into a chute. The chute feeds the boom belt, which is reversible and runs outward when stacking. thyssenkrupp lists rigid, fold-down, retractable, shiftable, and counter-directional tripper cars for its combined machines; the differences matter where two machines share one yard belt or where the machine must travel past a stockpile. The boom carries the material to its tip, where a discharge hood drops it onto the pile with as little free fall as the layout allows.

The stacking method decides the internal order of the pile. In cone stacking the discharge point stays fixed and the pile grows as a cone, with fines staying near the center and coarse lumps rolling down the slope, the simplest method and the one that segregates most. In chevron stacking the machine travels steadily along the pile for the whole length of a pass with the boom held at one angle and luffed to keep the drop short, so that each pass lays one long ridge; after each pass the boom is set a little farther across the pile, and the ridges of one sweep across the width make up a layer with a ridged cross-section. In windrow stacking the boom swings from side to side while the machine advances in small steps, building the pile from many narrow ridges, which mixes most and segregates least.

Reclaiming is a cutting operation. The boom is lowered until the buckets at its tip touch the pile face, the wheel is driven, and the machine either slews the boom into the face or travels toward it, so that each bucket takes a slice of material, carries it up and around, and tips it onto a chute that feeds the boom belt, now running inward. The depth of the slice is set by how far the wheel is driven into the pile, and it sets the load on the wheel, the boom, and the belt. A full pass removes a horizontal strip along the face; the boom is then lowered by the height of that strip and the machine repeats the pass, working down the face layer by layer.

Four motions make the machine, and each has its own speed and drive. Long travel carries the whole machine along the rails, commonly at ten to thirty meters per minute in work and faster when moving empty. Slewing turns the boom about the vertical axis on a slewing bearing several meters across, through more than one hundred degrees on each side of the perpendicular to the rails. Luffing raises and lowers the boom, by hydraulic cylinder or by a rope winch, from slightly below the horizontal to around twenty degrees above it. The bucket wheel turns in place, at only a few revolutions each minute, through a planetary reducer. Stacking needs three motions; reclaiming adds the wheel.

The reclaiming pattern decides what the plant receives from the layers of the pile. A bucket wheel reclaiming the full face from top to bottom takes a little of every layer in each pass, so the variation stacked along the pile reaches the plant flattened out; a wheel that works only one end of the pile delivers whatever was stacked there. Pile shape limits the effect: material at the ends and beyond the reach of the boom, commonly a few meters of each end, is left for a wheel loader or bulldozer to push back within reach. Moisture and compaction change the digging force from layer to layer, and a pile left through a wet season digs harder than the day it was stacked.

Automation turns the motions into a program. In automatic operation the control system moves the machine to a start point on the pile, then runs the stacking or reclaiming pattern from a stored pile model, adjusting travel, slew, and luffing against position feedback: an absolute encoder on the travel wheel and another on the slewing gear, with a limit switch at the ends of travel and of slew as backup. A laser rangefinder mounted on the boom tracks the gap from wheel to pile face, and a scanning lidar measures the pile surface so that the model follows the real pile. Where two machines share the rails, an anti-collision system keeps their booms apart, and a safety interlock switch on the gate to the boom walkway keeps the boom belt and the bucket wheel from starting while the gate is open.

Chapter 3 / 06

Stacker-Reclaimer Types and Machine Boundaries

Boom machines name the first type. The combined bucket-wheel stacker-reclaimer, a slewing and luffing boom that carries the bucket wheel at its tip, is the machine this page describes and the one TAKRAF builds for medium to very high rates. A reclaim-only bucket-wheel reclaimer has the boom and wheel and no stacking duty, and works with a separate stacker; a stack-only boom stacker has the boom and belt and no wheel. The pair costs more than one combined machine but allows stacking and reclaiming at the same time, which TAKRAF names as the condition a combined machine does not serve. thyssenkrupp's boom reclaimers work piles on both sides of the track and move between in-line piles by luffing or slewing the boom and then traveling; a yard with several piles may run one stacker and two reclaimers, or two combined machines on the same rails.

Scraper machines name the second type. Instead of a wheel they carry a scraper chain, a heavy conveyor chain fitted with flights that drags material from the pile face to a belt, and they suit material that compacts, freezes, or sticks, and rates below those of a large wheel. A portal scraper straddles a straight pile on leg frames that travel on rails either side of it; a bridge scraper carries its chain on a beam that spans the pile between end bogies, or reaches from the central column of a circular stockyard to a bogie on the ring rail; a side scraper travels alongside a pile and reaches it with a boom. On a circular stockyard the machine rotates about a central column, stacking with a boom and reclaiming with a chain in a ring. Each form reclaims in layers across the face, as a wheel does.

Three neighbors share a word or a belt with this machine and need to be kept apart. A stacker-reclaimer is not a pallet stacker, the pedestrian-operated truck that lifts a pallet on a mast inside a warehouse, nor a stacker crane, the rail-guided machine that deposits and retrieves unit loads and totes from racking in an automated store; those two handle one item at a time under a roof, while this machine handles loose solids by the thousand tonnes in the open air. Nor is a belt conveyor the same machine, though the boom belt and the yard belt of a stacker-reclaimer are short and long examples of it, with their own idlers, pulleys, take-up, and covers. A bucket elevator carries bulk material vertically in buckets on a belt or chain; no stacker-reclaimer uses one.

How the yard feeds the plant marks a second boundary. Where a tunnel runs under the pile, material is drawn from the stockpile by an apron feeder or, in lighter material, by a belt feeder under a chute, and the machine that stacks the pile has no reclaiming duty at all; this is the alternative to a reclaiming machine, and it trades a tunnel and feeders for a boom and a wheel. Downstream, a weigh feeder meters the reclaimed material to a mill or kiln that must be fed by weight. Measurement differs by purpose: a belt scale, which weighs the passing belt on load cells, totals what the machine moves, and a truck scale weighs the vehicles that arrive at or leave the site.

Materials and drives follow the open air and the loads. The boom is a welded lattice of steel tube and section, designed for its own weight, the material on it, the digging forces of the wheel, wind, and ice; TAKRAF names dynamic, material, and seismic loads as the focus of its structural design. The superstructure turns on a slewing bearing and is moved by slewing drives, vertical gear motors that mesh with the toothed ring of that bearing. The boom belt runs on idlers, with its pulleys in pillow block bearing housings; the bucket wheel and each travel bogie have a three-phase asynchronous motor driving through a planetary reducer, joined to it or to the driven shaft by a gear coupling; and most motors run through a VFD so that each motion starts and stops without shock. Power reaches the machine by a cable reel or a festoon loop.

The machine earns its place only because the plant behind it runs continuously and wants a constant feed. A cement plant takes limestone from the yard to its raw mill and rotary kiln, a steel plant takes ore and flux to the sinter plant, a power plant takes coal to the boilers, and a port passes material between ship and train. In each, the yard belt delivers to the plant, and the stockyard machine keeps that belt loaded while the source is idle. In the open, dust is met with water sprays and hooded transfer points, which thyssenkrupp offers as options that the buyer specifies. Where coal is handled in an enclosed yard, the dust is combustible, and motors inside the hazardous zone are explosion-proof motors.

Chapter 4 / 06

Key Specification Parameters

Rates, reach, and the size of the wheel dominate a stacker-reclaimer data sheet, and each figure carries a structural consequence. In the table below, the rates, boom lengths, bucket wheel diameter, rail gauge, lump size, and material classes are the builders' own figures, published by TAKRAF and thyssenkrupp for their machines. Bucket count, wheel speed, the slewing and luffing ranges, travel speed, pile height, the wind limit, and installed power are typical ranges from yard practice, not published ratings. A particular machine is sized from its yard and the test of its material, which fix the live capacity and the blending effect it must achieve. Read the rows that carry a range as a span: in each of them the top of the range describes a different order of structure from the bottom.

ParameterTypical rangeWhat it decides
Stacking and reclaiming rate500 to 20,000 t/hBelt widths; boom and wheel size
Boom length25 to 60 m (82 to 197 ft), to 67 m (220 ft)Pile section reached; machine mass
Bucket wheel diameterup to 14 m (46 ft)Digging capacity; lump size taken
Number of bucketscommonly 6 to 12Volume per cut; digging force
Bucket wheel speedroughly 3 to 8 rpmBucket fill; wear on buckets
Rail gauge6 to 20 m (19.7 to 65.6 ft) on the TAKRAF range, up to 15 m (49.2 ft) on thyssenkrupp'sStability under boom and wind loads
Lump sizeup to 250 mm (9.8 in.)Bucket and chute clearances; belt cover
Materialfree flowing to stickyWheel or scraper chain; chute angles
Slewing rangemore than 100 degrees each side of the perpendicular to the railsPiles on one or both sides of the rails
Luffing rangeabout minus 10 to plus 20 degreesPile height; passing a stockpile
Travel speedabout 10 to 30 m/min workingTime per pass; layer thickness
Stockpile heightcommonly 10 to 20 m (32.8 to 65.6 ft)Live capacity; wind and dust exposure
Operating wind limitabout 20 m/s (45 mph)Availability; parking procedure
Installed powerseveral hundred kW to several MWSupply cable; cable reel or festoon

Several of these figures lose their meaning when they are quoted alone. A reclaiming rate without the material and its moisture is a figure for some other yard, because a wet or frozen pile digs at a fraction of the rate a dry one allows. A boom length without the pile section it serves can leave unreachable ends that a loader has to push in, at a cost no bid showed. A capacity in total tonnes rather than live tonnes flatters the storage statement, because material stranded at the pile ends and under the boom hinge is dead until a dozer moves it. An RFQ that requires the live capacity, the blending effect, and the test basis for each will show which builder has engineered the yard and which has priced a machine.

How the machine is built follows its loads and its weather. The boom is welded from structural steel tube and plate, with high-strength bolts or site welds at the splices; the bucket wheel is a welded box structure with bolted, replaceable buckets edged with hardfacing or ceramic; and the slewing bearing is a very large ring bearing whose rim carries a machined toothed track. Belts are textile or steel cord by length and tension, with covers rated for abrasion and for oil or heat where the material needs it. Travel wheels are forged steel on crane rail. Paint systems and bearings are chosen for an outdoor life of two or three decades, with greasing lines run to every point an operator can reach from a walkway.

Chapter 5 / 06

Selection Decision Factors and RFQ Language

The material, not the builder's brochure, sets the starting point. TAKRAF lists fertilizers and salts, copper, bauxite, gold, and iron ore among the duties of its combined machines, and thyssenkrupp lists coal, iron ore, petroleum coke, limestone, bauxite, lignite, and phosphate; the two lists describe the same machine in different hands. What the buyer must add is the bulk density, the lump size, up to two hundred fifty millimeters on the thyssenkrupp data, the moisture and the range it swings through the seasons, the abrasiveness, and whether the material is free flowing or sticky. These decide the belt width for a given rate, the size of the buckets, the chute angles, and whether a wheel or a scraper chain is the right tool.

Stacking and reclaiming rates are separate decisions that happen to sit on one machine. The stacking rate follows the incoming conveyor: a ship unloader or a train dump that delivers in bursts sets a peak the stacker must take without choking. The reclaiming rate follows the plant: a boiler or a kiln wants a steady feed, and the reclaimer, with any buffer bin ahead of the plant, must cover its highest demand. TAKRAF and thyssenkrupp both top their range at about twenty thousand tonnes per hour, and the belts, the wheel, and the structure follow the larger of the two rates. A stated rate without the bulk density behind it does not size a belt.

Boom length or pile section is the same decision seen from two ends. The boom must reach across the pile section from the rails, which sets its length and its luffing range, and the rail gauge follows, six to twenty meters on the TAKRAF range, wide enough for the superstructure to stand against the overturning moment of the boom and the wind. The number and length of piles follow the live capacity and the number of grades the yard must hold apart. Blending sets the stacking method and the reclaiming pattern: chevron or windrow stacking with full-face reclaiming evens out variation, cone stacking does so only weakly, and a coal yard that will compact its piles cares more about self-heating than about blending.

Whether stacking and reclaiming must run at the same time is the decision that changes the purchase. A combined machine can do one or the other; TAKRAF states that combined machines suit operations that do not need both at once. A yard fed by a continuous source and drained by a continuous plant, a power plant beside a mine, or a terminal unloading one ship while loading trains, needs both at once, and must buy a separate stacker and reclaimer or two combined machines. The second machine brings a second set of drives and brakes to maintain and an anti-collision system to engineer, and the two must share the yard belt and its tripper arrangements.

Cost and lead time concentrate in steel, the wheel, and the erection. A stacker-reclaimer is a fabricated structure of several hundred tonnes, and of a thousand tonnes or more on the largest machines, so its price follows the tonnage of the boom and superstructure and the market for plate and tube; the bucket wheel, the slewing bearing, and the motors are long-lead bought items; and automation, pile scanning, and anti-collision systems are a smaller but real share. Erection on site is a project in itself, with a crawler crane for the boom and the superstructure, and thyssenkrupp answers it with preassembly and precommissioning in its own yard, which shortens the time the stockyard is out of service. Spare buckets, a belt, and travel wheel assemblies ordered with the machine shorten the first interruption.

Ten decisions recur in stockyard projects, and the RFQ should go out only when each one of them has an answer. Every unanswered row returns later as a machine that cannot reach its pile, hold its rate, or do both duties when the yard needs both.

DecisionWhat the buyer statesRisk if left unanswered
MaterialLump size, bulk density, moisture range, abrasion, stickinessBelts and buckets sized for another material
Stacking and reclaiming ratesTonnes per hour, average and peak, for each dutyA machine that chokes on the incoming belt
Boom length or pile sectionPile width, height, and length; number of pilesUnreachable ends; dead capacity
Simultaneous operationWhether stacking and reclaiming must run at onceOne machine bought where two were needed
Rail gauge and railsGauge, rail type, length of travel, foundationInstability under wind; a yard too short to pass
Blending requirementVariation allowed in the reclaimed materialCone stacking where blending was needed
Yard layoutPiles on one or both sides; two machines on one beltA boom that cannot reach or swing clear
EnvironmentWind, ice, seismic zone, dust and noise limitsA structure underdesigned; a permit refused
Coal or reactive materialStorage time, compaction, temperature monitoringSelf-heating and fire in the pile
AutomationAutomatic operation, pile scanning, anti-collisionLabor cost no bid showed

A stacker-reclaimer RFQ should give the yard, the material, and the duty, and ask each vendor to size the machine to them. In full it states: the material with its bulk density, lump size, moisture range, abrasiveness, and whether it is free flowing or sticky; stacking and reclaiming rates in tonnes per hour, average and peak, for each duty; boom length or pile section, with pile dimensions, the number of piles, and whether they lie on one or both sides of the rails; whether simultaneous stack and reclaim is required, and if so how the two machines are arranged; rail gauge and rail type, the length of travel, and the wheel loads and anchor forces the vendor must state for the rail and anchorage foundations the buyer will build; travel, slew, and luffing ranges and speeds; blending requirement and stacking method; dust suppression and hooding, and for coal the temperature monitoring and fire protection; automation level, pile scanning, and anti-collision; the electric supply and its delivery by cable reel or festoon; spare buckets, belts, and wheel assemblies; and the basis of acceptance, a rate test and a blending test on the completed yard.

Chapter 6 / 06

Installation, Standards, Failure Modes, and Maintenance

Before any steel arrives, the site work decides how well the machine will run. The rails run on a continuous concrete beam or on sleepers on prepared ground, set to a gauge that does not drift and to a line that does not settle, because a machine of this mass follows its rails faithfully and a dip in one rail shows up as a skewed boom. The storm anchorage and the rail beam are sized from the wheel loads and anchor forces the builder states, which the civil design takes from the machine data sheet. The yard belt trestle, the tripper track, and the machine rails are built to one survey so that the tripper car transfers without spillage. The machine arrives in modules and is assembled with a crawler crane: travel bogies first, then the superstructure and slewing bearing, then the boom, and finally the wheel, the belt, and the cables. Commissioning proves each motion alone, then the stacking and reclaiming patterns. The storm parking sequence, drilled before the first windy season, runs as follows.

  1. Complete the pass in progress, then stop the bucket wheel and the boom belt.
  2. Raise the boom to its travel position and slew it to the parking angle shown on the machine drawing.
  3. Travel to the storm anchorage at the end of the rails.
  4. Engage the storm anchors or rail clamps, then set the travel brakes.
  5. Isolate the main drives and leave the anti-collision, lighting, and heating circuits live.

The procedure above is the storm parking sequence, and it is written into the operating manual because wind is the load a yard machine cannot escape. An anemometer on the machine reads wind speed continuously and alarms at the operating limit stated by the designer; work stops at that limit, and the parking sequence is run before the wind rises past it. thyssenkrupp fits its machines for noise and dust as well: an on-board water spraying system, and hoods over the bucket wheel transfer point and the conveyors where the buyer specifies them. For coal, the pile itself is the hazard that maintenance must watch, since stacked coal oxidizes, heats, and can reach ignition if a pile is left too long, too loose, or too high.

Standards for stacker-reclaimers are the standards of mobile continuous handling equipment, of belt conveyors, and of machinery safety. Steel structures are designed to ISO 5049 for mobile continuous handling equipment or to the FEM rules for the same class of machine, with wind and seismic actions taken from the structural code of the site. Boom and yard belts are calculated to ISO 5048 or to CEMA belt conveyor practice. Electrical equipment follows IEC 60204-1, safety functions follow ISO 12100 and ISO 13849, and lightning protection follows IEC 62305 on what is often the tallest object in the yard. No product standard defines a blending effect; the buyer's own stacking and reclaiming trials are the reference.

The wheel, the belt, and the large bearings are where these machines give trouble. Buckets wear on their edges and lips against abrasive ore and are replaced before the wear reaches the wheel structure. The boom belt mistracks when it is tensioned unevenly or when material sticks to the pulleys, and a torn belt stops the machine until a splice is fitted. The slewing bearing and the bucket wheel bearings fail slowly by lubrication breakdown and raceway spalling, and they are the parts whose replacement needs jacks and a crane. Chutes plug with wet material, the tripper car drifts off its track, travel wheels pick up flat spots where they slide under braking or stand for long under load, and fatigue cracks start at the boom hinge and the wheel arm, where the digging loads reverse.

Digging hours, more than calendar time, wear a stacker-reclaimer. The intervals below reflect common practice for a machine working daily; abrasive material and the vendor's manual move them, a machine on ore sits at the short end of each range, and one that stands idle most days can stretch them.

ItemTypical actionTypical cadence
Bucket wheel bucketsInspect lips and edges; replace worn buckets; check bolt torqueWeekly to monthly
Boom belt and chutesCheck tracking, tension, cover wear, and splices; clear chute buildupEach shift
Slewing bearingGrease to the maker's schedule; check ring gear lubrication and bolt torqueGrease monthly, torque yearly
Wheel and pulley bearingsGrease; trend temperature and vibration readingsMonthly
Travel wheels and railsInspect wheels and rail head for wear; check gauge and anchorsQuarterly
Boom structureInspect hinge, wheel arm, and splices for cracks; check bolted jointsYearly
Drives and brakesTest the electromagnetic brake on each motion; check drive settings and cable reelQuarterly
Position and safety systemsTrip the emergency stop and each limit switch; verify encoders and wind alarmQuarterly
Coal stockpileProbe pile temperature; compact and reclaim piles in their turnWeekly

A yard that met its rate and blending at commissioning will not keep doing so by default. Material changes: a coal supply of lower rank, an ore with more moisture, a finer product from a new crusher, each alters the digging force, the pile shape, and the self-heating risk, and the pile model and the reclaiming pattern must follow. Rust, paint breakdown, and bolt relaxation are the slow failures on a machine that lives outdoors, and a yearly structural walk with a torque wrench is cheaper than a hinge rebuilt. The yards that get the most from these machines treat the pile as part of the plant, sampled, compacted, and reclaimed in its turn, rather than left to whoever arrives next.

FAQ

How does a stacker-reclaimer work?

Two duties share one rail-mounted machine. To stack, a tripper car takes material from the yard belt and drops it onto the boom belt, which carries it to the boom tip while the machine travels and slews to lay a pile. To reclaim, the boom is lowered until a bucket wheel at its tip touches the pile face; the wheel turns, its buckets scoop a slice as the machine slews or travels into the face, and the material tips onto the boom belt, now running inward, and back to the yard belt. Luffing raises and lowers the boom between passes. A combined machine performs the two duties in turn, never both at once.

What are the main types of stacker-reclaimer?

Types are named by the tool at the boom and by the duties combined. A combined bucket-wheel stacker-reclaimer stacks with a boom belt and reclaims with a bucket wheel mounted at the end of the boom. A reclaim-only bucket-wheel reclaimer works with a separate stacker, and a stacker has no wheel. Scraper machines replace the wheel with a scraper chain: portal scrapers straddle the pile, bridge scrapers span it on a beam, side scrapers work from alongside, and circular-stockyard machines rotate about a center column. Scraper types suit sticky or compacting material at lower rates. None of these is a pallet stacker or a stacker crane, which are warehouse machines.

What specifications matter most on a stacker-reclaimer?

Rate, boom length, the diameter of the bucket wheel, and rail gauge matter most. TAKRAF quotes rates of five hundred to twenty thousand tonnes per hour, booms of twenty-five to sixty meters, and rail gauges of six to twenty meters; thyssenkrupp quotes handling rates up to twenty thousand tonnes per hour, booms up to sixty-seven meters, and bucket wheels up to fourteen meters in diameter. Lump size runs up to two hundred fifty millimeters on the thyssenkrupp data. Slewing and luffing ranges, travel speed, bucket count, belt widths, and installed power decide what the headline figures deliver. For storage, ask for live capacity rather than total capacity.

How do you choose a stacker-reclaimer for a stockyard?

Start with the material and the yard, not the machine. State the bulk density, lump size, moisture range, and stickiness, since they set the belts, the buckets, and the choice between a wheel and a scraper chain. State the stacking and reclaiming rates separately, with their peaks. Give the pile section, the number of piles, and whether they lie on one or both sides of the rails, which set the boom length and rail gauge. Then answer the question that changes the purchase: must stacking and reclaiming run at the same time? If they must, a combined machine will not serve, and the yard needs a separate stacker and reclaimer or two combined machines.

How is a stacker-reclaimer inspected and maintained?

The daily walk covers the boom belt, its tracking, tension, and splices, and the chutes and hoods for buildup. Buckets are inspected for wear and replaced before the wheel structure itself takes the load. The slewing bearing and the bucket wheel bearings are greased on the maker's schedule and watched for rising temperature and vibration, because their replacement needs jacks and a crane. Travel wheels and rails are checked for wear on the wheel and on the rail head and for gauge. Each electromagnetic brake, each limit switch, and the emergency stop are tested on a schedule, and the encoders are read against a surveyed position. Before the storm season the rail clamps and storm anchors are exercised.

What drives the cost and lead time of a stacker-reclaimer?

Steel and the large bought items. The machine is a fabricated structure of several hundred tonnes, and of a thousand tonnes or more on the largest machines, so the tonnage of boom and superstructure and the price of plate and tube set the base cost. The bucket wheel, the slewing bearing, the travel wheels, and the motors are long-lead items, and automation, pile scanning, and anti-collision systems add a smaller but real share. Erection is a project of its own, with a crawler crane on site for weeks, which is why thyssenkrupp preassembles machines in its yard. A yard that needs simultaneous stacking and reclaiming buys two machines, and that decision outweighs any option. Spare buckets, belts, and wheel assemblies ordered with the machine shorten the first interruption.

What safety and standards issues come with a stacker-reclaimer?

The hazards are a machine that moves on rails while people walk the yard, work at height on the boom, stored energy in belts and brakes, dust, and wind. Risk assessment and safety functions follow ISO 12100 and ISO 13849; electrical equipment follows IEC 60204-1; steel structures follow ISO 5049 or the equivalent FEM rules, with wind loads from the structural code of the site. An anemometer on the machine alarms at the operating wind limit, work stops there, and the parking procedure follows, with rail clamps and storm anchors engaged before the storm arrives. In coal yards, self-heating is watched by temperature probes or a thermal imaging camera, and on-board water sprays fitted for dust suppression must be backed by a fire water system.

Sources

  1. TAKRAF: Combined stacker and reclaimers
  2. thyssenkrupp Industrial Solutions: Bucket wheel stacker reclaimers
Ask SpecForge AI