A crude distillation unit (CDU) is the refinery's atmospheric fractionation plant. It heats crude, flashes it into a tower, and separates it into streams that boil over different ranges. Light gas and naphtha leave the upper section, kerosene and diesel-range fractions leave through side draws, and atmospheric residue leaves the bottom. The charge heater, tower, side strippers, overhead system, and circulating heat recovery loops have to operate together to deliver those streams at useful quality.
When buying or upgrading a CDU, establish the crude slate and the receiving units before fixing the heater or tower design. The same daily charge on a lighter crude can move the limit to the overhead condenser, while a heavier crude can expose limits in heat recovery, the flash zone or residue handling. A useful specification gives each credible crude case its own flow, quality and utility conditions.
The useful comparison is a heat and material balance tied to explicit stream guarantees. It connects crude assays and cut specifications with the furnace, tower internals, heat recovery, overhead handling and site utility capacity.
Chapter 1 / 06
What an Atmospheric Crude Unit Delivers
A crude distillation unit accepts a whole crude or blended crude at an agreed rate and delivers several narrower boiling fractions. The tower is called atmospheric to distinguish it from the separate vacuum unit that commonly receives its bottoms. It still needs a defined pressure profile, since the condenser, receiver, internal pressure drop, and overhead gas destination affect the pressure seen by the entering feed. The EIA distinguishes this first stage of refining from the conversion and treating steps that follow it [1]. That distinction matters in a tender: a straight-run kerosene stream can be an input to a jet fuel pool without being a finished jet fuel product.
The crude assay is the starting point for both the yield prediction and the equipment design. A distillation curve relates cumulative recovered quantity to boiling temperature on a stated test basis. A cut point is the boundary used to allocate boiling material to neighboring streams. The plant does not make an exact knife-edge split at that boundary. Separation efficiency, operating pressure, reflux, and side stripping determine how much lighter material remains in a heavy draw and how much heavy material migrates into a light draw. An assay spreadsheet with assumed cut points is therefore evidence about feed potential. A contractual product quality needs a separate refinery stream specification.
Rates and yields need consistent reference conditions. The commercial feed may be reported in barrels per day at a standard temperature, whereas coil velocity, desalter residence, and tower traffic depend on the volume occupied at the local temperature and pressure. A cut yield expressed as volume percent should carry the same reference temperature and product definitions as the feed rate. For a heat and material balance ask the bidder to provide mass flow, reference volume, stream density, and the disposition of gas, water, and minor side draws. Closing a mass balance by putting an unexplained shortfall into fuel gas makes the overhead equipment and the product yield incomparable.
Give the bidder the crude slate with examples of blends actually expected to occur. A light and a heavy assay alone may not capture the maximum salt loading, acidity in a particular boiling fraction, or the light end content that challenges the overhead system. The refinery can define several cases with explicit blend constraints. One may govern heater duty, another may govern tower vapor traffic, and a third may govern sulfur bearing gas or wastewater. Give each case a duty status, such as guaranteed continuous service or limited-time transition. That tells the supplier which conditions must be met simultaneously and prevents a nominal design assay from standing in for an entire slate.
Draw a boundary around the scope on the first process flow diagram. The incoming pipe can be upstream or downstream of the electrostatic desalter, the furnace can be supplied as a separate package, and the heat recovery network can cross into other units. Each boundary changes who warrants a duty, pressure drop, or contaminant level. A battery limit is a physical and contractual handoff. Use tags and connection locations to define it. Where several contractors share a performance guarantee, name the person responsible for reconciling the balance at those handoffs and establish how losses in an owner's existing exchanger train will be characterized.
Input or output
State at the boundary
Decision it controls
Whole crude or blend
Blend shares, rate basis, temperature, salt and water
Upstream treatment, transport pressure drop and available heat recovery
Naphtha draw
End point, vapor pressure basis and destination
Overhead condensation and any downstream stabilization
Kerosene draw
Named quality tests and receiving pressure
Overlap with naphtha and duty of the side stripper
Diesel or atmospheric gas oil
Distillation recovery points and downstream limits
Lower draw performance and hydrogen treating load
Atmospheric residue
Temperature, viscosity and receiving facility
Residue pumps, exchanger fouling and downstream availability
Sour water and gas
Phase, normal and design rates, handling routes
Receiver separation and utilities shared with other units
One useful screening exercise is to ask the refinery scheduler where each cut goes during a routine downstream outage. A kerosene treater, gas plant, or residue receiver may be temporarily unavailable while crude still arrives. A diversion or storage case can change allowable product temperature, vapor pressure, routing, or minimum CDU rate. Specify those commercial constraints alongside the usual maximum rate target. They frequently determine more about the offsite piping or receiver operating envelope than the headline throughput does. A case that requires a unit outage can also be documented as such, so a package vendor does not assume storage that the owner has not approved.
Chapter 2 / 06
Heating, Flashing and Taking Side Draws
Cold crude normally picks up heat from outgoing product and pump-around streams before and after desalting. The exchanger network uses heat that would otherwise have to be rejected to cooling media while bringing crude closer to its furnace inlet target. The total heat recovery depends on the temperature level of the source as well as on the duty available. A lower temperature source can displace utility at the front of the train but may have little use near the furnace. Establish a heat balance at normal rate, a case with fouled exchangers, and a case in which an important exchanger group is out of service. Otherwise only the clean network benefits appear in the bid.
The charge fired heater delivers the remaining heat needed to generate vapor at the column feed location. Its purchase case must describe the crude at each furnace inlet, approximate degree of vaporization through the coils, acceptable tube and process conditions, pressure drop, and fuel conditions. Maximum coil outlet temperature is a design constraint rather than a way to compensate indefinitely for missing exchanger duty. Film temperature and residence are local quantities. A design model should report the limiting coil pass and identify the conditions of uncertainty rather than assume that a measured outlet temperature represents all tube surfaces equally.
The transfer line carries mixed phases from the heater into the flash zone. As the feed enters, vapor continues upward and liquid descends. Momentum handling and distribution at the inlet matter because droplets containing heavy material can be swept into the rising vapor. Near the bottom, stripping recovers light hydrocarbon still dissolved in the residue before the residue leaves the shell. The flash zone, nearby liquid and vapor traffic, and the lower section generally require distinct hydraulic checks. The inlet device receives conditions from the upstream heater and transfer line model, so its owner needs both the magnitude and the quality of the two-phase feed.
A pump-around withdraws hot circulating liquid from the tower, transfers heat to another fluid, and returns it cooler. It sets a localized source of internal reflux and can redistribute vapor and liquid traffic above and below its return. The exchanger duty is useful to the preheat network, but a higher duty changes separation at the same time. A column designer and heat-integration engineer need a common specification for that loop, including temperature approach and design flow at low rates. If a vendor treats the loop as fixed heating duty with no effect on tray loading, ask for the revised hydraulic curves before accepting an efficiency number.
The main column supplies side draws; a side stripper helps control the presence of lighter material in an intermediate draw. Steam can supply stripping in appropriate designs. Some services instead use a reboiler to supply vapor from the liquid itself. In either case check where stripper overhead vapor returns to the main column, since the return affects local traffic and adjacent cuts. The side circuit also has an initial draw location, stream level measurement, flow controls, and the pumps to move product to its destination. Guarantees on flash point or distillation test points should name the installed side circuit and the sample point.
At the column top an air-cooled exchanger or water-cooled surface condenses much of the overhead vapor, depending on cooling design and process conditions. The combined gas, hydrocarbon liquid, and water enter a receiver. A three-phase receiver separates those phases so that gas can go to handling, part of the condensed hydrocarbon can return as reflux, and water can go to compatible treatment. A separate knockout drum may protect the downstream gas equipment where the owner's arrangement calls for one. Review carryover capacity with the highest credible liquid burden, including condensate contributions from stripping steam.
Atmospheric residue leaves as a hot liquid. At an integrated refinery it commonly goes to vacuum distillation. Some sites provide alternative storage or conversion paths. A visbreaker or delayed coker changes heavy molecules and is a separate process destination whose feed requirements must be respected. A light cut may go to an isomerization unit after suitable pretreatment. An alkylation unit generally uses prepared light gas plant streams, rather than a raw tower draw. In an integrated balance each connection should state any intermediate treatment, cooling, or fractionation so that the equipment schedule reflects the real path.
Chapter 3 / 06
Column Configurations and Internals
A relatively simple atmospheric flowsheet sends the heated crude to one main column without a separate front-end flash vessel. It uses equipment in the main shell to handle the light and heavy material together. A preflash arrangement changes that burden by separating some light material before the main charge heater or column. A prefractionator can do a more defined separation than a simple flash vessel. Compare options on the whole flowsheet, including how each vapor or liquid stream rejoins the process. Saving main heater duty under one crude case is less compelling if the added equipment constrains an important cut over the rest of the slate.
An atmospheric topping unit and a more integrated atmospheric unit can use similar separation principles while having different delivery obligations. A topping unit may have fewer destinations and carry a larger fraction forward to a separate processing area. A unit integrated with multiple treaters must maintain usable feed quality and meet narrower pressure, temperature, and delivery constraints at each tie-in. This distinction affects the side circuits and heat integration. The number of nozzles or product names alone cannot establish the scope. Compare process guarantees against a common drawing of outlet points and identify which streams are controlled by the atmospheric unit and which are conditioned elsewhere.
Inside the main shell, trays provide discrete vapor-liquid contacting stages. Capacity checks ask whether the vapor can pass through, whether liquid can leave the tray and downcomer, and whether entrainment becomes excessive. At low load a tray with insufficient vapor support can leak liquid through its openings and lose efficiency before total capacity becomes an issue. Packed sections provide contact across wetted surfaces and rely on distribution across the cross section. They can be useful in sections where duty, pressure drop, and mechanical access make them a suitable choice. Sulzer's refinery brochure discusses trays, packing, distributors, and feed inlet hardware for crude-column services [2].
Treat selection of internals as a set of section decisions. For example, the upper fractionation section must control product overlap and withstand the highest overhead vapor traffic expected under the light feed case. A pump-around section is driven by circulation and energy recovery. The inlet and wash region must deal with feed momentum, heavy droplets, and potentially fouling liquid. A type of internal selected by an owner for one section is not automatically a specification for its neighbors. When comparing bids ask for predicted separation, pressure drop, liquid load margin, installation weight, and access requirements for each affected section independently.
A tower revamp starts with the existing shell and nozzles. Survey findings should include tray ring elevations, actual internal diameter, weld and support condition, removable manway dimensions, and the largest components that can be brought through the access path. Vendor calculations based on a drawing may be accurate for a new assembly and still give the wrong answer in a vessel with undocumented changes. Where the turnaround cannot easily be extended, assign survey responsibility before detailed fabrication, and agree on what can be assembled inside the tower versus what has to pass through as a finished section.
Pattern
Merit to test
Trade-off to resolve
Single main fractionator
Fewer front-end vessels and a relatively direct balance
Upper tower and overhead system must handle the governing light crude
Preflash vessel
Removal of a share of light components before the heater
Return point, pressure balance, and vapor handling vary with slate
Prefractionator
Separate control of one or more light streams
Additional tower duty, controls and blending responsibilities
Tray section
Discrete contacting and familiar inspection access
Capacity, entrainment, liquid drainage and turndown must all match
Packed or grid section
Selection by local pressure drop and washing or recovery duty
Distributor wetting, fouling tolerance and supports become critical
Trays or packing can improve capacity only if surrounding hardware supports the change. A larger throughput may be stopped by a draw nozzle, internal liquid collector, return-line pressure drop, or a receiver boot that was not part of the internals quote. The same logic applies to a taller wash section that improves droplet removal but exceeds the headroom available between existing nozzles. Require an equipment list with each bidder's identified limiting item. In a planned turnaround, allocate tie-in labor and mechanical checks for each item. A claimed percentage improvement backed only by a tray chart should never form the basis of the entire upgrade.
Chapter 4 / 06
Key Specification Parameters for a Comparable Bid
Provide a data sheet arranged by case, with a reference case shared by all bidders. Include the target flow envelope, reference assay, product cut and quality basis, utility conditions, and destination pressure at the furthest delivery point in scope. Ask for plant performance on each case rather than a set of maximum equipment ratings that might never occur together. Where a bid says full rate and deep diesel recovery are both possible, require the stated heat availability, pump-around schedule, and crude blend for both. Those conditions are the part that allows economics to be compared on the same basis.
Data field
Form to specify
Acceptance evidence
Charge rate and slate
Mass and reference volume by named crude case
Reconciled heat and mass balance with design and turnaround limits
Product cuts
Boiling ranges, lab methods and stream tags
Simultaneous representative samples and material balance
Heater operating envelope
Duty, process and tube limits, fuels and emissions basis
Predictions with dirty exchangers and hourly test records
Flash-zone and tower hydraulics
Pressure profile, local load and entrainment reports
Case-by-case rating for clean and credible fouled operation
Pump-around recovery
Duty, return temperature and recipient at each case
Matched hot and cold stream data with fouling assumptions
Overhead system
Condensing load, receiver temperature and all three outlet loads
Seasonal cooling conditions and approved downstream routing
Turndown
Stable operation envelope and excluded transitions
Representative low-rate chemistry, distribution and controls
Corrosion design
Stream-specific chemistry and local material limits
Materials selection report and inspection drawing
Use the term guarantee carefully. Yield is measured from feed and product flows over a reconciled period, while product properties come from sampling and laboratory analysis. A single instantaneous temperature is not the performance test. The specification needs a common averaging interval, required measurement quality, admissible disturbances, and a rule about how inventories are counted. Intermediate product tank level and a vapor meter's density compensation can matter when agreement is close. Defining this before bid lets an owner identify a gauge or sampling point that needs to be included rather than arguing about the missing-data policy after startup.
Pressure is measured at several places for different purposes. Overhead pressure is set by the overhead process and the stable receiving conditions for the gas. Pressure changes through trays, packing, and associated internals along the height of the vessel. Feed and residue lines have their own pressure constraints. Ask that guarantees state absolute or gauge basis explicitly, along with instrument locations. Cooling water pressure, fuel gas pressure, and steam pressure at the supply boundary also use different conventions. A data sheet that mixes these without labels can be impossible to audit even when each supplier has calculated its own numbers correctly.
Material selection is made by service, not by assigning one corrosion allowance to an entire package. Overhead aqueous corrosion is a different problem from hot naphthenic acid corrosion or high-temperature sulfidation. Sulfur, acidity, temperature, local phase condition, and flow can determine different limiting locations. Give the materials engineer the distributions across cuts and expected changes with crude switching. Establish where credible wetting can occur and which piping, welds, bends, or supports require attention. Request a marked set of flowsheets or circuits so that the proposed metallurgy, monitoring, and inspection plan can be matched to the actual stream conditions.
Fouling terms must be comparable. For a dirty shell-and-tube exchanger train, name the fluids, duty, expected pressure loss and cleanability on each side. A plate exchanger in a clean auxiliary service has a different access and fouling envelope from a component handling whole crude. The bidder should say how the clean and end-of-run calculations differ, which streams may be bypassed safely under an approved operating plan, and where fouling history has been assumed. Treat costs for labor, outage duration, and spare bundles as separate estimates that can be validated against the plant's maintenance model.
Utility quotes should identify a steady duty and the capacity required during abnormal but allowed operation. Steam raised by an owner's steam boiler or recovered in a heat recovery steam generator could serve several facilities. Define where stripper steam enters the balance, where a steam drum or existing distribution header is part of the utility scope, and what qualifies a return stream for a condensate polisher. Heat recovery that presumes export demand at all times must also show the alternative heat sink or the approved reduced load when the neighboring unit is unavailable.
Chapter 5 / 06
Selection and RFQ Evaluation
Start bidder evaluation by checking where a claimed economic gain originates. Increasing heavy gas oil recovery changes the yield split and can affect the quality of the next cut or increase downstream load. Reduced furnace fuel may require more cooling or a higher exchanger area. More efficient internals can shift the limiting item from the tower to the overhead receiver. Present operating cost, investment cost, and contractual availability by the same assumptions. A strong bid explains a trade such as recovering more heat while making a bank of exchangers harder to clean. This gives the plant a meaningful choice rather than two incompatible net margin values.
Specify product destinations with enough detail for the vendor to respect the receiving equipment. A diesel hydrotreater can impose constraints on contaminants, distillation range, pressure, and flow that a refinery rundown line does not. An amine unit and sulfur recovery unit are separate acid-gas handling facilities, so the crude unit need only guarantee its relevant stream to the agreed connection. Water from desalting and overhead operation should have explicit handling routes, including the sour water stripper if named in the site balance. Assign how oil content and entrainment are monitored, rather than using a single design number after streams are mixed.
Decide early whether the buyer wants a process design, detailed equipment engineering, a fabricated package, field erection, or performance responsibility across all of them. Relevant bid deliverables include the simulation basis, data sheets, equipment drawings, piping and instrumentation diagrams, layouts, vent and drain interfaces, hydraulic reports, and inspection plans. A local mechanical design contractor can comply with national vessel requirements while a process vendor warrants specific separation results. Document the overlap so thermal design does not get lost between contracts. For a turnkey bid ask which material substitutions require approval and which license rights or calculation files transfer to the owner.
Look for measured evidence when revamping. Actual temperatures across individual exchanger shells, laboratory cut properties at stable operation, and the change in tower pressure drop with rate are more useful than a single historian screenshot. Instrument health can be checked against independent samples and calibrated test equipment during an agreed campaign. Establish whether reported flow combines recycled and fresh liquid, since pumps and trays see internal circulation while economics generally reference fresh charge. A supplier should connect proposed changes to a demonstrated limitation, then show which additional checks become necessary if it changes where the limitation occurs.
Plan the acceptance campaign before the fabrication specification is finalized. Identify who supplies representative feed and how tank blend change or downstream restrictions are handled. Mark the test ports, establish custody of samples, and note which utility suppliers must maintain the agreed boundary during the test. Decide what happens if the operating point moves outside its approved range before the run ends. For turnaround projects an independent baseline can make improvements traceable to changed equipment rather than to a different crude slate or a colder day. That baseline is most credible when the site documents what was in service and which instruments were used.
Include the available plot and construction route in the request. The largest vessel courses may need a different lifting method from the furnace modules. Underground lines, overhead clearance, hazardous area classification, and access for a full exchanger bundle pull can drive the installed cost. Allocate early plot space for sampling, chemical delivery, sour-water transfer, overhead cooling, and emission monitoring. If vacuum distillation is in the same inside battery limits scope, state where the material balance crosses between the units and which party owns residue transfer under both normal and limited downstream demand.
Chapter 6 / 06
Instrumentation, Mechanical Integrity and Readiness
Instrument the process to distinguish causes of a bad cut rather than simply show one bad-quality alarm. Temperature profile, tower pressure drop, stripper flow, overhead receiver phase levels, and draw flow together show whether a problem began in the column or after the draw. A shared data historian should preserve instrument tag, units, quality code, and calibration history for the measurements relied on in a guarantee. The suitability of an oil-in-water analyzer depends on the aqueous stream and expected contaminants. A laser gas analyzer is considered for a specified molecule and matrix only where its sample system and range support the duty.
For the piping and equipment package define abnormal conditions in an approved design basis. The protection design considers credible blocked flows, fire exposure, utility loss, and blowdown requirements under site rules. A relief valve protects a specific equipment boundary and its discharge has to fit the backed-up capacity of the collection system and flare where applicable. Devices for storage such as a pressure-vacuum vent and a flame arrester address different services. They are never generic counterparts to the column's overpressure protection. The engineering team has to certify that any proposed device meets its specific scenario.
Plant observation
Evidence to collect
Review boundary
Higher pressure drop at similar rate
Validated differential pressure and sectional loads
Internal fouling, flooding or gauge-line malfunction
Lighter components in a heavy side draw
Draw and return flows, stripper duty, assay samples
Main column separation, side stripping and sample quality
Rising furnace demand
Exchanger duty, clean versus current pressure loss, fuel quality
Fouling pattern, utility assumptions and heat balance
Oil reaching aqueous treatment
Receiver phase level trends and representative discharge samples
Interface control, receiver internals and emulsion behavior
Corrosion trend after slate change
Local temperature history and stream chemistry from the affected line
New acid or sulfur exposure and the adequacy of inspection intervals
Rotating equipment availability often decides whether a stable column stays online. A centrifugal pump sizing case includes the temperature and vapor pressure of the liquid at suction, available inlet head, and the duty over the allowed envelope. A control valve data sheet should treat flashing and noise as service-specific rather than buying by line size. A globe valve offered for a separate isolation or regulating duty still needs a compatible pressure drop and material specification. Ask for maintainable clearances around actuators and pump seals, and route leakage or drain connections to the compatible closed system.
Mechanical acceptance records should show that components match their approved duties. Vessel support and nozzle fit, tower internals levelness, access for removal, furnace tube materials, and exchanger bundle identification are independently verifiable. For replacements require dimensional checks at known interfaces before inaccessible welds are closed. A competent plant safety review also examines utility loss, compatible instrumentation, corrosion allowance assumptions, alarms and operator training, and appropriate monitoring for hazardous exposure. The project should supply drawings for the installed equipment and a record of authorized changes. These are assets for the next maintenance outage as much as they are commissioning records.
A good handover describes how to recognize declining performance as well as what the new unit can achieve. Commissioning data can establish a pressure drop baseline for each tower section and an exchanger temperature baseline at an identified crude case. It can also show the observed path for oil, water, and gas when the receiving units are stable. Store the heat and material balance input together with the analytical methods and meter calibration data. On the next crude change, the refinery can then distinguish a genuine equipment limitation from a new process condition using evidence tied to the original purchase.
FAQ
What is the difference between a crude distillation unit and an atmospheric column?
The atmospheric column is the vessel that separates the crude into boiling fractions. The CDU includes the equipment that creates and uses those fractions, including the feed preheat and furnace, overhead condenser and receiver, circulating heat recovery, side stripping and product transfer. The exact scope may start before or after desalting. The bid drawing should mark those interfaces explicitly.
Why are crude assays important when buying a CDU?
A crude assay describes how much material boils across the useful range and usually characterizes important stream properties. It supports prediction of yield and sets load and impurity assumptions for equipment design. Bid the actual blend cases rather than promising full rate only on an average assay. The crude with the highest heater duty may not have the highest overhead condenser load.
What does a pump-around accomplish?
It moves hot liquid from a point on the tower through a heat exchanger and returns the liquid cooler. The heat is usually usable elsewhere, and the cooler return changes the internal reflux and vapor loading in that part of the column. The purchasing team should compare heat recovery and separation together, because changing the duty has hydraulic consequences inside the shell.
Does the CDU produce finished gasoline or jet fuel?
Its outputs are normally refinery intermediates such as naphtha and straight-run kerosene. The downstream finishing steps depend on the crude, refinery arrangement and market specification for the finished product. Identify which stream must satisfy the purchased unit's guarantee and which properties are delivered only after downstream treating and blending. A CDU cut name alone is not a finished-fuel specification.
When is a preflash or prefractionator arrangement useful?
It can remove some light material before it passes through the main heater or upper tower, which can be attractive when the light portion of the slate governs a bottleneck. The decision needs a full heat and material balance with the destinations of the separated streams. Under another crude case, extra vessels and controls may outweigh the main-column relief.
How should tower internals be selected?
Rate the relevant stages for the intended liquid and vapor traffic, separation duty, pressure drop, impurity burden and minimum stable flow. The mix can differ by section. At a revamp, compare actual support locations, nozzle sizes and access openings with the vendor's layout. A nominal capacity number has little value if a draw or return line still imposes the old limit.
How does a CDU interface with vacuum distillation?
Atmospheric residue is the heaviest material withdrawn from the atmospheric tower. It is commonly transferred as feed to the vacuum unit, where lower pressure lets more heavy material be separated at a practical temperature. Agree on residue rate, temperature, viscosity, delivery pressure and ownership of the transfer route. A single project can contain both units with separate balance and acceptance points.