Current Transformer

A current transformer reproduces primary AC current at a lower secondary current for metering, monitoring or protection. In a conventional device, the primary conductor or primary winding passes magnetic flux through a core that couples it to a secondary winding. The ratio defines the nominal scale and the stated accuracy class describes performance under specified conditions. Depending on its construction and rating, a CT can also provide the required insulation between primary and secondary circuits. The secondary circuit remains an electrical hazard and needs dedicated terminals, grounding and approved commissioning procedures.

The purchase is defined by the application of each core. A billing meter often needs very good accuracy over its normal and light load range, while a protective relay needs useful current information during a fault that can be many times rated load. A common housing can contain more than one core, with separate winding terminals and performance data. Give each of those circuits its own ratio, secondary current, burden, accuracy class and intended function in the equipment schedule. Purchase of the housing alone does not settle any one core's behavior.

Oil-filled substation power transformer with bushings and cooling radiators, shown as the application environment for instrumentation.

Oil-filled substation power transformer with bushings and cooling radiators. Context photo: Yoshieslunchbox, CC BY-SA 4.0 via Wikimedia Commons.

Specify the range of primary demand and prospective fault current, then select the physical construction, insulation levels and each secondary circuit. ABB's KON data lists 1 A or 5 A secondaries, configurable burdens and several metering and protection classes under IEC 61869-1 and IEC 61869-2 [2]. ABB's BDG instructions use an example nameplate to distinguish the core terminal identifiers, winding ratio, accuracy, output burden and fault ratings of one specific transformer [1]. These documents provide examples of the fields to verify, rather than selections interchangeable across models.

Chapter 1 / 06

What the Current Transformer Measures

A current transformer measures the current passing through a particular primary path. In a window CT, the power cable or bar through the opening is the primary. In a wound-primary design the primary winding is part of the purchased device. The secondary winding connects to the input burden made up of instruments and associated leads. Primary and secondary ampere-turns approximately balance under the stated working conditions. Some primary ampere-turns are required to magnetize the core, and this contributes to ratio and phase-angle error. Secondary winding resistance and the connected burden affect how much excitation voltage is needed at a given current.

Unlike a power transformer or a dry-type transformer serving a load, a CT has a measurement duty. Its specified output burden usually supports an instrument or a current input circuit. A voltage transformer measures a different quantity and has a different connection and operating behavior. A traditional inductive current transformer also requires a suitable secondary circuit whenever primary current flows. An open secondary can develop dangerously high voltage and cause damage or leave a magnetic condition that changes performance. The CT technical documents and site electrical safety procedures govern how the circuit can be isolated, tested or serviced [1].

On a feeder one-line the CT location defines the measured zone. A device installed upstream of a circuit breaker sees current through that point; placing a sensor on the load side can change which conductor section a protection scheme sees as part of its zone. A switch-disconnector can affect which part of the circuit is energized during operations without changing which conductors the CT encloses. Mark primary orientation and positions of every current input on the one-line, protective diagrams and equipment outline so that the intended zone can be checked at review.

When a CT supplies a protection relay, the CT is one component in the chain from primary current to protective action. The relay processes the measurement, applies settings and signals a trip to the designated interrupting device. A supervisory monitoring terminal can display the relay or meter values without being part of that trip path. Separate the sensing and display interfaces on drawings. The same current appearing on a maintenance screen is not sufficient evidence that the correct phase and ratio reach the protection input or that the correct breaker trips when required.

A conventional ratio is expressed as rated primary current divided by rated secondary current. In an illustrative 600 A to 5 A core, 300 A primary corresponds ideally to 2.5 A secondary during operation within the specified accuracy conditions. The connected meter scales this to indicate the primary value. A meter configured for an old CT ratio after a replacement can report a convincing steady current that is wrong at every load. Include both the installed ratio and the configured downstream ratio in acceptance records. Multi-ratio designs also require identification of which physical terminals implement the installed ratio.

Selection starts with the load history and study, not just the upstream feeder frame. For a motor feeder, identify continuous demand and starting behavior. For a station service feeder, identify both operating and restoration conditions. A diesel generator or generator driven by a gas engine can produce fault and normal currents that differ from those when a transformer alone supplies the line. Consider whether protection must remain sensitive under either condition. If the instrument is a tariff meter, ask for its required operating range and owner approval before selecting a convenient ratio from stock.

Chapter 2 / 06

Core and Primary Construction

A wound-primary model incorporates one or more primary turns and has primary terminals for connection. A bar-primary design incorporates a bar as part of the offered assembly. In a window or toroidal design, the conductor from the installation passes through the opening. A bushing CT belongs to a system design around a bushing or comparable conductor arrangement. Buyers need the actual conductor geometry, spacing, installation sequence and available clearances. A fit check should account for lug dimensions, cable bend and screen routing, plus the location and accessibility of secondary terminals after all bus covers and supports are installed.

A split-core window can be useful where a conductor cannot readily be withdrawn, provided the device has the needed insulation, environmental and accuracy characteristics for that use and the installation procedure permits it. The split and latching arrangement is a physical feature, and it does not make every model suitable for a protection or billing circuit. Consider how the core closes, how it is secured and how resistance to vibration or repeated access is documented. A cast-resin block may suit a different application and can have strict dimensional constraints in existing switchgear. Mounting compatibility is a quote requirement even for units with a matching ratio.

Where a CT includes a multi-turn primary or can be reconnected, the vendor diagram must identify the permitted combinations, and the installation method must follow the approved design. A reconnectable secondary can offer useful inventory flexibility without an identical burden rating at every selection. Request data for the exact ratio and terminals that will be used. ABB's KON document illustrates single- and double-core arrangements and variations that can be selected on the primary or secondary side, depending on the model [2]. Class, burden and count of available cores must be evaluated together for the particular order.

Primary formPhysical considerationSchedule detail
Wound primaryPrimary winding and terminals belong to the CT constructionConnection, continuous primary rating, insulation and terminal orientation
Bar primarySupplied bus section must fit the assembly and connecting conductorsBar dimensions, joint geometry, supports and individual phase clearances
Window or bushingInstalled conductor geometry contributes to the measurement arrangementWindow dimensions and installed conductor, screen and cable placement
Split-core windowThe separable construction must satisfy the exact application and physical fitRequired accuracy, latch or assembly instructions and suitable application evidence
Multicore constructionIndependent outputs may be suitable for different functionsFor each core, provide ratio, class, burden and the approved terminal arrangement

Critical distinction follows between a CT with several cores and a CT with several taps. Additional taps on one secondary winding can provide ratio choices for that core. Separate cores can carry different measuring or protective functions, with performance and terminal requirements stated individually. A secondary drawing needs the physical terminal marks for every core, not a list of possible ratios alone. When using a current measured by the relay for supervisory display, confirm any measurement range and accuracy expected of that output. Sharing a primary conductor does not establish that two cores will behave the same way during a fault.

A low-power instrument transformer or sensor may provide a low-energy voltage or digital signal under a different interface from a 1 A or 5 A secondary. Before accepting a proposed sensor, verify the relay or converter input range, mating connector, cable and shield arrangement, transfer characteristics and compatibility documentation. For a residual current or core balance application, the actual conductors routed through the window determine what normal current should cancel. The project engineer needs the conductor arrangement, the grounding and screen details, and the expected protection behavior. A nominal ratio on the schedule cannot substitute for the physical routing drawing.

Separate the installed housing from the environmental assumptions used to select it. An indoor package can still experience condensation, dust or pollution if it sits in a ventilated enclosure at an exposed site. An outdoor unit must satisfy the relevant service and insulation duties, and its secondary terminal box and fittings need their own enclosure and wiring assessment. Give the supplier the actual ambient profile, exposure and mounting attitude rather than relying on a building label. Where the CT is part of a switchgear assembly, ask which thermal and dielectric conditions were verified at the proposed mounting position and which limitations appear in the equipment documentation.

Chapter 3 / 06

Ratio, Burden and Metering Accuracy

Select the primary current ratio to cover credible service current without placing everyday light-load measurements unnecessarily low on the range. The chosen metering class, supported current range and actual burden must together meet the meter duty. A CT specified too large can look conservative for overload while reducing useful accuracy for the annual operating profile. If the feeder grows in steps, ask the bidder to evaluate the first and ultimate load periods separately. The organization responsible for billing may need to accept a CT and meter combination that is different from a general indication circuit in the same distribution cabinet.

The secondary burden is the impedance connected to the winding, commonly specified as rated apparent power at rated secondary current and a stated power factor or other test conditions. Include input devices, lead loop, test block and any other series elements. For a simple resistive illustration, a 0.5 ohm loop would absorb 12.5 VA at 5 A or 0.5 VA at 1 A, since apparent power for a resistance is current squared times resistance. That demonstration excludes the instrument input and does not set an application burden. It explains why the same cable can matter far more on a higher-current secondary.

Where the meter is remote, specify actual conductor size, material, length and route. Loop means the outgoing and returning resistance for the circuit as configured; it is easy to understate burden by counting only the one-way distance. Include any connectors, meters connected in series and installed test hardware. A control cable and shielded cable can have the same wire size but different shielding, routing or product restrictions. Make one party responsible for checking the final installed burden calculation rather than expecting the CT manufacturer to infer the site route from a panel wiring schematic.

The class is meaningful with the specified load, current and test conditions. IEC class names such as 0.2S and 0.5S are examples found in the ABB KON table [2]. Metering specifies both the ratio relationship and phase error over defined conditions, which matters where the meter derives energy from simultaneous voltage and current. A statement of class without burden or range leaves a submittal incomplete. Obtain evidence for the exact core and ratio, and check that the meter's input and intended load range are covered. Do not infer all combinations are possible from the overall portfolio table.

Metering fieldWhat it changesWhat to supply
Rated primary current and extensionSets nominal scale and characterized rangeNormal, minimum and maximum operating currents
Rated secondary currentChanges meter compatibility and lead lossesExact 1 A or 5 A input assignment and lead schedule
Accuracy classSpecifies performance under defined meter service conditionsIntended duty and required current and burden range
Rated burden and circuit loadAffects excitation and accuracy during operationLead loop, test devices, instrument inputs and room separation
Instrument security factorAddresses saturation behavior for a metering core at a defined burdenMeter current withstand and documentation for the contracted core

The instrument security factor, commonly FS, characterizes a metering core's behavior at elevated current under stated burden conditions. A lower specified FS can be useful where limiting the secondary current reaching instruments is part of the design, because the core is intended to saturate under defined conditions. The actual behavior changes with connected burden and device characteristics. An FS marked at rated burden cannot be read as a guaranteed physical limit that applies to every connected meter. Have the designer verify the metering train, including downstream input withstand, both for the selected class and for the system's possible fault conditions.

A panel modernization can change both burden extremes. Replacing an electromechanical meter with a new digital input can lower the series burden, while moving the panel farther away can increase its lead loop resistance. Preserve the old circuit information until the new configuration has been evaluated against the CT's useful operating range and the actual instrument security needs. A meter reading that agrees at middling feeder current does not verify energy accuracy at light load, and a correct indicated current does little to reveal phase displacement. Use the acceptance check appropriate to revenue, indication or protection rather than applying one reference reading to all three.

Chapter 4 / 06

Protection Performance and Fault Ratings

A protection core needs an adequate secondary representation of a primary fault within the application conditions. Large currents can require secondary voltage high enough to drive the burden into a region where the CT core saturates. When it does, the secondary waveform no longer preserves the ideal scaled shape, and a protective relay's measurement or timing can change. Prospective fault magnitude, offset, relay algorithm and winding and lead impedance all influence the result. Before choosing a class, ask the protection engineer to state the intended scheme and CT behavior needed during the most demanding credible system event.

Protection designations such as 5P and 10P, and PX, are offered in ABB's KON data [2]. A P-class quotation should include its accuracy limit factor and rated burden in addition to the class. The accuracy limit factor relates to primary current at the reference protection accuracy limit for the rated burden. PX applications generally call for characteristics such as minimum knee-point voltage, maximum excitation current at a stated voltage and maximum secondary winding resistance, together with the ratio basis specified by the relay scheme. Do not treat a class printed for an overcurrent application as an automatic match for a differential scheme.

The knee point describes a marked change in the relationship between applied secondary excitation voltage and magnetizing current under the stated test method. It is used with the winding, lead and relay circuit characteristics in the appropriate scheme calculation. A knee-point number quoted without a measurement condition or burden design does not establish anti-saturation performance for a particular relay. Require excitation data and manufacturing tolerances where the design depends on them. In comparative protection using CTs on both sides of a zone, phase orientation, ratio compensation and unequal saturation all deserve attention even when the two transformer housings have similar labels.

Protection parameterDesign significanceReadback before acceptance
Protection class and accuracy limit factorDefine protection performance with the specified burden basisCore identification, recorded class and the applicable reference data
PX characteristicsSupport scheme calculations that use excitation and winding resistanceExcitation characteristic, specified limits and core-specific routine data
Short-time thermal currentDetermines ability to withstand fault heating for a stated intervalProject duty, clearing time and equipment rating duration
Rated dynamic currentAddresses peak mechanical effects under stated test conditionsRated peak and relevant assembly or mounting constraints
Relay input and burdenAffect CT performance and effective relay measurementInput type, final loop and verified settings for installed ratio

Rated short-time thermal current and rated dynamic current address different stresses on a CT and its mounting. Thermal duty must be stated with the time interval and checked against the protective clearing time. Dynamic duty deals with peak forces under the specified conditions. The primary conductor supports and equipment structure also have their own mechanical ratings. The BDG instructions show example nameplate fields for both thermal and dynamic duty [1], and the KON table provides examples of model-specific short-time combinations [2]. Do not carry those catalogue figures into a project before comparing them with the required conductor and fault scenario.

Specify highest voltage for equipment, dielectric withstand and installation environment for CTs exposed to the relevant primary insulation duties. A window device can rely on an insulated primary conductor or bushing according to its specific application, while the scope of a CT with primary terminals is different. Use the actual primary placement and clearances rather than assuming a current transformer of similar window size can be accepted in any feeder voltage. IEC 61869-1 provides general instrument transformer requirements, and IEC 61869-2 addresses current transformers within its scope [2]. Identify additional utility, testing and metering acceptance requirements in the purchase documents.

The largest symmetrical current and the most demanding case for a given relay can occur under different network arrangements. A lower fault current with a difficult transient can affect the measurement chain differently from the largest steady-current case, while minimal feed at another location can set the needed sensitivity. Provide the protection engineer's relevant source impedances and clearing assumptions in the study and derive procurement fields from that analysis. If the project needs distinguishable evidence for near-terminal or remote faults, state which of the expected waveform and timing conditions the relay recommendation assumed. Match the CT's contracted data to those assumptions before factory release.

Chapter 5 / 06

Selection and RFQ Information

Issue the circuit schematic and a per-core schedule. Include operating voltage and frequency, primary fault levels with durations, target ratio, rated secondary, expected current range, intended burden and accuracy class. State the physical primary and core construction, indoor or outdoor service, clearances, altitude, moisture or pollution exposure and mounting orientation. For replacement, attach dimensions of the current apertures and terminal diagram and photograph the installed nameplate if available. Request a comparable drawing for the selected option and specify the evidence needed for any proposed deviation. The difference between an engineered alternate and an unqualified substitution is visible in the returned core data.

Put protective and metering ratios on their respective wiring and settings schedules. When an MCC cabinet has motor protection, check whether the current element belongs to the dedicated starter or to a separate feeder relay. A variable frequency drive or soft starter can supply internal values, but specify where the purchased CT measures, what waveform the accuracy claim is based on, and how it will be used. An AC motor started on a line supply may impose a different current range than a drive-controlled load.

Confirm which values reach a PLC, HMI panel or separate metering network through relay communications or an approved transducer. A control dashboard may use the indicated current to manage reactive power compensation, a static var generator or a harmonic filter. Such schemes can have their own current measurement location, phase and bandwidth requirements. Ask for the manufacturer's specified sensor input arrangement and use the selected one-line. A PLC data point can display useful feeder values without providing the direct detector response required by a particular compensation device.

Draw the interfaces for each panel and cable path. A busway application can require the sensor supplier and busway vendor to coordinate bar spacing or supports. Secondary route and cable tray geometry can affect burden and service access. Show terminal protection and cable gland responsibilities, test switch layout and the location of the specified grounding point. For a long secondary circuit with terminations in more than one room, require the bid to name which party supplies wiring drawings and checks continuity and actual burden at site.

In a protected feeder the current measurement point and protective device have separate responsibilities. An upstream fuse or interrupting device may limit the fault duty in a documented arrangement. A load switch or isolating switch can be associated with the operational or maintenance scheme. Treat those details as study inputs rather than changing the CT's assumed withstand without evidence. The feeder vendor should verify the proposed limits with the actual equipment diagrams instead of using a blanket short-circuit value from an adjacent feeder.

For replaceable equipment, maintain a map of what operations continue if a CT core or downstream device is unavailable. An industrial UPS may support relay auxiliary power or metering systems, but it does not by itself restore an unavailable current signal. Ask who owns a failed dual-purpose measurement circuit, which functions the outage affects and whether a separate core would reduce downtime. A procurement case for multiple cores is stronger when it names that operational dependency, confirms the physical fit and includes the associated lead and terminal burden instead of counting every spare tap as a new independent signal.

Chapter 6 / 06

Installation, Test and Lifecycle

Before work on a conventional CT circuit, the qualified team must use the electrical safety and equipment procedures for that installation. Never leave an energized CT secondary open. The documented arrangement for safely shorting, isolating or grounding the particular secondary circuit and handling unused windings is part of its design documentation. Check that terminal equipment has the correct CT function and is positioned for authorized access. The project drawings should identify which work depends on primary isolation, safeguard management and control of the associated relay outputs. ABB's BDG operating instructions describe product-specific handling of the primary and secondary connections [1].

For every installed phase, verify the serial number and nameplate against the per-core schedule, then trace core terminal assignments and polarity through to the meter and relay. With polarity reversed on one phase, a simple magnitude reading can still look plausible while energy direction or residual current is wrong. For a scheme that compares separate measurement points, check which side is defined as entering the protected zone in the project settings. Commissioning evidence must distinguish a ratio measured or checked independently from the value merely entered in software. End-to-end results are particularly valuable after replacement of one of several units.

Acceptance checkTypical evidenceWhy it matters
Nameplate and terminal assignmentSerial, ratio, class, primary reference and per-core terminal drawingIdentifies the delivered article and selected taps
Burden and wiringAs-built lead lengths and measured or calculated loop, with devices documentedConnects accuracy or protection assumptions to installed conditions
Ratio and polarityApproved test record with phase and terminal referencesPrevents scaling or direction errors
Protection circuitDefined functional checks and receiver settings, with trip results as applicableSeparates CT evidence from the entire scheme's response
Engineering recordsExcitation or routine reports and final instrument configurationSupports later diagnosis, replacements and revalidation

A factory routine report describes the delivered device, while site checks also cover wiring and relay or meter configuration. Agree which tests are needed for the circuit's role and how to identify any results that apply to only one core. When ongoing monitoring identifies an unusual reading, compare it with another rate or load record to determine whether the measured process plausibly changed. Investigate crossed phase labels, an unintended tap, a mismatched configured scale or a change to secondary burden through authorized testing. A new power meter may have made a previously hidden CT wiring assumption visible, even if the primary apparatus is healthy.

Retain a clean equipment record when a CT or a downstream device is changed. A replacement of a 5 A input with a 1 A card changes the interface even if both can be calibrated to display the same primary units. Moving a meter or relay to another room changes its wiring basis, and increasing transformer or generator capacity can change prospective fault duty. Check the protection study and current operating profile after those changes, and reapprove the installed geometry and terminal configuration where relevant. Link the final drawing revision to the physical nameplate so maintenance staff can identify which instructions apply.

Where a relay reports incorrect current after a disturbance, record the operating configuration and the comparative measurements before recalibrating any instrument. An error may come from the instrument circuit, installed ratio, burden, phase reference or interpretation of stored records. Look for whether the discrepancy appears under ordinary test loads or only during short-duration conditions. Review the associated breaker or trip records under the approved incident process. If an authorized test identifies a previously unrecorded wiring or settings difference, correct the equipment record at the same time as the affected circuit. This gives the next shift a clear basis for distinguishing a known design choice from a fault.

FAQ

What information does a 600 A to 5 A ratio give?

At rated primary current the nominal secondary is 5 A under the device's applicable conditions. The ratio does not determine insulation class, accuracy, fault performance or output burden. Use the ratio together with the marked core characteristics and downstream instrument settings. For tapped windings, confirm which terminal pair delivers the specified ratio.

What is the benefit of a 1 A secondary?

For the same resistive lead loop, loss at rated current changes with the square of current, so a 1 A circuit can have much lower lead burden than a 5 A circuit. Check that the meter or relay accepts the selected secondary and that all burden and accuracy requirements still match the design.

Does a higher burden rating always improve a CT?

Burden rating is only meaningful with the required class and circuit conditions. Obtain the permissible burden range and any load or power factor conditions for the actual core. The lower and upper operating conditions matter for the equipment's scheduled accuracy and protection response. Include the test block and all series instruments in the burden calculation.

Why would I specify separate metering and protection cores?

The measuring core and the protection core can have different behavior at elevated current, different accuracy requirements and different connected circuits. Identifying each independently lets the designer verify normal measurement and fault response in the same primary installation without assuming one class covers both conditions. List each core's destination and terminal marks on the schematic.

What is the difference between thermal and dynamic fault ratings?

Thermal withstand applies to a current sustained for a stated interval. Dynamic withstand addresses the mechanical effects of peak fault current. Check both against the approved fault study and applicable equipment and mounting conditions. Use the study's applicable clearing interval and peak value alongside the exact equipment documentation to verify both ratings.

Can a CT secondary be disconnected while the primary operates?

An open conventional CT secondary with primary current flowing can create dangerous voltage. Work must follow the approved design and authorized procedures for the particular device, including its required shorting, isolation and grounding provision where applicable. Have the responsible engineer identify the designated test terminals and access restrictions in the approved drawings.

Which details should be kept for a future CT replacement?

Keep primary and secondary ratios, active taps, polarity and core terminals, working burden, class, winding and fault data where relevant, and the equipment dimensions. Also keep the approved test evidence and downstream settings so a future change can be assessed end to end. Save the serial-specific report where later teams can retrieve it.

Sources

  1. ABB BDG 072 current instrument transformer installation and service instructions, 1VLM000655 (PDF)
  2. ABB KON-17 I2C, KON-24 and KON-24 I2C data, 1VLC000528 (PDF)