CD vs Drawn Arc Stud Welding: Spec-Based Process Selection
Capacitor discharge (CD) stud welding suits thin sheet from 0.5 mm and stud diameters M3 to M10 at ≤3 ms weld time, while drawn arc (DA) covers 2-25 mm studs on ≥2 mm plate at 100-1500 ms with ceramic ferrules. Choose CD for clean, automated, thin-gauge work; pick DA for structural, large-diameter,
Read →





































